40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 79 of 344  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  5015   Thu Jul 21 23:36:51 2011 JennyUpdate Fitting beam waist with MATLABI am starting work on the PSL table at
the 40m. My goal is to lock  the laser coming
from the nearby table to the FP cavity and
 twobeamfit2.jpg 
  5036   Tue Jul 26 09:01:53 2011 JennyUpdateComputer Scripts / ProgramsMode matching I found a mode matching solution to match
the beam coming to the PSL table from the
AP table so that I can lock the laser beam
 modematchpic.pngmodematchparameters.png 
  5069   Sat Jul 30 10:01:35 2011 JennyUpdatePSLPSL table work I've been working on the PSL table to put
together a setup so that I can measure the
reference cavity's response to a temperature
 modematchpic.pngmodematchinfo.pngLIGO_block_diagram.pngLIGO_block_diagram.pngmodematch_setup_pic.png 
  5070   Sat Jul 30 10:03:32 2011 JennyUpdateComputer Scripts / ProgramsMode matching I ended up having to switch to a different
mode-matching solution, because I was unable
to find the f = 572.7 mm lens. See my next
  
  5096   Tue Aug 2 17:40:04 2011 JennyUpdatePSLReducing beam intensity incident on photodiodeI am using a PDA255 photodiode to measure
the power outputted by the NPRO beam on the
PSL table. (I'm going to then use a network
  
  5114   Thu Aug 4 00:04:52 2011 JennyUpdatePSLNetwork analyzer and PD set up to measure amplitude response of PZTToday I placed the PDA255 photodiode on
the PSL table to catch the small amount of
beam power reflected by the second polarizing
  
  5126   Fri Aug 5 18:29:35 2011 JennyUpdatePSLNetwork analyzer and PD set up to measure amplitude response of PZT

    

       
            
  
  5144   Mon Aug 8 20:23:14 2011 JennyUpdatePSLNetwork analyzer and PD set up to measure amplitude response of PZT

    

       
            
  
  5149   Tue Aug 9 02:34:26 2011 JennyUpdatePSLPZT transfer function measurementUsing a PDA255 on the PSL table, I measured
the amplitude response of the NPRO PZT, sweeping
from 10kHz to 5 MHz.
  
  5156   Tue Aug 9 16:00:58 2011 JennyUpdatePSLAmplitude response of PZT   AMresponsePZT.pngAMresponsePZT.png 
  5165   Wed Aug 10 02:40:40 2011 JennyUpdatePSLDither freq for PZT chosen: 2.418 MHzI've finished using the network analyzer
to characterize find a dither frequency for
driving the PZT to use in my PDH locking.
  
  5179   Wed Aug 10 20:40:17 2011 JennyUpdatePSLPDH locking: got an error signalI ended up choosing a different dither
frequency for driving the NPRO PZT: 230 kHz,
because the phase modulation response in
  
  5202   Fri Aug 12 03:49:45 2011 JennySummaryPSLNPRO PDH-Locked to Ref Cav
 LIGO_block_diagram_2.pngopenlooperror.jpgIMG_3034.JPGclosedlooperror.jpg 
  5228   Sun Aug 14 04:12:37 2011 JennyUpdatePSLTemperature steps and slow actuator railingBelow are some plots from dataviewer of
temperature-step data taken over the past
32 hours. (They show minute trends). I am
 Picture_6.pngPicture_7.png 
  5230   Sun Aug 14 15:37:39 2011 JennyUpdatePSLTemperature steps and slow actuator railing


   
        
            
  
  5271   Fri Aug 19 19:08:40 2011 JennyUpdatePSLRelocking NPRO to reference cavity. I am trying again to measure a temperature
step response on the reference cavity on
the PSL table.
  
