40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 88 of 354  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  1714   Thu Jul 2 06:31:35 2009 ClaraUpdatePEMFirst mic in place and connectedI clamped Bonnie (microphone) to the top
of a chamber near the vertex of the arms
and placed Clyde (pre-amp) on the table right
 bonnieandclyde.JPG 
  8874   Thu Jul 18 20:20:52 2013 gautamConfigurationendtable upgradeFirst mirror glued to PZT and mounted in modified mounts 
 Yesterday,
I mounted the first PZT in one of the modified
 Piezo-mirror.jpg 
  11979   Fri Feb 5 16:50:24 2016 gautamUpdateGreen LockingFirst pass at mode-matchingI've done a first pass at trying to
arrive at a mode-matching solution for the
X-end table once we swtich the lasers out.
 Modematch_AUXx.pdfNewSetUp.pngModematch_AUXx_2.pdfXendModeMatch.m.zip 
  3593   Tue Sep 21 16:05:21 2010 josephbUpdateCDSFirst pass at rack diagramI've made a first pass at a rack diagram
for the 1X1 and 1X2 racks, attached as png.
Gray is old existing boards, power
 1X1_1X2_racks.png 
  5157   Tue Aug 9 16:21:59 2011 Manuel, IshwitaUpdateWienerFilteringFirst results of our simulationsWe did the simulation of the stacks by
defining a transfer function for one stack
 (green
 simu1.pngsimu2w.pngTFwhitened2.png 
  2941   Mon May 17 19:42:11 2010 JenneUpdateIOOFirst steps toward MC mode measuring[Jenne, Kevin, Steve]
We made some progress toward getting
the MC's beam profile measured.  In
  
  2942   Tue May 18 01:40:56 2010 KojiUpdateIOOFirst steps toward MC mode measuringOK. Don't worry. This is just an initial
confusion which we also had for the suspensions
a while ago.
  
  2945   Tue May 18 12:04:13 2010 robUpdateIOOFirst steps toward MC mode measuring


   
        
            
  
  2949   Tue May 18 16:44:35 2010 KojiUpdateIOOFirst steps toward MC mode measuringHere is the upadted list http://lhocds.ligo-wa.caltech.edu:8000/40m/Upgrade_09/Optics

  
  15926   Tue Mar 16 19:13:09 2021 Paco, AnchalUpdateSUSFirst success in Input Matric DiagonalizationAfter jumping through few hoops, we have
one successful result in diagonalizing the
input matrix for MC1, MC2 and MC3.
 IMC_InputMatrixDiagonalization.pdfInMatCalcScripts.zip 
  10959   Fri Jan 30 02:57:03 2015 JenneUpdateModern ControlFirst try with PRCL ASC Wiener filtering[Aside - How do you rotate plots in the
new elog?  It's showing them correctly
in the attachments list below the entry,
 9x 
  6882   Wed Jun 27 14:18:30 2012 Yaakov SummarySTACISFirst week summaryThe beginning of my first week was spent
at various orientations and safety meetings,
some for general SURF and some more specific
  
