40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 88 of 344  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  4885   Sun Jun 26 16:02:12 2011 kiwamuUpdateIOOFriday MC activity[Rana / Kiwamu]
 Last Friday we did several
things for MC :
  
  9641   Sun Feb 16 17:40:11 2014 KojiUpdateLSCFriday Night ALSI wanted to try common/differential ALS
Friday evening. I tried ALS using the LSC
servo but this was not successfull.
  
  7334   Tue Sep 4 11:32:58 2012 JenneUpdateLockingFriday in-vac workElog re: Friday's work
Adjusted PZT2 so we're hitting the
center of PR2. 
  
  4884   Sat Jun 25 06:09:38 2011 kiwamuUpdateLSCFriday lockingI
was able to measure the sensing matrix in
the PRMI configuration.
  
  1909   Sat Aug 15 05:08:55 2009 YoichiUpdateLockingFriday night lockingSummary: DD hand off fails for DRFPMI.

Tonight, I did a lot of house keeping work.
  
  61   Sun Nov 4 23:55:24 2007 ranaUpdateIOOFriday's In-Vac workOn Friday morning when closing up we noticed
that we could not get the MC to flash any
modes.
  
  62   Mon Nov 5 07:29:35 2007 ranaUpdateIOOFriday's In-Vac workLiyuan recently did some of his pencil beam
scatterometer measurements measuring not
the
  
  4203   Tue Jan 25 22:49:13 2011 KojiUpdateCDSFront End multiple crashSTATUS: 

    Rebooted c1lsc and
c1sus. Restarted fb many times.
  
  4206   Wed Jan 26 10:58:48 2011 josephbUpdateCDSFront End multiple crashLooking
at dmesg on c1lsc, it looks like the model
is starting, but then eventually times out
  
  4207   Wed Jan 26 12:03:45 2011 KojiUpdateCDSFront End multiple crashThis is definitely a nice magic to know
as the rebooting causes too much hustles.
Also, you and I should spend an hour
  
  3837   Mon Nov 1 15:35:41 2010 josephbUpdateCDSFront end USR and CPU times now recorded by DAQProblem:
We have no record of how long the
CPUs are taking to perform a cycle's worth
  
  4312   Thu Feb 17 11:49:48 2011 josephbUpdateCDSFront end start/stop scripts go to /scripts/FE againI modified the core/advLigoRTS/Makefile
to once again place the startc1SYS and killc1SYS
scripts in the scripts/FE/ directory.
  
  8858   Tue Jul 16 15:22:27 2013 manasaUpdateCDSFront ends back upc1sus, c1ioo, c1iscex and c1iscey were
down. Why? I was trying to lock the arm and
I found that around this time, several computers
  
  12827   Mon Feb 13 19:44:55 2017 LydiaUpdateIMCFront panel for 29.5 MHz amplifier boxI made a tentative front panel design for
the newly installed amplifier box. I used
this chassis
 rfAmp.pdf 
  12861   Wed Mar 1 21:15:40 2017 LydiaUpdateIMCFront panel for 29.5 MHz amplifier box
I installed the front panel today.
While I had the box out I also replaced
 RF_amp_(1).pdf 
  12862   Wed Mar 1 23:56:09 2017 gautamUpdateIMCFront panel for 29.5 MHz amplifier boxThe
alignment wasn't disturbed for the photo-taking
- I just re-checked that the spot is indeed
  
  12865   Thu Mar 2 20:32:18 2017 LydiaUpdateIMCFront panel for 29.5 MHz amplifier box[gautam, lydia]

I pulled out the box and found
the problem: the +24 V input to the amplifier
  
  16167   Fri May 28 11:16:21 2021 JonUpdateCDSFront-End Assembly and TestingAn update on recent progress in the lab
towards building and testing the new FEs.