  5272   Fri Aug 19 23:41:20 2011 JennyUpdatePSLRelocking NPRO to reference cavity.

    

       
            
  
  5274   Sat Aug 20 23:01:39 2011 JennyUpdatePSLTaking temperature step-response data: successes and tribulationsAfter finishing my last elog entry, I monitored
the digital loop's error signal (the control
signal for the fast loop) and the output
 5hourwbigimpulse.jpg5hourwbigimpulse2.jpg23hoursbefore920pm.jpg23hoursbefore920pm2.jpg 
  11392   Tue Jul 7 17:22:16 2015 JessicaSummary Time Delay in ALS CablesI measured the transfer functions in the
delay line cables, and then calculated the
time delay from that.
 cableA_fit.jpgcableA_resid.jpgcableB_fit.jpgcableB_resid.jpg 
  11395   Wed Jul 8 17:46:20 2015 JessicaSummaryGeneralUpdated Time Delay PlotsI re-measured the transfer function for
Cable B, because the residuals in my previous
post for cable B indicated a bad fit. 
 resid_CableA.pngresid_CableB.png 
  11416   Wed Jul 15 17:05:06 2015 JessicaUpdateGeneralBandpass Pre-Filter createdI applied a bandpass filter to the accelerometer
huddle data as a pre-filter. The passband
was from 5 Hz to 20 Hz. I found that
 acc1.pngacc2.pngacc3.png 
  11421   Thu Jul 16 16:33:56 2015 JessicaUpdateGeneralAdded Bode Plots of Bandpass FilterI updated the bandpass filter I was using,
finding that having different stopband attenuations
before and after the passband better
 acc1_update.pngacc2_update.pngacc3_update.pngbp_BodeMag.pngbp_BodePhase.png 
  11440   Thu Jul 23 20:54:42 2015 JessicaUpdateGeneralALS Delay Line BoxThe front panels for the ALS delay   
  11441   Thu Jul 23 20:57:15 2015 JessicaSummaryGeneralApplying Pre-filter to data before IIR Wiener FilteringI updated my bandpass filter and have  BodePlot.pngacc_bandpass.pngmcl_seis.png 
  11456   Tue Jul 28 20:42:50 2015 JessicaSummaryGeneralNew Seismometer Data CoherenceI was looking at the new seismometer data
and plotted the coherence between the different
arms of 
 Coherence1.pngCoherence2.png 
  11458   Wed Jul 29 11:15:21 2015 JessicaSummaryLSCPSDs of Arms with seismometer subtractionIgnacio and I downloaded data from the
STS, GUR1, and GUR2 seismometers and from
the mode cleaner and the x and y arms. The
 Arms_PSD.pngXArm_PSD.pngYArm_PSD.png 
  11471   Thu Jul 30 18:58:36 2015 JessicaUpdateGeneralALS Delay Line Box Front Panel TestingI tested both of the front panels (conductive
and isolated SMAs) with the ALS Delay Line
Box by driving extremely close frequencies
 Xarm_diff.pngYarm_diff.pngXarm_isolated.pngYarm_isolated.png 
  11477   Mon Aug 3 18:19:09 2015 JessicaUpdateGeneralAnodization of front panels accounted forPreviously, I had gotten the same results
for the conductive and the isolated front
panels. Today, I sanded off the anodized
 redo_conduct1X.pngredo_conduct1Y.png 
  11484   Thu Aug 6 11:45:01 2015 JessicaUpdateGeneralALS Delay Line front panel testingKoji had suggested that I sync up the two
function generators to ensure that they have
the same base frequency and so that crosstalk
 conductive_X.pngconductive_Y.pngisolated_X.pngisolated_Y.png 
  11491   Tue Aug 11 10:13:32 2015 JessicaUpdateGeneralConductive SMAs seem to work bestAfter testing both the Conductive and Isolated
front panels on the ALS delay line box using
the actual beatbox and comparing this to
 best4.pngisolated4.png 
  11495   Tue Aug 11 18:43:42 2015 JessicaUpdateIOOMCL Online SubtractionToday I finished fitting the transfer function
to a vectfit model for seismometers T240_X
and T240_Y, and then used these to filter
 SeisX_bode.pngSeisY_bode.pngMCL_first.pngYarm_first.png 
  11502   Thu Aug 13 12:06:39 2015 Jessica SummaryIOOBetter predicted subtraction did not work as well OnlineYesterday I adjusted the preweighting of
my IIR fit to the transfer function of MC2,
and also managed to reduce the number of
 6x 
  6372   Wed Mar 7 13:30:17 2012 JimUpdatePEMadded TPs and JIMS channels to PEM front-end model [Jim Ryan]
The PEM model has been modified now
to include a block called 'JIMS' for the
  
  6397   Fri Mar 9 20:44:24 2012 Jim LoughUpdateCDSDAQ restart with new ini fileDAQ reload/restart
was performed at about 1315 PST today. The
previous ini file was backed up as c1pem20120309.ini
  
  12140   Mon May 30 18:19:50 2016 JohannesUpdateCDSASS medm screen updateI noticed that the TRY button in the ASS
main screen was linking to LSC_TRX instead
of LSC_TRY. Gautam fixed it.
  
