ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
16225
|
Fri Jun 25 14:06:10 2021 |
Jon | Update | CDS | Front-End Assembly and Testing | Summary
Here is the final
summary (from me) of where things stand with
the new front-end systems. With Anchal and |
|
17058
|
Thu Aug 4 19:01:59 2022 |
Tega | Update | Computers | Front-end machine in supermicro boxes | Koji and JC looked around the lab today
and found some supermicro boxes which I was
told to look into to see if they have any |
   |
17066
|
Mon Aug 8 17:16:51 2022 |
Tega | Update | Computers | Front-end machine setup | Added 3 FE machines - c1ioo, c1lsc, c1sus
- to the teststand following the instructions
in elog15947. |
|
15872
|
Fri Mar 5 17:48:25 2021 |
Jon | Update | CDS | Front-end testing | Today I moved the c1bhd machine from the
control room to a new test area set up behind
(west of) the 1X6 rack. The test stand is |
  |
15890
|
Tue Mar 9 16:52:47 2021 |
Jon | Update | CDS | Front-end testing | Today I continued with assembly and testing
of the new front-ends. The main progress
is that the IO chassis is now communicating |
|
15924
|
Tue Mar 16 16:27:22 2021 |
Jon | Update | CDS | Front-end testing | Some progress today towards setting up
an isolated subnet for testing the new front-ends.
I was able to recover the fb1 backup disk |
|
15925
|
Tue Mar 16 19:04:20 2021 |
gautam | Update | CDS | Front-end testing | Now that I think about it, I may only have
backed up the root file system of chiara,
and not |
|
15947
|
Fri Mar 19 18:14:56 2021 |
Jon | Update | CDS | Front-end testing | Summary
Today I finished setting
up the subnet for new FE testing. There
are clones of both fb1 and chiara running |
 |
15959
|
Wed Mar 24 19:02:21 2021 |
Jon | Update | CDS | Front-end testing | This evening I prepared a new 2 TB 3.5"
disk to hold a copy of /opt/rtcds and /opt/rtapps
from chiara. This is the final piece of setup |
|
15976
|
Mon Mar 29 17:55:50 2021 |
Jon | Update | CDS | Front-end testing | Cloning of chiara:/home/cvs underway
I
returned today with a beefier USB-SATA adapter,
which has an integrated 12 V supply |
|
15979
|
Tue Mar 30 18:21:34 2021 |
Jon | Update | CDS | Front-end testing | Progress today:
Outside Internet access for FE
test stand
This morning Jordan |
|
2772
|
Mon Apr 5 13:52:45 2010 |
Alberto | Update | Computers | Front-ends down. Rebooted | This morning, at about 12 Koji found all
the front-ends down.
At 1:45pm rebooted ISCEX, ISCEY, |
|
2376
|
Thu Dec 10 08:40:12 2009 |
Alberto | Update | Computers | Fronte-ends down | I found all the front-ends, except for
C1SUSVME1 and C0DCU1 down this morning. DAQAWG
shows up green on the C0DAQ_DETAIL screen |
|
2378
|
Thu Dec 10 08:50:33 2009 |
Alberto | Update | Computers | Fronte-ends down |
|
|
2382
|
Thu Dec 10 10:01:16 2009 |
Jenne | Update | Computers | Fronte-ends down | All the front ends are back up.
|
|
2383
|
Thu Dec 10 10:31:18 2009 |
Jenne | Update | Computers | Fronte-ends down |
|
|
16336
|
Thu Sep 16 01:16:48 2021 |
Koji | Update | General | Frozen 2 | It happened again. Defrosting required. |
|
10756
|
Thu Dec 4 23:45:30 2014 |
Jenne | Update | CDS | Frozen? | [Jenne, Q, Diego]
I don't know why, but everything
in EPICS-land froze for a few minutes just |
|
3782
|
Tue Oct 26 01:53:21 2010 |
Joonho Lee | Update | Electronics | Fuction Generator removed. | Today
I worked on how to measure cable impedance
directly. |
|
8908
|
Tue Jul 23 16:39:31 2013 |
Koji | Update | General | Full IFO alignment recovered | [Annnalisa Koji]
Full alignment of the IFO was recovered.
