40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 7 of 344  Not logged in ELOG logo
Entry  Mon Aug 11 12:42:04 2008, josephb, Configuration, Computers, Continuing saga of c1susvme1 
Coming back after lunch around 12:30pm, c1susvme1's status was again red.  After switching off watchdogs, a reboot (ssh, su, reboot) and restarting startup.cmd,
c1susvme1 is still reporting a max sync value (16384), occassionally dropping down to about 16377.  The error light cycles between green and red as well.
Entry  Mon Aug 11 13:59:23 2008, josephb, Configuration, Computers,  
While poking around the crate, I noticed an error light on one of the c1susvme2 related boards was lit, while the corresponding light on the c1susvme1 was
not.  This confuses me as the c1susvme1 is the one having problems.
Entry  Mon Aug 11 15:07:49 2008, josephb, Configuration, Computers, Procyon aka fb40m switched to new switch 
I've connected Procyon to the Prosafe 24 port switch with a new, labeled Cat6 cable.  Quick tests with dataviewer shows that its working.
Entry  Tue Aug 12 12:21:13 2008, josephb, Configuration, Cameras, Variation in fit over 140 images for GC650 and GC750 
Used matlab to calculate Gaussian fits on 145 GC650 images and 142 GC750 images.  These were individual images (no averaging) looking at the PSL output
from May 29th 2008.  The GC650 and GC750 were looking at a split, but had different exposure values, slightly different distances to the nominal waist
of the beam, and were not centered on the beam identically.  Mostly this is a test of the fluctuations in the fit from image to image.
Entry  Wed Aug 13 17:00:59 2008, steve, Configuration, SUS, BS sat amp removed 
The PRM sat amp is broken. Ben is working on it.
The BS sat amp was removed from the BS sus and it is used with the PRM in
order to damp it for wire stand-off alignment.  
Entry  Thu Aug 14 19:08:14 2008, Yoichi, Configuration, SUS, Free swing measurement going on 
I started free swinging spectra measurement of all the suspensions now Aug 14 19:05 (PDT).
The watch dogs are all shutdown. Please do not turn them back on until tomorrow morning.
Entry  Fri Aug 15 11:52:32 2008, josephb, Configuration, Cameras, Multi-computer display and recording of digital camera output 
Through the magic of gstreamer, I've been able to live play on one machine, compress the image, send it to another machine via udp, and also display it
there.  The "tee" function also allows one to save at the same images at time as well.
Entry  Fri Aug 15 19:32:49 2008, steve, Configuration, VAC, pumpdown complete pdprm.jpg
I have just reached vacuum normal. The maglev peaked at 49.8C body temp with aux fan on at 3.2 Torr
cc1 1e-4Torr
Entry  Mon Aug 18 08:07:10 2008, Yoichi, Configuration, SUS, Suspension free swinging 
I've started a free swinging measurement of OSEM spectra now. Please leave the watchdogs untouched.
Entry  Mon Aug 18 15:32:18 2008, josephb, Configuration, Cameras, How to multicast with gstreamer and Gige Cameras 
In order to get multicasting to work, one simply needs to understand the address scheme.

In general, the address range 224.0.0.0 - 239.255.255.255 are reserved for multicasting.  Within in this address space, there are some base level operations
Entry  Tue Aug 19 13:34:58 2008, josephb, Configuration, Computers, Switched c1pem1, c0daqawg, c0daqctrl over to new switches 
Moved the Ethernet connections for c1pem1, c0daqawg, and c0daqctrl over to the Netgear Prosafe switch in 1Y6, using new cat6 cables.
Entry  Tue Aug 19 19:14:17 2008, Yoichi, Configuration, DAQ, Fixed C1:IOO-MC_RFAMPDDC 
Yoichi, Rob

C1:IOO-MC_RFAMPDDC, which is a PD at the transmission port of the MC, was not recording sensible values. 
Entry  Thu Aug 21 10:24:20 2008, steve, Configuration, SAFETY, laser safe mode condition 
The MOPA and PSL shutters are closed.
Manual beam blocks are in place.
Enclosure interlock is enabled.
Entry  Thu Aug 21 16:28:59 2008, steve, Configuration, SAFETY, safety glasses required  
I just opened the MOPA shutter so PA is warming up.