  16373   Mon Oct 4 15:50:31 2021 HangUpdateCalibrationFisher matrix estimation on XARM parameters[Anchal, Hang]

What: Anchal and I measured the
XARM OLTF last Thursday.
 tf_meas.pdffisher_est_vs_data.pdfPxx_evol.pdffisher_evol.pdf 
  16486   Mon Nov 29 15:24:53 2021 HangHowToGeneralFisher matrix vs length of each FFT segmentWe have been discussing how does the parameter
estimation depends on the length per FFT
segment. In other words, after we collected
 setup.pdfFisher_vs_Tperseg.pdffisher_vs_mcmc_offset_removed.pngfisher_vs_mcmc.png 
  5015   Thu Jul 21 23:36:51 2011 JennyUpdate Fitting beam waist with MATLABI am starting work on the PSL table at
the 40m. My goal is to lock  the laser coming
from the nearby table to the FP cavity and
 twobeamfit2.jpg 
  512   Tue Jun 3 02:15:29 2008 AndreySummaryCamerasFitting results
There have been a lot of work going on related
to the processing of images captured by the
 May30-GC650.pdfMay30-GC750.pdfJune02-GC650.pdfJune02-GC750.pdf 
  16467   Tue Nov 16 11:37:26 2021 HangHowToSUSFitting suspension model--large systematic errorsOne goal of our sysID study is to improve
the aLIGO L2A feedforward. Our algorithm
currently improves only the statistical uncertainty
 L2L_L3P_fit.pdfL2L_L3P_residual.pdf 
  14439   Thu Feb 7 17:27:53 2019 KojiSummaryTip-TIltFive FiveNine Optics Optics delivered5 PR3/SR3 optics from FiveNine Optics were
delivered. The data sheets were scanned and
uploaded to the following wiki page. https://wiki-40m.ligo.caltech.edu/Aux_Optics
  
  14442   Fri Feb 8 00:20:56 2019 gautamSummaryTip-TIltFive FiveNine Optics Optics deliveredThey have been stored on the 3rd shelf
from top in the clean optics cabinet at the
south end. EX
  
  16274   Tue Aug 10 17:24:26 2021 pacoUpdateGeneralFive day trendAttachment 1 shows a five and a half day
minute-trend of the three temperature sensors.
Logging started last Thursday ~ 2 pm when
 six_day_minute_trend.png 
  16887   Fri Jun 3 12:13:58 2022 PacoConfigurationCDSFix RFM channels [Paco, Yuta]

We tried fixing the issue of LSC_TRY
and LSC_TRX channels not working. We first
 SoGreen.png 
  4868   Thu Jun 23 21:35:46 2011 Jamie, Rana, KiwamuUpdateSUSFix calibration for sus sensorsWe have fixed the counts-to-micron (cts2um)
calibration for the suspension sensor filters.
 Each suspension sensor filter bank (e.g.
  
  8325   Thu Mar 21 12:04:05 2013 ManasaUpdateComputersFixedAll FE computers are back.
Restart procedure:
0a. Restart frame builder:
 up.png 
  8326   Thu Mar 21 12:33:51 2013 ranaUpdateComputersFixedPlease stop power cycling computers. This
is not an acceptable operation (as Jamie
already wrote before). When you don't know
  
  8453   Sun Apr 14 17:30:14 2013 ManasaUpdateLockingFixedTRY path fixed and ready for normalization.

I used 2" BS at R=50 and R=98
  
  8455   Sun Apr 14 23:20:42 2013 DenUpdateLockingFixed

    

       
            
  
  8463   Thu Apr 18 21:12:56 2013 ManasaUpdateLockingFixed[Den, Manasa]

TRY & TRX power measurement was
  
  8055   Mon Feb 11 13:07:17 2013 Max HortonUpdateSummary PagesFixed A Calendar BugUnderstanding the Code:  Documented
more functions in summary_pages.py. 
Since it is very difficult and slow to understand
  
  11480   Wed Aug 5 17:15:08 2015 EveUpdateSummary PagesFixed ASC TabI've fixed the ASC
tab on the summary pages to populate
the graphs with data without causing an error.
  
  5098   Tue Aug 2 23:02:48 2011 NicoleUpdateSUSFixed Accelerometer

 
 shakerposts.jpgnewclips.jpgclipstoamplifier.jpg 
  857   Tue Aug 19 19:14:17 2008 YoichiConfigurationDAQFixed C1:IOO-MC_RFAMPDDCYoichi, Rob

C1:IOO-MC_RFAMPDDC, which is a PD at the
  
  16236   Thu Jul 1 16:55:21 2021 AnchalSummaryOptical LeversFixed Centeringoptical levers PRMThis was a mistake. When arms are locked,
PRM is misaligned by setting -800 offset
in PIT dof of PRM. The oplev is set to function
  
  16938   Wed Jun 22 14:44:03 2022 AnchalUpdateBHDFixed DC error in c1su2, added new library model for suspensionsThe 0x2000 error in c1su2 happens whenever
we make it and install it as the default
data acquisition rates are too much in the
  
