40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 93 of 341  Not logged in ELOG logo
    Reply  Tue Jan 19 03:04:14 2010, Koji, Update, Electronics, triple resonant circuit for EOM 
    Reply  Tue Jan 19 03:20:28 2010, Koji, Update, Electronics, design complete --- triple resonant circuit for EOM --- 
Entry  Thu Jan 21 10:09:27 2010, Koji, Summary, IOO, Photos of the optical tables 
    Reply  Thu Jan 21 10:31:13 2010, Koji, Update, ABSL, Some preliminary results from measuring PRC's transmissivity for an amplitude modulated beam 
Entry  Tue Feb 2 13:14:09 2010, Koji, HowTo, IOO, Anatomy of New Focus Resonant EOM 
    Reply  Wed Feb 3 01:17:19 2010, Koji, Update, PSL, IFO isn't playing nice tonight 
    Reply  Wed Feb 10 23:15:37 2010, Koji, Update, Electronics, triple resonant EOM ---- preliminary result 
Entry  Wed Feb 10 23:44:56 2010, Koji, Summary, COC, Phase Map Analysis SRM01_HR_RoC_rad_15mm.pngSRM01_HR_RoC_scan.png
    Reply  Sat Feb 13 13:21:53 2010, Koji, Update, Electronics, triple resonant EOM --- liniaryity test 
Entry  Wed Feb 17 19:36:05 2010, Koji, Update, COC, Arm visibility 
Entry  Fri Feb 19 02:38:32 2010, Koji, Configuration, oplevs, Intsant green oplevs for ITMs shooting from the ends 
Entry  Fri Feb 19 13:28:44 2010, Koji, Update, General, Prep for Power Supply Stop  screen_shot.png
    Reply  Mon Feb 22 11:42:48 2010, Koji, Update, General, Prep for Power Supply Stop  
Entry  Tue Feb 23 06:47:57 2010, Koji, Update, General, IFO situations / low power MC lock MC_incident.pngMC_REFL.png
Entry  Wed Feb 24 12:08:31 2010, Koji, Update, Computers, RFM goes red -> recovered by the nuclear option 
Entry  Thu Feb 25 11:21:06 2010, Koji, Update, General, Tanks opened 
Entry  Thu Feb 25 19:59:50 2010, Koji, Configuration, SUS, ITMX OSEMs osem_config_ITMX.png
Entry  Fri Feb 26 11:48:36 2010, Koji, Update, General, MC incident beam shift 
Entry  Tue Mar 2 23:11:43 2010, Koji, Update, SUS, ITMX hung 
Entry  Tue Mar 9 09:32:31 2010, Koji, Summary, General, Wideband measurement of Fast PZT response PZT_response.png
Entry  Thu Mar 11 17:51:04 2010, Koji, Update, SUS, Recent status of SOSs 
Entry  Thu Mar 18 10:46:51 2010, Koji, Update, ABSL, PLL reconstructed 
    Reply  Thu Mar 18 13:40:35 2010, Koji, Update, ABSL, PLL reconstructed 
    Reply  Thu Mar 18 19:00:04 2010, Koji, Summary, Electronics, advantege of our triple resonant EOM 
    Reply  Thu Mar 18 21:42:26 2010, Koji, Update, ABSL, PLL reconstructed 
    Reply  Sun Mar 21 21:02:39 2010, Koji, Update, PSL, EOM waist size 
    Reply  Mon Mar 22 10:07:30 2010, Koji, Summary, Electronics, UPDH Box #17: Ready 15V_power_supply.pdf
Entry  Tue Mar 23 00:31:51 2010, Koji, Update, IOO, MC realigned IMG_2346.jpgIMG_2347.jpg
    Reply  Tue Mar 23 09:55:20 2010, Koji, Update, IOO, vac envelope has to be sealed as antproof for overnight 
    Reply  Wed Mar 24 02:06:24 2010, Koji, Update, IOO, vac envelope has to be sealed as antproof for overnight 
Entry  Sat Mar 27 16:23:10 2010, Koji, Update, SUS, another SRM sidemagnet glued 
    Reply  Mon Mar 29 02:07:50 2010, Koji, Summary, PSL, FSS Work from Sunday: Open Loop Gain 
Entry  Mon Mar 29 18:41:34 2010, Koji, Configuration, SUS, Started to build TTs IMG_2348.jpg
    Reply  Mon Mar 29 18:50:14 2010, Koji, Update, SUS, PRM sidemagnet glued StatusTable.png
    Reply  Tue Mar 30 22:13:49 2010, Koji, Summary, Green Locking, conversion efficiency of PPKTP 
    Reply  Thu Apr 1 07:17:15 2010, Koji, Update, General, PZT response for the innolight 
    Reply  Thu Apr 1 10:47:48 2010, Koji, Update, General, PZT response for the innolight 
Entry  Thu Apr 1 17:35:24 2010, Koji, Update, SUS, Working on ITMX/Y IMG_2353.jpg
    Reply  Thu Apr 1 18:44:40 2010, Koji, Update, General, PZT response for the innolight 
Entry  Mon Apr 5 09:48:57 2010, Koji, Update, SUS, ITMs placed on the tables in the chambers 
    Reply  Mon Apr 5 13:20:16 2010, Koji, Omnistructure, Electronics, soldering iron broken weller_tips.jpg
Entry  Tue Apr 6 22:54:34 2010, Koji, Update, SUS, ITMY (south) aligned IMG_2362.jpg
    Reply  Wed Apr 7 10:58:15 2010, Koji, Update, Electronics, REFL11 Noise Simulation 
    Reply  Thu Apr 8 20:53:13 2010, Koji, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent 
    Reply  Sun Apr 11 19:05:34 2010, Koji, Omnistructure, Computers, Where are the laptops? 
    Reply  Mon Apr 12 22:44:30 2010, Koji, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent 
Entry  Mon Apr 12 22:51:31 2010, Koji, Update, SUS, ITMX installed and aligned IMG_2381.jpg
Entry  Tue Apr 13 20:02:02 2010, Koji, Update, SUS, BS chamber opened, PRM/SRM SOS removed from the table IMG_2384.jpg
Entry  Fri Apr 16 17:46:54 2010, Koji, Update, VAC, Peeting mirrors aligned 
    Reply  Tue Apr 20 19:37:02 2010, Koji, Update, Green Locking, 1W NPRO output profile 
ELOG V3.1.3-