40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 78 of 169  Not logged in ELOG logo
Entry  Fri Jul 6 20:54:54 2012, Masha, Update, PEM, Current PEM status 
    Reply  Fri Jul 6 22:30:14 2012, Masha, Update, PEM, Current PEM status MashaDV.png
       Reply  Sat Jul 7 15:48:00 2012, Masha, Update, PEM, Current PEM status 
Entry  Fri Jul 6 01:39:56 2012, yuta, Update, Locking, MI + Y arm ALS succeed, but not both FPMIALStrial20120706.pngnewALSMEDMscreen.png
    Reply  Fri Jul 6 14:10:31 2012, yuta, Summary, LSC, calculation of FPMI using ALS 
Entry  Mon Jul 2 18:27:25 2012, yuta, Update, General, BS and ITMX chambers closed 
    Reply  Tue Jul 3 17:23:50 2012, steve, Update, VAC, pumpdown completed pd72.pngpd72vacnormal.pngpd72at9hrs.png
       Reply  Fri Jul 6 09:27:40 2012, steve, Update, VAC, 4 days at atm vent_moves.png
          Reply  Fri Jul 6 09:52:35 2012, steve, Update, VAC, pump down hick up d3wFireworks.pngpdhickup.png
Entry  Fri Jul 6 08:38:04 2012, steve, Update, Computers, time out timingblanks.png
Entry  Fri Jul 6 02:46:03 2012, yuta, Update, Locking, Y arm ALS handing off to LSC handofftoLSC20120706.png
Entry  Thu Jul 5 16:49:35 2012, Jenne, Update, Computers, c1sus is funny 
    Reply  Fri Jul 6 01:12:02 2012, Jenne, Update, Computers, c1sus is fine 
Entry  Thu Jul 5 10:49:38 2012, Jamie, Update, CDS, front-end/fb communication lost, likely again due to timing offsets 
    Reply  Thu Jul 5 11:12:53 2012, Jenne, Update, CDS, front-end/fb communication lost, likely again due to timing offsets 
    Reply  Thu Jul 5 12:27:05 2012, Jamie, Update, CDS, front-end/fb communication lost, likely again due to timing offsets 
Entry  Thu Jul 5 01:34:11 2012, yuta, Update, Locking, MI with X arm ALS 
Entry  Thu Jul 5 01:20:58 2012, yuta, Summary, CDS, slow computers, 0x4000 for all DAQ status 
Entry  Wed Jul 4 21:11:53 2012, yuta, Update, Locking, FPMI in vacuum is back ALL_1025495266.pngMEDMscreenshotswithCOW_20120704.png
Entry  Wed Jul 4 20:13:46 2012, yuta, Bureaucracy, Locking, PRC commissioning plan 
Entry  Wed Jul 4 17:33:04 2012, Jamie, Update, CDS, timing, possibly leap second, brought down CDS 
Entry  Tue Jul 3 20:51:06 2012, yuta, Update, IOO, MC in vacuum is back ALL_1025408289.bmp
Entry  Tue Jul 3 17:56:35 2012, Jamie, Update, Green Locking, Laseroptik dichroic optics received 
    Reply  Tue Jul 3 19:04:59 2012, Jamie, Update, Green Locking, Laseroptik dichroic optics received 
Entry  Tue Jul 3 18:58:14 2012, Yaakov, Update, STACIS, More transfer functions and netGPIB status geo_open_y.pnggeo_open_x.pngaccel_open_x.png
Entry  Mon Jul 2 23:08:38 2012, Yaakov, Update, STACIS, Turning on STACIS geo_open.GIFgeo_closed.GIFgeo_closed.GIFSCRN0005.GIFstacy1.JPG
Entry  Mon Jul 2 18:28:09 2012, Jenne, Update, Photos, Many photos taken 
Entry  Sun Jul 1 23:48:15 2012, yuta, Summary, General, clipping at BS, my plan PR3.JPGPRM.JPG
    Reply  Mon Jul 2 00:41:13 2012, rana, Summary, General, clipping at BS, my plan 
    Reply  Mon Jul 2 10:45:25 2012, Jenne, Summary, General, clipping at BS 
Entry  Sun Jul 1 13:20:09 2012, yuta, Update, IOO, MC in low power 
Entry  Fri Jun 29 22:56:35 2012, Jamie, Update, VAC, input telescope beam clipping on Faraday 
