40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 93 of 341  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  2527   Tue Jan 19 03:04:14 2010 KojiUpdateElectronicstriple resonant circuit for EOMSelf-follow:
I got the answer of Q3 from the follow-up
entry.
  
  2528   Tue Jan 19 03:20:28 2010 KojiUpdateElectronicsdesign complete --- triple resonant circuit for EOM ---First I was confused, but now I think I
understood.
My confusion: 
  
  2535   Thu Jan 21 10:09:27 2010 KojiSummaryIOOPhotos of the optical tablesI made a wiki page dedicated for the photos
of the optical tables.
The current layouts were uploaded.
  
  2536   Thu Jan 21 10:31:13 2010 KojiUpdateABSLSome preliminary results from measuring PRC's transmissivity for an amplitude modulated beamNice
and interesting plot.
  
  2559   Tue Feb 2 13:14:09 2010 KojiHowToIOOAnatomy of New Focus Resonant EOMJoe let me use the resonant EOM for GigE
phase camera for a while.
Then, I immediately started to open
  
  2564   Wed Feb 3 01:17:19 2010 KojiUpdatePSLIFO isn't playing nice tonightI checked the situation from my home
and the problem was solved. 
  
  2587   Wed Feb 10 23:15:37 2010 KojiUpdateElectronicstriple resonant EOM ---- preliminary resultHey, this looks nice, but can you provide
us the comparison of rad/V with the resonant
EOM of New Focus?
  
  2588   Wed Feb 10 23:44:56 2010 KojiSummaryCOCPhase Map AnalysisIn the middle of the last month, Kiwamu
and I went to Garilynn's lab to measure the
phase maps of the new ITMs and SRMs.
 SRM01_HR_RoC_rad_15mm.pngSRM01_HR_RoC_scan.png 
  2602   Sat Feb 13 13:21:53 2010 KojiUpdateElectronicstriple resonant EOM --- liniaryity testLooks good. I just thought of the idea
that we also can use Alberto's PLL setup
to sense the modulation with more sensitivity. 
  
  2611   Wed Feb 17 19:36:05 2010 KojiUpdateCOCArm visibilityI
have measured the arm visibilities.
I did not see any change since the
  
  2615   Fri Feb 19 02:38:32 2010 KojiConfigurationoplevsIntsant green oplevs for ITMs shooting from the endsI
set up instant green oplevs for ITMs.
A green laser pointer has been set
  
  2617   Fri Feb 19 13:28:44 2010 KojiUpdateGeneralPrep for Power Supply Stop - ETMX/ETMY oplev paths renewed. The nominal
gain for ETMY YAW was reversed as a steering
mirror has been put.
 screen_shot.png 
  2625   Mon Feb 22 11:42:48 2010 KojiUpdateGeneralPrep for Power Supply Stop Turned on the power supply for the oplev
lasers.
Turned on the power of the aux NPRO.
  
  2630   Tue Feb 23 06:47:57 2010 KojiUpdateGeneralIFO situations / low power MC lockWork on 22nd Monday:
[MC
recovery]
- Tried to lock MC
after the computer recovery by Joe.
 MC_incident.pngMC_REFL.png 
  2637   Wed Feb 24 12:08:31 2010 KojiUpdateComputersRFM goes red -> recovered by the nuclear optionMost of the RFM went red this morning.
I took the nuclear option and it seemed to
be recovered.
  
  2639   Thu Feb 25 11:21:06 2010 KojiUpdateGeneralTanks opened[Steve, Bob, Joe, Zach, Alberto, Kiwamu,
Koji]
We opened the OMC-IMC access connector,
  
  2641   Thu Feb 25 19:59:50 2010 KojiConfigurationSUSITMX OSEMsKoji, Steve
ITMX OSEM CONFIGURATION
 
 osem_config_ITMX.png 
  2643   Fri Feb 26 11:48:36 2010 KojiUpdateGeneralMC incident beam shiftLast night I worked on the MC incident
beam such that we can hit the center of the
MC mirrors.
  
  2651   Tue Mar 2 23:11:43 2010 KojiUpdateSUSITMX hungJenne and Koji
We successfully hung ITMX on the
SOS. Side magnet is ~2mm off from the center
  
  2664   Tue Mar 9 09:32:31 2010 KojiSummaryGeneralWideband measurement of Fast PZT responseI have measured a wideband response
of the fast PZT in the LWE NPRO 700mW in
the Alberto's setup.
 PZT_response.png 
  2668   Thu Mar 11 17:51:04 2010 KojiUpdateSUSRecent status of SOSsJenne, Koji
Recent status of SOSs:
  
  2679   Thu Mar 18 10:46:51 2010 KojiUpdateABSLPLL reconstructedLast night (Mar 17) I checked the PLL
setup as Mott have had some difficulty to
get a clean lock of the PLL setting.
  
  2681   Thu Mar 18 13:40:35 2010 KojiUpdateABSLPLL reconstructedWe use the current PLL just now, but the
renewal of the components are not immediate
as it will take some time. Even so we need
  
  2683   Thu Mar 18 19:00:04 2010 KojiSummaryElectronicsadvantege of our triple resonant EOMDid you find what is the merit of their
impedance matching technique?

  
  2684   Thu Mar 18 21:42:26 2010 KojiUpdateABSLPLL reconstructedI checked the setup further more.

    I replaced the PD from
NewFocus 1GHz one to Thorlabs PDA255.
  
