40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 79 of 170  Not logged in ELOG logo
Entry  Fri Jun 22 02:21:57 2012, Jenne, Update, Green Locking, 2 arm ALS - Success!!!! P6210140.AVIspeedy_gonzales-5257.jpg
    Reply  Fri Jun 22 03:37:42 2012, Koji, Update, Green Locking, 2 arm ALS - Success!!!! 
       Reply  Fri Jun 22 10:52:18 2012, yuta, Update, Green Locking, 2 arm ALS - Success!!!! 
Entry  Thu Jun 21 20:07:18 2012, Jamie, Update, Green Locking, Improved beatbox returns 
Entry  Thu Jun 21 15:36:51 2012, yuta, Update, Locking, X arm alignment 
Entry  Thu Jun 21 15:00:55 2012, steve, Update, SAFETY, SURFs 2012 safety training surfs2012.JPG
Entry  Tue May 29 14:58:28 2012, Jenne, Update, Locking, ETMX trans camera 
    Reply  Tue May 29 15:49:02 2012, Koji, Update, Locking, ETMX trans camera 
       Reply  Thu May 31 11:02:14 2012, steve, Update, Locking, ETMX 1064 trans camera 
          Reply  Wed Jun 20 16:37:11 2012, yuta, Update, Locking, ETMX 1064 trans camera 
             Reply  Thu Jun 21 12:56:49 2012, yuta, Update, Locking, ETMX 1064 trans camera Xarm_EndTableLayout_NewTransCamera.png
Entry  Thu Jun 21 09:10:08 2012, steve, Update, PEM, flow bench must be running all times 
    Reply  Thu Jun 21 12:13:35 2012, Jenne, Update, PEM, flow bench must be running all times 
Entry  Thu Jun 21 09:01:18 2012, steve, Update, STACIS, the resurrection of STACIS -surf IMG_1364.JPG
Entry  Thu Jun 21 02:57:16 2012, Jenne, Bureaucracy, General, 40m Action Items 
Entry  Thu Jun 21 01:58:29 2012, Jenne, Update, Green Locking, Xgreen preparations 
Entry  Tue Jun 19 23:36:19 2012, yuta, Update, LSC, calibrated POY error signal LSCyarmTF_usingITMY.pngLSCyarm_HAover1plusG.pngPOYerrorcalibration.png
    Reply  Wed Jun 20 00:01:04 2012, Jenne, Update, LSC, calibrated POY error signal LSC_POY_11_I_ERR_calib_19June2012.pdfPOY_calib_19June2012_FiltBankSettings.png
    Reply  Wed Jun 20 18:43:57 2012, yuta, Update, LSC, calibrated POX error signal LSCxarmTF_usingITMX.pngLSCxarm_HAover1plusG.pngPOXerrorcalibration.png
Entry  Wed Jun 20 18:09:23 2012, yuta, Update, Locking, both arms aligned, ITMX oplev centered FPMIalignment2010620.png
Entry  Wed Jun 20 18:00:10 2012, rana, Summary, PSL, summaries 
Entry  Wed Jun 20 01:02:20 2012, Jamie, Update, Green Locking, RF amp removed from X arm ALS setup 
Entry  Mon Jun 18 23:54:31 2012, yuta, Update, Green Locking, phase tracker for ALS newIQLOCK.pngYarmScan20120618.pngfine8FSRscan.png
    Reply  Wed Jun 20 00:02:16 2012, yuta, Update, Green Locking, slower scan using phase tracking ALS YarmScan20120619.png
Entry  Tue Jun 19 20:26:50 2012, Jenne, HowTo, Locking, Summer Plan 
Entry  Mon Jun 18 23:38:39 2012, Jenne, Update, LSC, Added LSC channels to frames 
Entry  Mon Jun 18 17:28:03 2012, yuta, Summary, Computers, bugs in CDS_PARTS/simLinkParts/Fcn model_sindegbug.pngdv_sindegbug.png
Entry  Mon Jun 18 16:23:59 2012, Jenne, Update, Locking, LSC trigger update 
Entry  Mon Jun 18 02:31:43 2012, yuta, Summary, Green Locking, analysis of mode scan data coarse5FSRscan.pngfine1FSRscan.pngHOMRFSB.pngcoarse5FSRscanHOMRFSB.png
Entry  Thu Jun 14 21:37:37 2012, yuta, Update, Green Locking, succeeded in 1FSR mode scan YarmScan20120614.png
