40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 8 of 348  Not logged in ELOG logo
    Reply  Mon Jan 23 22:51:17 2023, yuta, Summary, BHD, 60 Hz harmonics side lobe investigations Screenshot_2023-01-24_11-43-40_POXPOYDark.png
    Reply  Tue Jan 24 21:29:31 2023, yuta, Summary, BHD, Electronics diagram around BH44 and BH55 BH44BH55Diagram.pdf
    Reply  Wed Jan 25 11:35:20 2023, yuta, Summary, BHD, REFL55 visually inspected, BH44 Kapton taped REFL55.JPGBH44Kapton.JPG20230125_FPMIBHDPDs_Spectra_FPMILockedBH55Locked.pdf20230125_FPMIBHDPDs_Spectra_FPMILockedBH55LockedNoWhitening.pdf20230125_FPMIBHDPDs_Spectra_FPMILockedBH55LockedResG60InCARM.pdf
    Reply  Wed Jan 25 18:01:21 2023, yuta, Summary, BHD, BH44 setup isolated, but 60 Hz noise stays the same BH44BH55Diagram_Disconnected.pdf20230125_FPMIBHDPDs_Spectra_BothArmsLocked.pdf20230125_FPMIBHDPDs_Spectra_BothArmsLockedBH44Removed.pdf20230125_MCF.pdf
    Reply  Thu Jan 26 16:07:05 2023, yuta, Summary, PSL, PMC aligned, now PMC transmission is 0.7 Screenshot_2023-01-26_16-10-20.pngScreenshot_2023-01-26_16-10-35.png
    Reply  Fri Jan 27 19:35:31 2023, yuta, Summary, BHD, 60 Hz noise investigations around IMC 6x
    Reply  Fri Jan 27 21:22:57 2023, yuta, Summary, BHD, V beam dump installed for BH44 RF PD V.JPG
    Reply  Fri Feb 3 17:39:38 2023, yuta, Summary, BHD, 60 Hz noise investigations around IMC, part 2 Screenshot_2023-02-03_12-34-10_IMC60HzComb.pngXARM_calibrated_noise_20230203.pdfYARM_calibrated_noise_20230203.pdfMC_F_57Hzline.pdfFPMI_calibrated_noise_20230203.pdf
    Reply  Tue Feb 7 20:10:05 2023, yuta, Summary, BHD, 60 Hz noise investigations around IMC, part 3 IMC_OLTF.png
    Reply  Thu Feb 9 10:05:37 2023, yuta, Update, CDS, c1sus2 all FE models crashed spontaneously again 
    Reply  Thu Feb 9 10:19:22 2023, yuta, Summary, BHD, 60 Hz noise investigations around IMC, part 4, using ALS BEAT YARM_calibrated_noise_20230208_Hz.pdfBEATX_BEATY_MCF.pdf
    Reply  Thu Feb 9 17:33:34 2023, yuta, Summary, BHD, 60 Hz noise investigations around IMC, part 6, TTFSS NPROandSmallBox.JPGTerminatingSummingBox.JPGEOMSmallBox.JPG
    Reply  Mon Feb 13 11:54:54 2023, yuta, Summary, BHD, 60 Hz frequency noise is coming from MC1 coils YARM_calibrated_noise_20230213_Hz.pdfScreenshot_2023-02-13_12-23-23_TrippingMC1.png
    Reply  Tue Feb 14 10:49:04 2023, yuta, Summary, BHD, MC1 electronics diagram and cable diconnection tests 
Entry  Thu Feb 16 14:44:06 2023, yuta, Update, BHD, FPMI BHD with BH55 recovered FPMI_calibrated_noise_20230216.pdfFPMI_calibrated_noise_20230216_60Hz.pdf
    Reply  Wed Feb 22 17:32:16 2023, yuta, Update, BHD, BH55 and BH44 both amplified BH55BH44.JPGSorensen.JPGScreenshot_2023-02-22_17-35-27_BH55BH44.png
    Reply  Thu Feb 23 14:55:49 2023, yuta, Update, BHD, BH55 and BH44 orthogonality checks LSC-BH44_Q_ERR_DQ_20230223.pdf
    Reply  Mon Mar 13 19:53:36 2023, yuta, Update, BHD, FPMI BHD sensing matrix measurement with individual lines 
    Reply  Tue Mar 14 18:44:39 2023, yuta, Update, BHD, LO phase noise measurements in ITMX single bounce, MICH and FPMI BH555_BH44_LO_PHase_Control_Comparison.pdf
Entry  Fri Sep 21 09:59:09 2018, yuki, Configuration, ASC, Y end table upgrade plan Pic_CurrentSetup_AUXYgreen.jpegModeMatchingSolution_Current.pdfModeMatchingSolution_Current_Magnified.pdfModeMatchingSolution_Optimized.pdfModeMatchingSolution_Optimized_Magnified.pdf