1. Timing problems resolved /
 c1bhd.pnggds_tp.pngteststand.jpegbench_supply.jpeg 
  16185   Sun Jun 6 08:42:05 2021 JonUpdateCDSFront-End Assembly and TestingHere is an update and status report on
the new BHD front-ends (FEs).

Timing

The changes
 c1bhd.png16bit_dacs.pngmyricom.png 
  16220   Tue Jun 22 16:53:01 2021 Ian MacMillanUpdateCDSFront-End Assembly and TestingThe channels on both the C1BHD and C1SUS2
seem to be frozen: they arent updating and
are holding one value. To fix this Anchal
  
  16224   Thu Jun 24 17:32:52 2021 Ian MacMillanUpdateCDSFront-End Assembly and TestingAnchal and I ran tests on the two systems
(C1-SUS2 and C1-BHD). Attached are the results
and the code and data to recreate them.
 C1-SU2_Channel_Responses.pdfC1-BHD_Channel_Responses.pdfCDS_Channel_Test.zip 
  16225   Fri Jun 25 14:06:10 2021 JonUpdateCDSFront-End Assembly and TestingSummary

Here is the final
summary (from me) of where things stand with
the new front-end systems. With Anchal and
 test_stand.JPG 
  17058   Thu Aug 4 19:01:59 2022 TegaUpdateComputersFront-end machine in supermicro boxesKoji and JC looked around the lab today
and found some supermicro boxes which I was
told to look into to see if they have any
 IMG_20220804_184444473.jpgIMG_20220804_191658206.jpgIMG_20220804_185336240.jpgIMG_20220804_185023002.jpg 
  17066   Mon Aug 8 17:16:51 2022 TegaUpdateComputersFront-end machine setupAdded 3 FE machines - c1ioo, c1lsc, c1sus
-  to the teststand following the instructions
in elog15947.
 IMG_20220808_170349717.jpg 
  15872   Fri Mar 5 17:48:25 2021 JonUpdateCDSFront-end testingToday I moved the c1bhd machine from the
control room to a new test area set up behind
(west of) the 1X6 rack. The test stand is
 image_67203585.JPGimage_67216641.JPGimage_17185537.JPG 
  15890   Tue Mar 9 16:52:47 2021 JonUpdateCDSFront-end testingToday I continued with assembly and testing
of the new front-ends. The main progress
is that the IO chassis is now communicating
 image_72192707.JPG 
  15924   Tue Mar 16 16:27:22 2021 JonUpdateCDSFront-end testingSome progress today towards setting up
an isolated subnet for testing the new front-ends.
I was able to recover the fb1 backup disk
  
  15925   Tue Mar 16 19:04:20 2021 gautamUpdateCDSFront-end testingNow that I think about it, I may only have
backed up the root file system of chiara,
and not
  
  15947   Fri Mar 19 18:14:56 2021 JonUpdateCDSFront-end testingSummary

Today I finished setting
up the subnet for new FE testing. There
are clones of both fb1 and chiara running
 image_72192707_(1).JPGimage_50412545.JPG 
  15959   Wed Mar 24 19:02:21 2021 JonUpdateCDSFront-end testingThis evening I prepared a new 2 TB 3.5"
disk to hold a copy of /opt/rtcds and /opt/rtapps
from chiara. This is the final piece of setup
  
  15976   Mon Mar 29 17:55:50 2021 JonUpdateCDSFront-end testingCloning of chiara:/home/cvs underway

I
returned today with a beefier USB-SATA adapter,
which has an integrated 12 V supply
  
  15979   Tue Mar 30 18:21:34 2021 JonUpdateCDSFront-end testingProgress today:

Outside Internet access for FE
test stand

This morning Jordan
  
  2772   Mon Apr 5 13:52:45 2010 AlbertoUpdateComputersFront-ends down. RebootedThis morning, at about 12 Koji found all
the front-ends down.
At 1:45pm rebooted ISCEX, ISCEY,
  
