40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 83 of 337  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  13914   Mon Jun 4 11:34:05 2018 Jon RichardsonUpdateCamerasUpdate on GigE CamerasI spent a day trying to modify
Joe B.'s LLO camera client-server code
without ultimate success. His codes now runs
  
  13898   Wed May 30 16:12:30 2018 Jonathan HanksSummaryCDSLooking at c1oaf issuesWhen c1oaf starts up there are 446 gain
channels that should be set to 0.0 but which
end up at 1.0.  An example channel is
  
  629   Thu Jul 3 12:36:05 2008 JonhSummarySUSETMY watchdogETMY watchdog was tripped. I turned it off
and re-enabled the outputs.
  
  3976   Tue Nov 23 11:32:03 2010 JoonhoSummaryElectronicsRF distribution unit.The last time(Friday) I made an arrangement
for RF distribution unit.
I am making RF distribution unit
 Frequency_Distribution_Unit_Arrangement.jpg 
  4139   Tue Jan 11 21:08:19 2011 JoonhoSummaryCamerasCCD cables upgrade plan.Today
I have made the CCD Cable Upgrade Plan for
improvement of sysmtem.
 CCD_Cable_Upgrade_Plan_Jan11_2011.pdf 
  4328   Fri Feb 18 20:17:07 2011 JoonhoSummaryElectronicsIsolation of Voltage regulatorToday I was working on RF distribution
box.
So far I almost finished to electronically
  
  3655   Tue Oct 5 18:27:18 2010 Joonho LeeSummaryElectronicsCCD cable's impedenceToday
I checked the CCD cables which is connected
to the VIDEOMUX.
  
  3694   Mon Oct 11 23:55:25 2010 Joonho LeeSummaryElectronicsCCD cables for output signalToday
I checked all the CCD cables which is connected
output channels of the VIDEOMUX.
  
  3739   Mon Oct 18 22:11:32 2010 Joonho LeeSummaryElectronicsCCD cables for input signalToday
I checked all the CCD cables which is connected
input channels of the VIDEOMUX.
  
  3782   Tue Oct 26 01:53:21 2010 Joonho LeeUpdateElectronicsFuction Generator removed.Today
I worked on how to measure cable impedance
directly.
  
  3949   Thu Nov 18 16:42:29 2010 Joonho LeeConfigurationElectronicsQuad Video for PMCT, RCT, RCR fixed.The far
right monitor in the control room is now
displaying IMCR, PMCT, RCR, RCT.
  
  3950   Thu Nov 18 17:42:20 2010 Joonho LeeSummaryElectronicsCCD cables.I finished
the direct measurement of cable impedances.
Moreover,
 Upgrade_plan_(Nov18).pdf 
  4010   Fri Dec 3 15:56:50 2010 Joonho, Jenne.SummaryElectronicsRF distribution unit planThe last time(Moonday) Jenne and I worked
on the RF distribution unit's structure.
We are making RF distribution unit
 RFsystem_plant_VISIO2.png 
  15158   Mon Jan 27 14:01:01 2020 JordanConfigurationGeneralRepurposed Sorenson Power Supply The 24 V Sorenson (2nd from bottom) in
the small rack west of 1x2 was repurposed
to 12V 600 mA, and was run to a terminal
  
  15203   Mon Feb 10 15:04:42 2020 JordanUpdateGeneralHDMI Routing for new tv Ran HDMI to the new tv mounted on the north
wall of control room.
  
  15204   Mon Feb 10 15:54:47 2020 JordanUpdatePSLCompleted Acromag WiringAll spare channels on the PSL acromag chassis
are connected with ~12in of spare wiring
for future use.
  
  15205   Mon Feb 10 15:55:46 2020 JordanUpdatePSLPMCTRANSPD[Gautam, Jordan]

Gautam showed me how the PMCTRANSPD
signal was reading zero, and he suspected
 ADC1.jpg 
  15344   Fri May 22 10:14:47 2020 JordanUpdateGeneralNitrogen ReplacementI was in the lab for Clean and Bake activities
and I replaced an empty N2 tank. Left tank
is at 2600 psi right tank at ~1300 psi.
  
  15354   Tue May 26 10:04:54 2020 JordanUpdateGeneralN2 ReplacementReplaced empty N2 tank, left tank at ~2000
psi, right tank ~2600 psi.
  
  15375   Thu Jun 4 08:45:41 2020 JordanUpdateGeneralPresence at 40mI will be at the 40m, in the Clean and
bake lab today from ~9am to ~3pm.
  
  15378   Fri Jun 5 08:44:50 2020 JordanUpdateGeneralPresence at 40mI will be at the 40m,
in the Clean and bake lab today from ~9am
to ~3pm.
  