Entry  Sun Sep 23 17:38:48 2018, yuki, Update, ASC, Alignment of AUX Y end green beam was recovered 
    Reply  Sun Sep 23 19:32:23 2018, yuki, Configuration, ASC, Y end table upgrade plan Pic_NewSetup0923_AUXYgreen.jpegModeMatchingSolution_Result.pdfModeMatchingSolution_Magnified_0923.jpgpic0923_1.jpgpic0923_2.jpg
    Reply  Mon Sep 24 11:09:05 2018, yuki, Configuration, ASC, Y end table upgrade plan pic0924_1.jpg
    Reply  Tue Sep 25 18:08:50 2018, yuki, Configuration, ASC, Y end table upgrade plan 
    Reply  Thu Sep 27 14:02:55 2018, yuki, Configuration, ASC, PZT driver board verification PZTdriverSimulationDiagram.pdfPZTdriverSimulationResult.pdfPZTdriverPerformanceCheck_ResultOUT.pdfPZTdriverPerformanceCheck_ResultMON.pdfPZTdriver.asc
    Reply  Sun Sep 30 20:14:51 2018, yuki, Configuration, ASC, QPD calibration QPDcalibrationXaxis.pdfQPDcalibrationYaxis.pdf
    Reply  Mon Oct 1 13:33:55 2018, yuki, Configuration, ASC, QPD calibration Pic_QPDcalibration.jpg
    Reply  Tue Oct 2 18:50:53 2018, yuki, Configuration, ASC, PZT mirror calibration PZTM1calibrationCH2.pdfPZTM1calibrationCH1.pdfPZTM2calibrationCH2.pdfPZTM2calibrationCH1.pdf
    Reply  Wed Oct 3 14:24:40 2018, yuki, Configuration, ASC, Y end table upgrade plan 
    Reply  Wed Oct 3 18:15:34 2018, yuki, Configuration, ASC, AI board improvement TF_AIboard.pdf
    Reply  Thu Oct 4 00:44:50 2018, yuki, Configuration, ASC, AI board improvement 
    Reply  Thu Oct 4 22:15:30 2018, yuki, Configuration, ASC, Y-end table upgrade AUXYGreenLock20180921.jpgPic_FormerSetup.jpegPic_CurrentSetup1004.jpg
    Reply  Fri Oct 5 17:32:38 2018, yuki, Configuration, ASC, Y-end table upgrade 
    Reply  Fri Oct 5 22:49:22 2018, yuki, Configuration, ASC, Y-end table upgrade 
    Reply  Sun Oct 7 22:30:42 2018, yuki, Configuration, LSC, Yarm Green locking was recovered Pic_NewLayout1007.jpgYendGreenModeMatching.zip
    Reply  Mon Oct 8 00:46:35 2018, yuki, Configuration, ASC, Y-end table upgrade 
    Reply  Tue Oct 9 23:03:43 2018, yuki, Configuration, LSC, Yarm Green locking was recovered Pic_1Y4.jpgPic_PZTcable.jpg
    Reply  Wed Oct 10 12:38:27 2018, yuki, Configuration, LSC, All hardware was installed 
    Reply  Thu Oct 11 13:40:51 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Fri Oct 12 12:29:34 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Fri Oct 12 20:20:29 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Sat Oct 13 20:11:10 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Mon Oct 15 10:32:13 2018, yuki, Update, Computer Scripts / Programs, loss measurements XARM_20181015_1500.pdfYARM_20181015_1500.pdf
    Reply  Mon Oct 15 12:52:54 2018, yuki, Update, Computer Scripts / Programs, additional comments 
    Reply  Mon Oct 15 20:11:56 2018, yuki, Configuration, ASC, Y end table upgrade plan 
    Reply  Tue Oct 16 00:44:29 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Wed Oct 17 20:46:24 2018, yuki, Configuration, ASC, Y end table upgrade plan 
    Reply  Wed Nov 7 05:16:16 2018, yuki, Update, Computer Scripts / Programs, arm loss measuremenents 
Entry  Mon Feb 13 17:19:41 2017, yinzi, Configuration, , configuring ethernet for raspberry pi Screen_Shot_2017-02-13_at_5.11.52_PM.png
Entry  Fri Aug 2 17:07:33 2019, yehonathan, gautam, Update, Loss Measurement,  
ELOG V3.1.3-