  2376   Thu Dec 10 08:40:12 2009 AlbertoUpdateComputersFronte-ends downI found all the front-ends, except for
C1SUSVME1 and C0DCU1 down this morning. DAQAWG
shows up green on the C0DAQ_DETAIL screen
  
  2378   Thu Dec 10 08:50:33 2009 AlbertoUpdateComputersFronte-ends down

    
        
  
  2382   Thu Dec 10 10:01:16 2009 JenneUpdateComputersFronte-ends downAll the front ends are back up.  

  
  2383   Thu Dec 10 10:31:18 2009 JenneUpdateComputersFronte-ends down

    
        
  
  16336   Thu Sep 16 01:16:48 2021 KojiUpdateGeneralFrozen 2It happened again. Defrosting required.  P_20210916_003406_1.jpg 
  10756   Thu Dec 4 23:45:30 2014 JenneUpdateCDSFrozen?[Jenne, Q, Diego]
I don't know why, but everything
in EPICS-land froze for a few minutes just
  
  3782   Tue Oct 26 01:53:21 2010 Joonho LeeUpdateElectronicsFuction Generator removed.Today
I worked on how to measure cable impedance
directly.
  
  8908   Tue Jul 23 16:39:31 2013 KojiUpdateGeneralFull IFO alignment recovered[Annnalisa Koji]
Full alignment of the IFO was recovered.
The arms were locked with the green beams
 alignment.png 
  8912   Tue Jul 23 20:41:40 2013 gautamConfigurationendtable upgradeFull range calibration and installation of PZT-mounted mirrors Given
that the green beam is to be used as the
 M1_Pitch_calib.pdfM1_Yaw_calib.pdfM2_Pitch_calib.pdfM2_Yaw_calib.pdfPI_S330.20L.pdf 
  8967   Mon Aug 5 18:48:44 2013 gautamConfigurationendtable upgradeFull range calibration of PZT mounted mirrors for Y-endtable I
had prepared two more PZT mounted mirrors
for the Y-end some time back. These are:
 2-inch-CVI-Yawcalib.pdf2-inch-CVI-Pitchcalib.pdf1-inch-Laseroptik-Yawcalib.pdf1-inch-Laseroptik-Pitchcalib.pdf 
  2279   Tue Nov 17 10:09:57 2009 josephbUpdateEnvironmentFumesThe smell of diesel is particularly bad
this morning.  Its concentrated enough
to be causing me a headache.  I'm heading
  
  6191   Thu Jan 12 11:08:23 2012 Leo SingerUpdatePEMFunky spectrum from STS-2I am trying to stitch together spectra
from seismometers and accelerometers to produce
a ground motion spectrum from Hz to 100's
 spectrum.jpg 
  932   Fri Sep 5 09:56:14 2008 josephb, EricConfigurationComputersFunny channels, reboots, and ethernet connections1) Apparently the I00-ICS type channels had
gotten into a funny state last night, where
they were showing just noise, exactly when
  
  687   Thu Jul 17 00:59:18 2008 JenneSummaryGeneralFunny signal coming out of VCOWhile working on calibrating the MC_F signal,
Rana and I noticed a funny signal coming
out of the VCO.  We expect the output to
 VCOout_time.PNGVCOout_freq.PNG 
  9583   Tue Jan 28 22:24:46 2014 ericq UpdateGeneralFurther Alignment[Masasa, ericq]
Having no luck doing things remotely,
we went into the ITMX chamber and roughly
  
  12107   Thu May 5 14:03:52 2016 ericqUpdateLSCFurther Aux X PDH tweaksThis morning I poked around with the green
layout a bit. I found that the iris immediately
preceding the viewport was clipping the ingoing
 2016-05-05_newals.pdf 
  4581   Thu Apr 28 12:25:11 2011 josephbUpdateCDSFurther adventures in Hyper-threadingFirst, I disabled front end starts on boot
up, and brought c1sus up.  I rebuilt
the models for the c1sus computer so they
  
ELOG V3.1.3-