    Reply  Fri Jun 15 00:50:54 2012, yuta, Update, Green Locking, scanned Y arm for 5FSR YarmScan20120614_2.png
       Reply  Fri Jun 15 01:53:05 2012, Koji, Update, Green Locking, scanned Y arm for 5FSR 
          Reply  Sat Jun 16 12:03:41 2012, Zach, Update, Green Locking, scanned Y arm for 5FSR 
             Reply  Sat Jun 16 13:01:17 2012, yuta, Update, Green Locking, scanned Y arm for 5FSR YarmScanDV.png
       Reply  Sat Jun 16 18:17:00 2012, yuta, Update, Green Locking, Y arm length using 5FSR scan ALS-BEATY_COARSE_I_IN1_DQ.pngCalibYarmScan20120614_2.png
          Reply  Sat Jun 16 18:51:44 2012, Koji, Update, Green Locking, Y arm length using 5FSR scan 
             Reply  Sat Jun 16 19:32:11 2012, yuta, Update, Green Locking, Y arm length using 5FSR scan 
Entry  Sat Jun 16 01:03:21 2012, yuta, Update, Green Locking, used longer delay line for mode scan YarmScan20120615.png
Entry  Fri Jun 15 13:33:39 2012, yuta, Update, Green Locking, ADC noise contribution to ALS YarmALSnoise20120615.png
Entry  Thu Jun 14 04:53:39 2012, yuta, Summary, Green Locking, designing ALS loop for mode scan ALSloop.pngALSopenloop.pngyarmlength.png
Entry  Thu Jun 14 01:36:34 2012, yuta, Update, Green Locking, can't scan Y arm for 1FSR BEATY_COARSE_LoopOnOff.png
Entry  Wed Jun 13 17:39:13 2012, yuta, Update, Green Locking, calibrating the beatbox ALS-BEATY_COARSE_I_IN1_DQ.pngALS-BEATY_COARSE_Q_IN1_DQ.pngALS-BEATY_FINE_I_IN1_DQ.pngALS-BEATY_FINE_Q_IN1_DQ.png
Entry  Wed Jun 13 11:19:05 2012, steve, Update, SUS, IDC receptacles clamped IMG_1341.JPG
Entry  Wed Jun 13 02:11:59 2012, yuta, Update, Green Locking, my first modescan (sort of) modescan20120612_1.png
    Reply  Wed Jun 13 02:24:02 2012, rana, Update, Green Locking, my first modescan (sort of) 
       Reply  Wed Jun 13 03:03:38 2012, yuta, Update, Green Locking, my first modescan (sort of) 
          Reply  Wed Jun 13 11:10:56 2012, rana, Update, Green Locking, my first modescan (sort of) 
Entry  Tue Jun 12 23:18:18 2012, yuta, Update, Green Locking, I-Q signals for the beat FINEIQplot20120612.pngCOARSEIQplot20120612.pngbeatysetup20120612.png
Entry  Tue Jun 12 11:54:50 2012, Jenne, Update, Green Locking, c1gcv recompiled c1gcv20120612.png
    Reply  Tue Jun 12 20:35:46 2012, yuta, Update, Green Locking, c1gcv recompiled c1gcv20120612-2.png
Entry  Tue Jun 12 00:15:51 2012, Jenne, Update, Computers, rtcds: command not found 
    Reply  Tue Jun 12 11:25:05 2012, Jamie, Update, Computers, rtcds: command not found 
       Reply  Tue Jun 12 17:46:09 2012, Jenne, Update, Computers, rtcds: command found 
Entry  Tue Jun 12 17:29:28 2012, Den, Update, CDS, dq channels 
Entry  Tue Jun 12 13:49:32 2012, Jamie, Configuration, Computer Scripts / Programs, tconvert 
Entry  Tue Jun 12 01:03:18 2012, Jenne, Update, Computers, mini boot fest stock-vector-wine-icon-on-computer-keyboard-original-illustration-58731781.jpg
    Reply  Tue Jun 12 02:09:43 2012, Jenne, Update, Computers, mini boot fest 
Entry  Tue Jun 12 01:58:33 2012, yuta, Update, Green Locking, aligned Y arm to Y end green 
Entry  Mon Jun 11 21:50:08 2012, yuta, Update, Green Locking, beatbox looks OK CIMG1522.JPG