  12175   Tue Jun 14 11:29:25 2016 JohannesSummaryASCYArm OpLev CalibrationIn preparation for the armloss map I checked
the calibration of the Y-Arm ITM and ETM
OpLevs with the method originally described
 CavityCoupling.pdf 
  12176   Tue Jun 14 11:52:08 2016 JohannesUpdateGeneralEPICS Installation | SURF 2016We generally want to keep the configuration
of the 40m close to that of the LIGO sites,
which is why we chose BusWorks, and it is
  
  12188   Thu Jun 16 11:25:00 2016 JohannesUpdateLSCY-Arm round-trip loss measurement with ALSUsing the ALS green beat and armlength
feedback I mapped an IR resonance of the
Y-Arm by stepping through a ramp of offset
 T_vs_steps.pdff_vs_steps.pdf 
  12192   Thu Jun 16 18:08:57 2016 JohannesUpdatePSLBefore the AOM installationThere was only one razor blade beam dump
labeled for atmospheric use left, but that's
all we need. Steve is working on restocking.
 IMG_20160615_154556392e.jpg 
  12196   Fri Jun 17 22:36:11 2016 JohannesUpdatePSLAOM installationSubham and I have placed the AOM back into
the setup right in front of the PMC.

Steps undertaken:
 aom_new_mount.jpgaom_beam_split.jpgaom_dump_IR.jpg 
  12270   Thu Jul 7 17:12:50 2016 JohannesUpdateGeneralVent progressI performed a visual inspection of ITMY
in its natural habitat today. I did not get
any great pictures from the HR side because
 IMG_2621.JPGIMG_2623.JPGIMG_2628.JPGIMG_2595.JPG 
  12291   Tue Jul 12 09:35:51 2016 JohannesUpdateGeneralSlippery substance mysteryI've noticed the spot that Rich means
before, too. I think you only notice this
when you're wearing the shoe covers,
  
  12295   Tue Jul 12 23:51:16 2016 JohannesUpdateGeneralVent progress - ETMY inspectionOn Monday I inspected ETMY, and found nothing
really remarkable. There was only little
dust on the HR side, and nothing visible
 IMG_2679.JPGIMG_2673.JPG 
  12296   Wed Jul 13 00:01:38 2016 JohannesUpdateGeneralITMX dustWe ran out of illuminator juice, and short-term
charging couldn't restore enough battery
life to continue the work. We should be able
  
  12297   Wed Jul 13 00:38:25 2016 JohannesUpdateGeneralVent progress - ETMY attempted repositioning[Lydia, Johannes]

We attempted to move the ETMY suspension
near the access port in preparation for the
  
  12310   Tue Jul 19 13:21:42 2016 JohannesUpdateGeneralVent progress - ETMY attempted repositioning[Lydia, Johannes]

We moved ITMY from its original
position to a place near the access point.
  
  12456   Wed Aug 31 18:07:43 2016 JohannesUpdateSUSITMY free swinging[Lydia, Gautam, Koji, Johannes]

Summary of things done today:
  
  12464   Thu Sep 1 19:18:14 2016 JohannesUpdateSUSITMX and ETMX preemptive table levelingI balanced the ITMX and ETMX tables into
level position today, for which I had to
move quite a few of the on-table weights.
 8x 
  12465   Thu Sep 1 19:59:22 2016 JohannesUpdateSUSIR mode flashes in Y arm[Gautam, Lydia, Johannes]


After placing the irises
on the ETMY and ITMY cages we found that
  
  12482   Mon Sep 12 17:15:22 2016 JohannesUpdateGeneralPRM SRM alignment[Gautam, Steve, Johannes]

We put on the remaining heavy doors
on the chambers (ITMY, ITMX,ETMX, in this
 IMG_3273.JPGIMG_3275.JPG 
ELOG V3.1.3-