  4184   Fri Jan 21 17:59:27 2011 josephb, alexUpdateCDSFixed Dolphin transmissionThe orientation
of the Dolphin cards seems to be opposite
on c1lsc and c1sus.  The wide part is
  
  4518   Wed Apr 13 11:34:07 2011 josephbUpdateCDSFixed IFO_ALIGN.adlProblem:
I switched the
ITMX and ITMY control channels yesterday,
  
  16890   Sun Jun 5 19:46:40 2022 PacoUpdateLSCFixed IMC Trans sum issue[Paco]

Fixed the issue below:

  
  17870   Fri Sep 22 19:31:24 2023 KojiUpdateSUSFixed IMC/IFO alignment screensFixed IMC/IFO alignment screens  Screenshot_2023-09-23_02-28-42.pngScreenshot_2023-09-23_02-28-52.png 
  682   Wed Jul 16 16:28:14 2008 josephbConfigurationComputersFixed IP address on SwitchRealized today that the change I made back
on June 30th to the switch was to the wrong
switch.  I had disabled the DHCP setting
  
  10927   Wed Jan 21 15:27:47 2015 JenneUpdateLSCFixed LSC model bugThis problem with the CARM loop last night
was the fault of a bug that I had put into
the LSC model last week.  When I gave
  
  4308   Wed Feb 16 12:16:14 2011 josephbUpdateCDSFixed Optical level SUM channel names[Joe,Valera]
Valera
pointed out the OPLEV SUM channels were incorrect. 
  
  5178   Wed Aug 10 19:18:26 2011 NicoleSummarySUSFixed Reflective Photosensors; Recalibrated Photosensor 2Thanks to Koji's help, the second photosensor,
which was not working, has been fixed. I
have re-calibrated the photosensor after
 ps2.jpg 
  3642   Mon Oct 4 11:20:45 2010 josephbUpdateCDSFixed Suspension binary output list and sus modelI've updated the CDS wiki page listing
the wiring of the 40m suspensions with the
correct binary output channels.  I previously
  
  4130   Mon Jan 10 16:47:08 2011 josephb, alex, rolfUpdateCDSFixed c1lsc dolphin reflected memoryWhile Alex and Rolf were visiting, I pointed
out that the Dolphin card was not sending
any data, not even a time stamp, from the
  
  4666   Mon May 9 15:21:36 2011 josephbUpdatePSLFixed channel names for PSL QPDs, fixed saturation, changed signs[Valera,
Joe]
Software
  
  4677   Tue May 10 10:06:23 2011 josephbUpdatePSLFixed channel names for PSL QPDs, fixed saturation, changed signsI added calculation entries to the /cvs/cds/caltech/target/c1iool0/c1ioo.db
file which are named C1:IOO-QPD_*_*, as the
channels were originally named.  These
  
  16179   Thu Jun 3 17:35:31 2021 AnchalSummaryIMCFixed medm buttonI fixed the PSL shutter button on Shutters
summary page C1IOO_Mech_Shutter.adl. Now
PSL switch changes C1:PSL-PSL_ShutterRqst
 C1IOO_Mech_Shutters.png 
  4404   Fri Mar 11 11:33:24 2011 josephbUpdateCDSFixed mistake in Matrix of Filter banks naming conventionWhile fixing up some medm screens and getting
spectra of the simulated plant, I realized
that the naming convention for the Matrices
  
  16391   Mon Oct 11 17:31:25 2021 AnchalSummaryCDSFixed mounting of mx devices in fb. daqd_dc is running now.

  
  3008   Fri May 28 13:17:05 2010 josephbUpdateCDSFixed problem with channel access on c1iscexTalked with Alex and tracked down why the
codes were not working on the new c1iscex
finally.  The .bashrc and .cshrc files
  
  16282   Wed Aug 18 20:30:12 2021 AnchalUpdateASSFixed runASS scriptsLate elog:
Original time of work Tue Aug 17 20:30 2021


I locked the arms yesterday
  
ELOG V3.1.3-