High power beam path is cleared and laser safety glasses required. 
Entry  Mon Aug 25 14:42:09 2008, Eric, Configuration, Cameras, ETMX Digital Camera 
I changed the lens on the camera looking at the ETMX to a 16mm, 1:1.4 zoom lens.  This is in preparation to measure a couple parameters that depend on the
camera's position and angle, so please avoid repositioning it for a couple of days.
Entry  Mon Aug 25 21:15:23 2008, rana, Configuration, LSC, aux NPRO off 
[FONT=Comic Sans MS][COLOR=purple]Looks like no one has used the Lightwave NPRO on the AS table after Koji left, so I turned it off so that it can rest
until Alberto does the X-arm measurements.[/COLOR][/FONT]
Entry  Tue Aug 26 09:04:59 2008, rana, Configuration, PSL, PMC Servo Board: Out for Repairs 
I've started modifying our PMC board to bring it up to the 21st century - [B][COLOR=blue]leave the screen alone[/COLOR][/B] or else you might zap something.
Entry  Tue Aug 26 15:06:16 2008, steve, Configuration, VAC, rga scan RGA-0808260125.png
Pumpdown 66 PRM-maglev vac normal -day 11
short form: pd66PRM-m-d11
Entry  Thu Aug 28 18:56:14 2008, rana, Configuration, PSL, beam block distorted 
There was a beam block after the Mach Zender. Who or what put this there?

The going to the MC now looks distorted as if someone has left something funny in the beam or maybe the new PMC has started to degrade??
    Reply  Fri Aug 29 10:20:32 2008, Yoichi, Configuration, PSL, beam block distorted 
[quote]There was a beam block after the Mach Zender. Who or what put this there?

The going to the MC now looks distorted as if someone has left something funny in the beam or maybe the new PMC has started to degrade??
Entry  Fri Aug 29 11:01:49 2008, josephb, Configuration, Computers, Attempt to change a channel gain in ICS-110B 
As noted earlier by Rana, I was playing around with the /cvs/cds/caltech/chans/daq/C1IOOF.ini file with help from Rob.  I had made a backup before hand
and saved it as C1IOOF.ini.Aug-28-2008.  (I have since been informed that C1IOOF.ini.082808 would have been prefered as a name).
Entry  Fri Aug 29 12:41:26 2008, josephb, Eric, Configuration, Computers, More front ends moved to new network 
Used Cat6 cables to finish moving all the front ends in 1Y4 and 1Y5 over to the new GigE network switches, specifically to the switch in 1Y6.  This included
the ones labeled c1susvme2, c1sosvme, and c1dscl1epics0.
    Reply  Fri Aug 29 16:35:18 2008, Yoichi, Configuration, PSL, beam block distorted 
[quote]There was a beam block after the Mach Zender. Who or what put this there?

The going to the MC now looks distorted as if someone has left something funny in the beam or maybe the new PMC has started to degrade??
Entry  Fri Aug 29 17:39:25 2008, rana, Configuration, PSL, PMC: ADC Channels mcf.png
The attached PNG shows the PMC error and controls signals with no calibration.

There are 3 states:
Entry  Sat Aug 30 13:28:01 2008, rana, Configuration, PSL, PMC: List of changes 
This is a list of changes made to the PMC board while we had it out for modifying the notch:

[LIST]
Entry  Mon Sep 1 19:23:17 2008, Yoichi, Configuration, PSL, FSS on an auxiliary loop 
Summary: The FSS is now temporarily disabled. Naturally, the MC won't lock. I will fix it tomorrow morning.