  15385   Tue Jun 9 09:35:02 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab today
from 9:30am to 4pm.
  
  15388   Wed Jun 10 14:00:33 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab from
10am to 4pm today. I will also replace an
empty N2 cylinder.
  
  15390   Thu Jun 11 11:14:12 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab today
from 11am to 4pm.
  
  15395   Fri Jun 12 11:40:14 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab today
from 12pm to 4pm.
  
  15400   Tue Jun 16 08:58:11 2020 JordanUpdateGeneralPresence at 40mI will be at the 40m today at 10am to deliver
optics to Downs and to replace the TP2 controller.
  
  15403   Tue Jun 16 16:05:26 2020 JordanUpdateGeneralN2 ReplacementI replaced an empty N2 cylinder, there
are now two empty tanks in the outside rack.
  
  15405   Thu Jun 18 09:46:03 2020 JordanUpdateGeneralPresence at 40mI will be at the 40m today from 9:30am
to 4pm.
  
  15409   Thu Jun 18 15:25:08 2020 JordanUpdateVACTP2 and TP3 Forepump removalI removed the backing pumps for TP2 and
TP3 today to test ultimate pressure and determine
if they need a tip seal replacement. This
  
  15411   Thu Jun 18 16:56:34 2020 JordanUpdateVACTP2 and TP3 Forepump removal


Quote:


  
  15414   Fri Jun 19 08:47:10 2020 JordanUpdateGeneralPresence at 40mI will be at the 40m today from 9am to
3pm.
  
  15417   Fri Jun 19 14:03:50 2020 JordanUpdateVACForepump Tip Seal ReplacementTip Seals were replaced on the forepumps
for TP2 and TP3, and both are ready to be
installed back onto the forelines.
  
  15422   Mon Jun 22 13:16:38 2020 JordanUpdateGeneralPresence at 40mI will be at the 40m today from 11am to
4pm.
  
  15426   Wed Jun 24 10:14:56 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab today
from 10am to 4pm.
  
  15430   Thu Jun 25 11:09:01 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab from
11pm to 4pm
  
  15432   Fri Jun 26 11:00:52 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab today
from 11am to 4pm.
  
  15437   Mon Jun 29 11:41:04 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab today
from 11:30am to 4pm
  
  15441   Tue Jun 30 08:50:12 2020 JordanUpdateGeneralPresence at 40mI will be in the clean and bake lab today
from 9am to 4pm.
  
  15444   Wed Jul 1 08:51:52 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab from
9am to 4pm today.
  
  15448   Thu Jul 2 16:51:23 2020 JordanUpdateGeneralBathroom ScienceAs part of an ongoing effort to improve
airflow in workspaces/bathrooms on campus,
 AirScrubber40m.jpg 
  15453   Mon Jul 6 08:48:15 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab today
from 8:30am to 4pm
  
  15459   Wed Jul 8 08:51:35 2020 JordanUpdateGeneralPresence at 40mI will be in the clean and bake lab today
from 9am to 3pm.
  
  15461   Thu Jul 9 09:22:44 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab today
from 9am to 3pm
  
  15467   Fri Jul 10 10:37:30 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab today
from 9am to 4pm
  
  15478   Tue Jul 14 09:04:53 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake Lab today
from 9am to 4pm.
  
  15492   Fri Jul 17 09:03:58 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab today
from 9am to 4pm.
  
  15500   Fri Jul 24 15:40:59 2020 JordanUpdateVACInstallation of two new UPS unitsI installed the Tripp
Lite SMX1000RT2U and Tripp
Lite Smart1000LCD at the
 UPS.jpg 
  15591   Mon Sep 21 15:57:08 2020 JordanUpdateVACTP3 Forepump Replacement and Vac resetI removed the forepump (Varian SH-110)
for TP3 today to see why it had failed over
the weekend. I tested it in the C&B lab
 Screenshot_from_2020-09-21_15-56-04.png20200921_145043.jpg20200921_145040.jpg 
  15602   Wed Sep 23 15:06:54 2020 JordanUpdateVACTP2 Forepump Re-installI removed the forepump to TP2 this morning
after the vacuum failure, and tested in the
C&B lab. I pumped down on a small volume
 Screenshot_from_2020-09-23_15-15-43.pngMainVolPumpDown.png 
  15615   Tue Oct 6 14:35:16 2020 JordanUpdateVACSpare forepumpsI have placed 3 new in box, IDP 7 forepumps
along the x arm of the interferometer. These
are to be used as spares for both the 40m
  
ELOG V3.1.3-