40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 8 of 355  Not logged in ELOG logo
Entry  Wed Sep 24 19:13:06 2008, rana, Configuration, Computer Scripts / Programs, updatedb & locate: megatron & rosalba 
Entry  Thu Sep 25 14:03:08 2008, josephb, Configuration, Computers,  
Entry  Thu Sep 25 17:14:31 2008, rana, Configuration, General, new sitemap vegemite.png
Entry  Fri Sep 26 14:10:21 2008, Yoichi, Configuration, Computers, Lab laptops maintenance 
Entry  Fri Sep 26 19:08:43 2008, rana, Configuration, PSL, Refcav Trans: PD + Camera + Dumps 
Entry  Mon Sep 29 13:33:39 2008, josephb, Configuration, Computers, Gigabit network finished and conlog available on Nodus 
Entry  Wed Oct 1 12:05:58 2008, Alberto, Configuration, Computers, "StochMon" added to the Alarm Handler 
    Reply  Wed Oct 1 12:09:25 2008, Alberto, Configuration, Computers, "StochMon" added to the Alarm Handler 
Entry  Wed Oct 1 23:21:03 2008, Yoichi, Configuration, PSL, Reference cavity reflection camera 
Entry  Fri Oct 3 12:15:21 2008, Alberto, Configuration, IOO, C1iool0 rebooted 
Entry  Tue Oct 7 12:17:57 2008, Alberto, Configuration, Computers, Time reset on MEDM 
Entry  Wed Oct 8 12:35:56 2008, josephb, Configuration, Computers, New Network diagram for the 40m 40m_network_10-07-08.pdf
Entry  Wed Oct 8 19:17:55 2008, Yoichi, Configuration, PSL, Laser power is slowly recovering 
Entry  Wed Oct 8 22:23:43 2008, Yoichi, Configuration, Electronics, Electronics work bench cleanup Cleanup.jpg
Entry  Fri Oct 10 20:03:35 2008, Yoichi, Configuration, Computers, medm, dataviewer, dtt on 64 bit linux 
Entry  Mon Oct 13 13:51:49 2008, pete, Configuration, PSL, attempt to measure FSS ref phase 
Entry  Tue Oct 14 14:19:36 2008, pete, Configuration, PSL, FSS ref phase 
Entry  Tue Oct 14 19:24:34 2008, Yoichi, Configuration, PSL, FSS light power reduced 
Entry  Wed Oct 15 22:07:52 2008, pete, Configuration, PSL, FSS ref phase measurements phasedelay.png
    Reply  Thu Oct 16 09:47:49 2008, Yoichi, Configuration, PSL, FSS ref phase measurements 
Entry  Thu Oct 16 13:12:58 2008, pete, Configuration, PSL, phase between FSS reference outputs 
Entry  Thu Oct 16 16:26:26 2008, pete, Configuration, PSL, FSS phase matching cable installed 
Entry  Fri Oct 17 16:43:10 2008, Yoichi, Configuration, Computers, mcup/down scripts on linux 
Entry  Mon Oct 20 15:02:00 2008, Yoichi, Configuration, Computers, /cvs/cds restored 
    Reply  Mon Oct 20 16:18:00 2008, Alan, Configuration, Computers, /cvs/cds restored 
Entry  Mon Oct 20 20:50:09 2008, Yoichi, Configuration, PSL, FSS board chip replacement 
Entry  Tue Oct 21 18:19:42 2008, Yoichi, Configuration, Computers, LISO and Eagle installed FSS_PC_Path.pdfAD829Stability.pngAD797Stability.pngFreqNoiseByAD829.png
Entry  Thu Oct 23 20:47:28 2008, pete, Configuration, PSL, FSS LO calibration for MEDM fss_lo_calibration.png
Entry  Fri Oct 24 10:06:16 2008, Yoichi, Configuration, IOO, MC gain and FSS gain changed 
Entry  Fri Oct 24 11:21:26 2008, pete, Configuration, PSL, FSS LO input calibrated in dBm 
Entry  Fri Oct 24 20:54:41 2008, rana, Configuration, Computers, linux2 
Entry  Fri Oct 24 21:49:15 2008, Jenne, Configuration, PEM, Short Seismometer Cable 
Entry  Mon Oct 27 11:16:23 2008, Alberto, Configuration, IOO, StochMon Calibration 
Entry  Mon Oct 27 14:48:27 2008, Yoichi, Configuration, PSL, EO shutter installed to the reference cavity 
    Reply  Tue Oct 28 12:01:01 2008, josephb, Configuration, Computers, linux2 
Entry  Wed Oct 29 12:23:04 2008, Yoichi, Configuration, PSL, MZ alignment touched and the alarm level changed 
Entry  Thu Oct 30 20:39:47 2008, caryn, Configuration, PEM, temperature sensor  
Entry  Sun Nov 2 20:21:58 2008, rana, Configuration, lore, HP 5550dtn (Grazia) set up on allegra 
Entry  Mon Nov 3 19:18:47 2008, Alberto, Configuration, General, new elog 
    Reply  Mon Nov 3 21:38:32 2008, Yoichi, Configuration, General, new elog 
    Reply  Thu Nov 6 22:07:56 2008, rana, Configuration, Computers, ELOG compile on Solaris 
Entry  Thu Nov 13 15:50:44 2008, Alberto, Configuration, General, GPS 10MHz clock rackstuff.pdf
Entry  Wed Nov 19 10:32:11 2008, Alberto, Configuration, Electronics, All the Marconi Set to the Rubidium Frequency Standard 
    Reply  Wed Nov 19 18:02:18 2008, rana, Configuration, Electronics, All the Marconi Set to the Rubidium Frequency Standard 
    Reply  Wed Nov 19 18:12:35 2008, rana, Configuration, IOO, new channel for MC drum modes 
Entry  Sat Nov 22 10:55:51 2008, Caryn, Configuration, IOO, Drum modes Lock-In settings changed 
Entry  Mon Nov 24 16:43:34 2008, rana, Configuration, Computers, Alex and Jay took away some computers from the racks 
Entry  Mon Nov 24 19:15:16 2008, rana, alberto, john, Configuration, Environment, temperature 
    Reply  Tue Nov 25 19:29:15 2008, rana, alberto, john, Configuration, Environment, temperature 
    Reply  Thu Nov 27 22:56:42 2008, rana, Configuration, Environment, temperature mc.png
ELOG V3.1.3-