Today, I did the 4th item of my TO DO list.
    Reply  Tue Sep 2 09:58:42 2008, Yoichi, Configuration, PSL, FSS on an auxiliary loop 
[quote]Summary: The FSS is now temporarily disabled. Naturally, the MC won't lock. I will fix it tomorrow morning.
  [/quote]
Entry  Tue Sep 2 22:43:16 2008, Yoichi, Configuration, PSL, Updated FSS open loop TF OPLTF.png
Since the LO level of the FSS servo was too low, I replaced the RF oscillator board with a combination of
a Stanford signal generator and an RF amplifier.
Right now, the POY RF amplifier is used for this purpose temporarily. 
Entry  Wed Sep 3 18:43:19 2008, Yoichi, Configuration, Electronics, Two more active probes Tektronix-P6201-active-probe.pdf
I found two active probes, an HP41800A and a Tektronix P6201.
Thanks John for telling me you saw them before.
Now we have three active probes, wow !
Entry  Wed Sep 3 18:45:01 2008, Alberto, Configuration, , PD3 gain 
Alberto, Yoichi,

We found that the PD3 servo was unstable with a gain of 1, so we switched it to 0.5
Entry  Thu Sep 4 11:33:25 2008, josephb, Eric, Jenne, Configuration, Computers, Attempt to increase gain for C1:PSL-ISS_INMONPD_F via 110B 
We were attempting to increase the gain on the channel C1:PSL-ISS_INMONPD_F in preparation to do a scan of the PMC at very low input power. 

We started by adding a line to the C1:IOOF.ini file in /cvs/cds/caltech/chans/daq/ under that channel that said "gain=10.0".  Before touching anything,
    Reply  Thu Sep 4 16:24:56 2008, rana, Configuration, Computers, Attempt to increase gain for C1:PSL-ISS_INMONPD_F via 110B 
[quote]We were attempting to increase the gain on the channel C1:PSL-ISS_INMONPD_F in preparation to do a scan of the PMC at very low input power. 
[/quote]
According to [URL=http://en.wikipedia.org/wiki/Arithmetic]the Wikipedia[/URL], certain esoteric mathematical
Entry  Thu Sep 4 18:02:34 2008, rana, josephb, Configuration, PEM, Accelerometer gains increased by 10 acc.png
[COLOR=chocolate][SIZE=3]We increased the Accelerometer gains by 10 by modifying the C1ADCU_PEM.ini file.[/SIZE][/COLOR]
[CODE]
[C1:PEM-ACC_MC1_X]
Entry  Fri Sep 5 09:56:14 2008, josephb, Eric, Configuration, Computers, Funny channels, reboots, and ethernet connections 
1) Apparently the I00-ICS type channels had gotten into a funny state last night, where they were showing just noise, exactly when Rana changed the accelerometer
gains and did major reboots.  A power cycle of the c1ioo crate and appropriate restarts fixed this.
Entry  Mon Sep 8 15:38:57 2008, Yoichi, Configuration, PSL, POY RF amp is back to its original task 
I temporarily fixed the busted ZHL-32A RF amplifier's power connector by simply soldering a cable to the internal circuit and pulling the cable out of the
box through a hole for the power connector.
So I released the POY RF amplifier from the temporary duty of serving the FSS RF distribution and put it back to the original task, 
Entry  Thu Sep 11 11:29:14 2008, josephb, Configuration, Computers, Final netgear switch in place in 1Y2 
I've placed the final (of 4) Netgear prosafe 24 port switch at the very top of 1Y2.  At that location, there are no holes left to screw into, so it has
4 rubber feet and is sitting on the top most signal generator.  It has been plugged in and connected to the control room hub with a labeled cat6 ethernet
cable.
Entry  Mon Sep 15 14:00:52 2008, josephb, Configuration, Computers, 1Y9 Hub and C1asc 
The 1Y9 switch is now using a labeled Cat6 cable in cable trays to connect to the main switch in the offices.  In addition, the c1asc cable which had been
coming out the door was fixed last Friday, and is now labeled, going out the top and connects to the hub in 1Y2.
Entry  Tue Sep 16 10:57:45 2008, Yoichi, Configuration, PEM, Particle counter gain 
Summary:
Since we reduced the integration time of the particle counter by a factor of 10, we had to add a gain of 10
to the EPICS channels C1:PEM-count_full and C1:PEM-count_half.
Entry  Tue Sep 16 13:04:22 2008, Yoichi, Configuration, PEM, C1:PSL-FSS_RMTEMP alarm level changed 
At the request of Steve, I modified the HIGH value of C1:PSL-FSS_RMTEMP from 21.27 to 23.0.
The HIHI is set to 23.50.
Entry  Tue Sep 16 16:47:01 2008, pete, Configuration, PSL, Prototype FSS reference installed 
After verifying output, I installed the new prototype 21.5 MHz FSS reference (Wenzel crystal oscillator and ZHL-2 amp).  Yoichi and I successfully locked
the MC, and have left the new reference in place.  It's temporarily sitting on the corner of the big black optics table (AP table?).
Entry  Wed Sep 17 12:55:28 2008, rob, Configuration, IOO, MC length 
I measured the mode cleaner length last night:

