40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 80 of 341  Not logged in ELOG logo
Entry  Tue Jul 8 08:16:56 2008, steve, Update, PSL, PMC problem pmc.jpg
Entry  Tue Jul 8 10:20:10 2008, steve, Update, PEM, HEPA turned on hepa.jpg
Entry  Tue Jul 8 10:26:30 2008, Masha, Update, Auxiliary locking, setup updates 
Entry  Tue Jul 8 21:58:22 2008, alberto, Update, General, Secondaty beam aligned to the IFO beam again 
Entry  Wed Jul 9 12:42:14 2008, John, Update, Locking, Hand off to RF CARM LongLock080709.png
Entry  Thu Jul 10 14:59:01 2008, rob, Update, Locking, RF common mode at zero offset lock_control_sequence_worked.pngtrendpowerbuild.png
Entry  Thu Jul 10 19:12:07 2008, Alberto, Update, General, abs cavity length measurement experiment 
Entry  Fri Jul 11 09:29:02 2008, steve, Update, PSL, the PMC still hangs up pmc4d.jpg
    Reply  Fri Jul 11 23:55:25 2008, alan, Update, Locking, RF common mode at zero offset 
Entry  Sat Jul 12 23:28:31 2008, rana, Update, PSL, PMC needs help Untitled.png
Entry  Mon Jul 14 19:15:43 2008, Alberto, Update, General, abs cavity length measurement experiment 
    Reply  Mon Jul 14 21:34:10 2008, Alberto, Update, General, abs cavity length measurement experiment 
Entry  Tue Jul 15 09:47:09 2008, steve, Update, PEM, lab temps and particles temps24d.jpg
Entry  Tue Jul 15 10:24:57 2008, steve, Update, PSL, PMC temp & pzt voltage pmctemp.jpg
Entry  Tue Jul 15 12:23:22 2008, Jenne, Update, General, MC2 Watchdog tripped 
Entry  Wed Jul 16 09:27:17 2008, steve, Update, ALARM, PSL-FSS_RMTEMP alarm is false frmtemp2y.jpg
Entry  Wed Jul 16 11:00:15 2008, Masha, Update, Auxiliary locking, improving ADC input for the mach zehnder setup and completely unrelated happenings 
Entry  Wed Jul 16 11:26:47 2008, Max Jones, Update, , This Week 
Entry  Wed Jul 16 16:59:07 2008, Alberto, Update, General, Aligment 
Entry  Wed Jul 16 17:51:58 2008, Masha, Update, Auxiliary locking, long measurement 
    Reply  Wed Jul 16 22:29:05 2008, Masha, Update, Auxiliary locking, long measurement 
Entry  Thu Jul 17 08:30:15 2008, steve, Update, PSL, PMC relocked manually pmc4d.jpg
Entry  Thu Jul 17 12:15:21 2008, Eric, Update, PSL, Swept PMC PZT voltage range 
Entry  Thu Jul 17 16:39:58 2008, Max Jones, Update, DAQ, Magnetometer Installed 
Entry  Thu Jul 17 20:13:34 2008, Yoichi, Update, PSL, PMC alignment/mode matching effort 
Entry  Fri Jul 18 16:57:37 2008, Jenne, Update, IOO, Calibrated MC_F MC_Fcalib.png20080717MC_F-MC_I.pdf
Entry  Fri Jul 18 17:06:20 2008, Jenne, Update, Computers, Computers down for most of the day, but back up now 
Entry  Fri Jul 18 17:12:35 2008, Jenne, Update, IOO, Checking out the MC Servo Board 
    Reply  Fri Jul 18 19:15:15 2008, Jenne, Update, IOO, Checking out the MC Servo Board 
Entry  Fri Jul 18 19:30:20 2008, Masha, Update, Auxiliary locking, moving from 40m 
Entry  Fri Jul 18 19:41:09 2008, Yoichi, Update, PSL, PMC PZT investigation Hysteresis.pngStepResponse.png
    Reply  Fri Jul 18 23:24:24 2008, rob, Update, PSL, PMC PZT investigation 
    Reply  Sat Jul 19 19:39:44 2008, rob, Update, PSL, PMC PZT investigation 
Entry  Mon Jul 21 09:52:05 2008, Sharon, Update, , Adaptive code changes 
Entry  Mon Jul 21 10:00:42 2008, steve, Update, PEM, ifo room temp temp5y.jpg
Entry  Mon Jul 21 11:54:00 2008, Jenne, Update, General, MC Servo Board 
Entry  Mon Jul 21 19:48:57 2008, Sharon, Update, , how tp restart C1ASS 
Entry  Tue Jul 22 03:03:22 2008, John, Rob, Update, PSL, FSS open loop transfer function 
Entry  Tue Jul 22 09:24:17 2008, steve, Update, PSL, laser power power120d.jpg
Entry  Tue Jul 22 11:55:22 2008, rana, Update, PSL, Note from R. Abbott re: the PMC 
    Reply  Tue Jul 22 13:15:14 2008, rob, Update, PSL, Note from R. Abbott re: the PMC 
    Reply  Tue Jul 22 13:16:09 2008, John, Rob, Update, PSL, FSS open loop transfer function 
Entry  Tue Jul 22 22:11:58 2008, Yoichi, Update, LSC, X-arm g factor measurement 
Entry  Tue Jul 22 22:25:31 2008, rana, Update, LSC, Looptickle for existing 40m nb.png
Entry  Wed Jul 23 10:47:05 2008, Sharon, Update, , Weekly update 
Entry  Wed Jul 23 10:49:37 2008, Max, Update, Computer Scripts / Programs, Weekly Progress Report 
Entry  Wed Jul 23 13:52:26 2008, Sharon, Update, , MEDM changes matrix
Entry  Wed Jul 23 18:42:18 2008, Jenne, Update, PSL, Alignment of AOM 
Entry  Wed Jul 23 22:34:07 2008, Yoichi, Update, LSC, Arm cavity g-factor measurement 
    Reply  Thu Jul 24 01:27:00 2008, Koji, Update, LSC, Arm cavity g-factor measurement 
ELOG V3.1.3-