The arms were locked with the green beams |
|
8912
|
Tue Jul 23 20:41:40 2013 |
gautam | Configuration | endtable upgrade | Full range calibration and installation of PZT-mounted mirrors | Given
that the green beam is to be used as the |
    |
8967
|
Mon Aug 5 18:48:44 2013 |
gautam | Configuration | endtable upgrade | Full range calibration of PZT mounted mirrors for Y-endtable | I
had prepared two more PZT mounted mirrors
for the Y-end some time back. These are: |
   |
2279
|
Tue Nov 17 10:09:57 2009 |
josephb | Update | Environment | Fumes | The smell of diesel is particularly bad
this morning. Its concentrated enough
to be causing me a headache. I'm heading |
|
6191
|
Thu Jan 12 11:08:23 2012 |
Leo Singer | Update | PEM | Funky spectrum from STS-2 | I am trying to stitch together spectra
from seismometers and accelerometers to produce
a ground motion spectrum from Hz to 100's |
|
932
|
Fri Sep 5 09:56:14 2008 |
josephb, Eric | Configuration | Computers | Funny channels, reboots, and ethernet connections | 1) Apparently the I00-ICS type channels had
gotten into a funny state last night, where
they were showing just noise, exactly when |
|
687
|
Thu Jul 17 00:59:18 2008 |
Jenne | Summary | General | Funny signal coming out of VCO | While working on calibrating the MC_F signal,
Rana and I noticed a funny signal coming
out of the VCO. We expect the output to |
 |
9583
|
Tue Jan 28 22:24:46 2014 |
ericq | Update | General | Further Alignment | [Masasa, ericq]
Having no luck doing things remotely,
we went into the ITMX chamber and roughly |
|
12107
|
Thu May 5 14:03:52 2016 |
ericq | Update | LSC | Further Aux X PDH tweaks | This morning I poked around with the green
layout a bit. I found that the iris immediately
preceding the viewport was clipping the ingoing |
|
4581
|
Thu Apr 28 12:25:11 2011 |
josephb | Update | CDS | Further adventures in Hyper-threading | First, I disabled front end starts on boot
up, and brought c1sus up. I rebuilt
the models for the c1sus computer so they |
|
13741
|
Mon Apr 9 18:46:03 2018 |
gautam | Update | IOO | Further debugging |
I analyzed the data from the free
swinging MC test conducted over the weekend. |
 |
13744
|
Tue Apr 10 14:28:44 2018 |
gautam | Update | IOO | Further debugging | I am working on IMC electronics. |
|
2654
|
Thu Mar 4 02:25:14 2010 |
Jenne | Update | COC | Further details on the magnet story, and SRM guiderod glued | [Koji, Jenne]
First, the easy story: |
|
12507
|
Mon Sep 19 22:03:10 2016 |
ericq | Update | General | Further recovery progress | [ericq, Lydia, Teng]
Brief summary of this afternoon's
activities: |
|
12508
|
Tue Sep 20 10:45:06 2016 |
rana | Update | General | Further recovery progress | Rana suspicious. We had arms locked before
pumpdown with beams on Transmon PDs. If they're
off now, must be beams are far off on the |
|
12510
|
Wed Sep 21 01:08:02 2016 |
ericq | Update | General | Further recovery progress | The misalignment wasn't as bad as I
had intially feared; the spot was indeed
pretty high on ETMX at first. Both transmon |
|
11414
|
Tue Jul 14 17:14:23 2015 |
Eve | Summary | Summary Pages | Future summary pages improvements | Here is a list of suggested improvements
to the summary pages. Let me know if there's
something you'd like for me to add to |
|
11437
|
Wed Jul 22 22:06:42 2015 |
Eve | Summary | Summary Pages | Future summary pages improvements | - CDS Tab
We want to monitor the status of the |
|
8045
|
Fri Feb 8 21:14:52 2013 |
Manasa | Update | Optics | G&H - AR Reflectivity | Hours of struggle and still no
data |
 |
8046
|
Fri Feb 8 22:49:31 2013 |
Koji | Update | Optics | G&H - AR Reflectivity | How about to measure the AR reflectivity
at larger (but small) angles the extrapolate
the function to smaller angle, |
|
8047
|
Fri Feb 8 23:04:40 2013 |
Manasa | Update | Optics | G&H - AR Reflectivity |
|
|
8051
|
Sat Feb 9 19:34:34 2013 |
rana | Update | Optics | G&H - AR Reflectivity |
Use the trick I suggested:
Focus the beam so that the beam size |
|
8063
|
Mon Feb 11 19:55:47 2013 |
Manasa | Update | Optics | G&H - AR Reflectivity |
I adjusted the focal length of the
focusing lens and reduced the beam size enough |
|
8075
|
Wed Feb 13 09:28:56 2013 |
Steve | Update | Optics | G&H - HR plots |
Gooch & Housego optics
order specification from 03-13-2010 |
|
8018
|
Wed Feb 6 20:19:52 2013 |
Manasa | Update | Optics | G&H and LaserOptik mirrors | [Koji, Manasa]
We measured the wedge angle of the
G&H and LaserOptik mirrors at the OMC |
|
12102
|
Mon May 2 17:06:58 2016 |
rana | Summary | COC | G&H optics to Fullerton/HWS for anneal testing | Steve sent 4 of our 1" diameter G&H
HR mirrors to Josh Smith at Fullerton for
scatter testing. Attached photo is our total |
|
530
|
Wed Jun 11 15:30:55 2008 |
josephb | Configuration | Cameras | GC1280 | The trial use GC1280 has arrived. This is
a higher resolution CMOS camera (similar
to the GC750). Other than higher resolution, |
 |
649
|
Tue Jul 8 21:46:38 2008 |
Yoichi | Configuration | PSL | GC650M moved to the PMC transmission | I moved a GC650M, which was monitoring the
light coming out of the PSL, to the transmission
port of the PMC to see the transmitted mode |
|
521
|
Thu Jun 5 13:35:23 2008 |
josephb | Configuration | Cameras | GC750 looking at 1064nm scattered light | I've taken 200 images of the GC750 (CMOS)
camera while holding it by hand up to a beam
card (also held by hand) in the path of ~5mW |
    |
378
|
Fri Mar 14 12:06:29 2008 |
josephb | Configuration | Cameras | GC750 looking at ETMX while locked | The GC750 (CMOS) is currently looking at the
front of ETMX. Unfortunately, its being
routed through a 10Mbit connection (which |
|
558
|
Tue Jun 24 17:12:10 2008 |
josephb, Eric | Configuration | Cameras | GC750 setup, 1X4 Hub connected, ETMX images | The GC750 camera has been setup to look at
ETMX. In addition, the new 1X4 rack mounted
switch (131.215.113.200) has been connected |
  |