[code]
Entry  Wed Sep 17 13:43:54 2008, Yoichi, Configuration, PSL, RC sweep going on 
I'm doing a cavity sweep of the RC. Please leave the IFO untouched until the meeting is over.
    Reply  Wed Sep 17 15:22:31 2008, Yoichi, Configuration, PSL, RC sweep going on 
[quote]I'm doing a cavity sweep of the RC. Please leave the IFO untouched until the meeting is over.[/quote]

The measurement is still going on.
    Reply  Wed Sep 17 17:58:35 2008, Yoichi, Configuration, PSL, RC sweep going on 
The cavity sweep is done. The IFO is free now.
Entry  Thu Sep 18 14:36:54 2008, josephb, Configuration, Computers, Name server and Epics 
The problems Rob was experiencing last night was due to part of the setup (or rather testing of the setup) of the new nameserver running on linux1.

The name server was setup on linux1 by doing the following:
Entry  Fri Sep 19 11:21:45 2008, josephb, Configuration, Computers, Nameserver and Rosalba 
I tried modifying the nsswitch.conf file to include going to dns in addition to local files for everything (services, network, etc) and then moving the
/etc/hosts file to /etc/hosts.bak.  Unfortunately, this still didn't allow front-ends to reboot properly.  So I'm not sure what is using the hosts file,
but whatever it is, is apparently important.  After the test I placed the hosts file back and reverted the nsswitch.conf file.
Entry  Mon Sep 22 21:30:06 2008, rana, Configuration, PSL, bad FSS DAQ.png
The MC refl power was going up and the FSS PC drive was so large that I had to turn up the FSS
common gain from 1.5 dB to 10.5 dB to get it to be better. Attached are the before (REF) and
after plots of frequency noise. Is the FSS gain really supposed to be 1.5 dB?? How did we gain
    Reply  Mon Sep 22 22:24:19 2008, rana, Configuration, PSL, bad FSS 
[quote]The MC refl power was going up and the FSS PC drive was so large that I had to turn up the FSS...[/quote]

Looks like I bumped the PS for the 21.5 MHz test setup and changed the supply voltage of the amplifier
Entry  Tue Sep 23 15:28:06 2008, pete, Configuration, PSL, new 21.5 MHz FSS reference installed fss_ref_001.jpgfss_ref_013.jpg
The new 21.5 MHz FSS reference is now installed in the rack with the 7 Sorensen PS.  Both outputs give 18.7 dBm.  The MC seems happy.

Bob did the +24 V and +15 V hookups for the amp and the Wenzel oscillator respectively, off of the din strips on the right of the rack. 
Entry  Wed Sep 24 19:13:06 2008, rana, Configuration, Computer Scripts / Programs, updatedb & locate: megatron & rosalba 
I ran [I]updatedb[/I] as root today on megatron and rosalba just before the meeting. 
It finished at ~14:10 on both machines so that's ~20 minutes total.
ELOG V3.1.3-