Entry  Tue May 29 10:08:21 2012, steve, Update, IOO, centered IOO monitoring qpds 40dtrendIOO.pngIOOcentered.png
    Reply  Fri Jun 1 08:17:47 2012, steve, Update, IOO, PMC trends PMC400d.pngPMC1200d.png
       Reply  Mon Jun 11 09:37:16 2012, steve, Update, IOO, PMC locked PMClocked.png
Entry  Thu Sep 8 13:20:07 2011, steve, Update, PEM, vac envelope at atm for 36 days vent70.jpg
    Reply  Fri Jun 8 15:24:08 2012, steve, Update, VAC, RGA scan at day 276 and pressure plots 40m71pdM276d.pngpd71m276d.pngpd71d276.png
Entry  Fri Jun 8 15:08:27 2012, yuta, Update, Green Locking, aligned/mode-matched Y green beat setup 
Entry  Tue Jun 5 09:32:12 2012, steve, Update, SUS, PRM oscillation  PRMosc.png
    Reply  Wed Jun 6 09:27:09 2012, steve, Update, SUS, PRM damping restored  PRMwhat.png
       Reply  Thu Jun 7 08:12:20 2012, steve, Update, SUS, PRM is still oscillating PRMoscil.png
          Reply  Thu Jun 7 13:18:42 2012, rana, Update, SUS, PRM is still oscillating 
             Reply  Thu Jun 7 13:25:37 2012, Koji, Update, SUS, PRM is still oscillating 
                Reply  Thu Jun 7 18:46:13 2012, yuta, Update, SUS, PRM oplev centered 
Entry  Thu Jun 7 17:49:09 2012, Jamie, Update, CDS, c1sus in weird state, running models but unresponsive otherwise 
Entry  Wed Jun 6 22:04:19 2012, Jamie, Update, Computers, Failed attempt to get pianosa to support dual monitors 
    Reply  Wed Jun 6 22:23:53 2012, Jamie, Update, Computers, Failed attempt to get pianosa to support dual monitors 
       Reply  Thu Jun 7 10:39:21 2012, Jamie, Update, Computers, pianosa dual monitor working 
Entry  Wed Sep 14 15:05:52 2011, steve, Update, PEM, air cond maintenance  ac1y.jpg
    Reply  Tue Jun 5 14:17:14 2012, steve, Update, PEM, air cond maintenance  
       Reply  Thu Jun 7 09:52:05 2012, steve, Update, PEM, air cond maintenance  PEM800d.png
Entry  Wed Jun 6 21:11:45 2012, yuta, Update, Green Locking, improved Y arm green alignment beatygreenpower20120606.png
    Reply  Thu Jun 7 02:25:27 2012, yuta, Update, Green Locking, improved Y arm green alignment - even more beatygreenpower20120607.png
       Reply  Thu Jun 7 07:27:27 2012, Koji, Update, Green Locking, improved Y arm green alignment - even more freq_noise_AUX.pdf
Entry  Thu Jun 7 05:39:41 2012, yuta, Update, Green Locking, coarsely stabilized Y arm length with ALS MyFirstALS20120607.png
Entry  Thu Jun 7 03:37:26 2012, yuta, Update, CDS, mx_stream restarted on c1lsc, c1ioo  
Entry  Thu Jun 7 01:46:05 2012, yuta, Summary, Green Locking, Y green beat - found it!! CIMG1504.JPG
    Reply  Thu Jun 7 02:59:31 2012, yuta, Update, Green Locking, Y green beat - found it!! 
Entry  Wed Jun 6 19:46:46 2012, Suresh, Summary, IOO, Tip-tilt assembly: current status and work remaining IMG_0685.JPGIMG_0687.JPGIMG_0687.JPG
Entry  Tue Jun 5 21:09:40 2012, yuta, Update, Computer Scripts / Programs, hacked ezca tools 
    Reply  Wed Jun 6 18:04:22 2012, Jamie, Update, Computer Scripts / Programs, hacked ezca tools 
       Reply  Wed Jun 6 18:22:52 2012, Jamie, Update, Computer Scripts / Programs, hacked ezca tools 
Entry  Wed Jun 6 15:16:00 2012, yuta, Update, IOO, MC WFS offsets adjusted 
Entry  Wed Jun 6 14:17:56 2012, steve, Update, Computers, iMac ordered 
ELOG V3.1.3-