  2691   Sun Mar 21 21:02:39 2010 KojiUpdatePSLEOM waist sizeYou don't need a lengthy code for this. It
is obvious that the spot size at the distance
L is minimum when L =
  
  2693   Mon Mar 22 10:07:30 2010 KojiSummaryElectronicsUPDH Box #17: ReadyFor your reference: Voltage noise of LM7815/LM7915
(with no load)
 15V_power_supply.pdf 
  2698   Tue Mar 23 00:31:51 2010 KojiUpdateIOOMC realignedThis is the first touch to the MC mirrors
after the earthquake on 16th.

    I made an aluminum access
 IMG_2346.jpgIMG_2347.jpg 
  2700   Tue Mar 23 09:55:20 2010 KojiUpdateIOOvac envelope has to be sealed as antproof for overnightRoger.

  
  2705   Wed Mar 24 02:06:24 2010 KojiUpdateIOOvac envelope has to be sealed as antproof for overnightMatt and Koji:
We closed the light doors of the
chambers.
  
  2717   Sat Mar 27 16:23:10 2010 KojiUpdateSUSanother SRM sidemagnet gluedKiwamu and Koji
Last night we have released PRM from
the gluing fixture. All of the six magnets
  
  2726   Mon Mar 29 02:07:50 2010 KojiSummaryPSLFSS Work from Sunday: Open Loop Gain


   
        
            
  
  2730   Mon Mar 29 18:41:34 2010 KojiConfigurationSUSStarted to build TTsSteve and Koji
WE started to build 5 TTs. 4 of them
are used in the recycling cavities. One is
 IMG_2348.jpg 
  2731   Mon Mar 29 18:50:14 2010 KojiUpdateSUSPRM sidemagnet gluedPRM was released from the fixuture without
any trouble. This was the last magnet gluing
until ETMs are delivered.
 StatusTable.png 
  2736   Tue Mar 30 22:13:49 2010 KojiSummaryGreen Lockingconversion efficiency of PPKTPQuestion:
Why does the small spot size for
the case (A) have small efficiency as the
  
  2747   Thu Apr 1 07:17:15 2010 KojiUpdateGeneralPZT response for the innolightThe shape of the TF looks nice but the
calibration must be wrong.
Suppose 1/f slope with 10^-4 rad/V
  
  2749   Thu Apr 1 10:47:48 2010 KojiUpdateGeneralPZT response for the innolightInnolight: 100rad/V @ 100kHz  =>
1e7/f rad/V => 10MHz/V
LWE: 500rad/V @ 100kHz => 
  
  2753   Thu Apr 1 17:35:24 2010 KojiUpdateSUSWorking on ITMX/YSteve and Koji
- We removed old ITMX/Y from the
chambers. Now they are temporarily placed
 IMG_2353.jpg 
  2755   Thu Apr 1 18:44:40 2010 KojiUpdateGeneralPZT response for the innolightInnolight 10 rad/V @ 100kHz => 1e6/f
rad/V => 1MHz/V
LWE 30 rad/V @ 100kHz => 3e6/f
  
  2766   Mon Apr 5 09:48:57 2010 KojiUpdateSUSITMs placed on the tables in the chambersSteve and Koji (Friday, Apr 02)
Summary
Intsallation of ITMs are going on.
  
  2771   Mon Apr 5 13:20:16 2010 KojiOmnistructureElectronicssoldering iron brokenAlbeto and Koji
We took the tip replacement from
the blue tower.
 weller_tips.jpg 
  2777   Tue Apr 6 22:54:34 2010 KojiUpdateSUSITMY (south) alignedKiwamu and Koji
ITMY
(south) was aligned
 IMG_2362.jpg 
  2780   Wed Apr 7 10:58:15 2010 KojiUpdateElectronicsREFL11 Noise SimulationWhat??? I don't see any gray trace
of Rs in the plot. What are you talking about?
Anyway, if you are true, the circuit
  
  2784   Thu Apr 8 20:53:13 2010 KojiUpdate40m UpgradingREFL11 Noise Vs PhotocurrentSomething must be wrong. 
1. Physical Unit is wrong for the
second term of "Vn = Vdn + Sqrt(2 e
  
  2787   Sun Apr 11 19:05:34 2010 KojiOmnistructureComputersWhere are the laptops?One dell is in the clean room for the suspension
work.

  
  2795   Mon Apr 12 22:44:30 2010 KojiUpdate40m UpgradingREFL11 Noise Vs PhotocurrentData looks perfect ... but the fitting
was wrong.
Vn = Vdn + Z * sqrt( 2 e Idc )
  
  2796   Mon Apr 12 22:51:31 2010 KojiUpdateSUSITMX installed and alignedKoji
ITMX
was aligned
 IMG_2381.jpg 
  2800   Tue Apr 13 20:02:02 2010 KojiUpdateSUSBS chamber opened, PRM/SRM SOS removed from the tableBob, Steve, and Koji
We
opened North heavy door of the BS chamber
 IMG_2384.jpg 
  2803   Fri Apr 16 17:46:54 2010 KojiUpdateVACPeeting mirrors alignedSteve and Koji
We aligned the peeping mirrors to
look at the surface of the ITMs. 
  
  2821   Tue Apr 20 19:37:02 2010 KojiUpdateGreen Locking1W NPRO output profileBeautiful fitting.

  
ELOG V3.1.3-