    Reply  Sat Jun 30 18:31:38 2012, steve, Update, IOO, input telescope beam clipping on Faraday 
Entry  Fri Jun 29 16:41:41 2012, yuta, Update, General, PRM was NOT installed backwards 
Entry  Fri Jun 29 02:17:40 2012, yuta, Update, IOO, prep for the vent - beam attenuating 
    Reply  Fri Jun 29 03:21:32 2012, yuta, Update, General, prep for the vent - others MEDMscreenshotswithCOW_20120629.png
       Reply  Fri Jun 29 11:02:00 2012, steve, Update, VAC, the vent is at 500 torr sussum.pngpzt.png
          Reply  Fri Jun 29 13:11:31 2012, steve, Update, VAC, 40m IFO at atm vent06292012.png40m@ATM.png
Entry  Thu Jun 28 00:50:48 2012, yuta, Update, Locking, PRMI work started, commissioning plan POP_1024903948.bmpREFL_1024903929.bmpAS_1024903921.bmp
    Reply  Thu Jun 28 01:44:57 2012, Koji, Update, Locking, PRMI work started, commissioning plan 
    Reply  Thu Jun 28 15:21:02 2012, rana, Update, Locking, PRMI work started, commissioning plan 
       Reply  Thu Jun 28 20:59:28 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW! 
          Reply  Thu Jun 28 22:08:57 2012, Jenne, Bureaucracy, Locking, vent for PRC check, TOMORROW! 
             Reply  Fri Jun 29 01:49:36 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW! 
Entry  Tue May 15 23:40:46 2012, Mike J., Update, Computers, Image Subtraction mc2_1.bmpmc2_2.bmpmc2_1-mc2_2.bmp
    Reply  Wed May 16 11:53:45 2012, Jenne, Update, Computers, Image Subtraction 
    Reply  Wed Jun 27 23:54:21 2012, yuta, Update, Computer Scripts / Programs, image capturing script AS_1024901004.bmp
Entry  Wed Jun 27 16:23:12 2012, yuta, Update, IOO, AS and REFL on AP table aligned 
Entry  Fri May 25 19:13:10 2012, Duncan Macleod, Summary, Computer Scripts / Programs, 40m summary webpages 
    Reply  Fri May 25 20:45:25 2012, Duncan Macleod, Summary, Computer Scripts / Programs, 40m summary webpages 
       Reply  Wed Jun 27 15:10:34 2012, Jamie, Update, Computer Scripts / Programs, 40m summary webpages move 
Entry  Wed Jun 27 14:18:30 2012, Yaakov , Summary, STACIS, First week summary 
Entry  Wed Jun 27 14:12:44 2012, Eric, Summary, General, SURF Week 1 
Entry  Wed Jun 27 11:35:06 2012, Sasha, Summary, Computer Scripts / Programs, SURF - Week 1 - Summary Screen_Shot_2012-06-27_at_11.27.10_AM.pngScreen_Shot_2012-06-27_at_11.26.57_AM.pngScreen_Shot_2012-06-27_at_11.27.29_AM.png
Entry  Wed Jun 27 11:33:28 2012, Masha, Update, General, First Week Update 
Entry  Wed Jun 27 11:27:49 2012, Liz, Update, , First Week Update! 
Entry  Sat Jun 23 02:29:18 2012, yuta, Update, Green Locking, X arm mode scan results XarmScan20120623.pngfine8FSRscanXarm.png
    Reply  Wed Jun 27 03:43:52 2012, yuta, Summary, IOO, how to improve mode matching to arms modematchMCtoARM_design.pngmodematchMCtoARM_MMT1MMT2longer.png
       Reply  Wed Jun 27 10:27:09 2012, rana, Summary, IOO, how to improve mode matching to arms 
Entry  Tue Jun 26 22:37:43 2012, yuta, Update, IOO, energized OMC stages 
Entry  Tue Jun 26 01:30:13 2012, yuta, Summary, Green Locking, simultaneous hold and release of the arm (aka two arm ALS) ALSboth20120625_2withAS.png
Entry  Mon Jun 25 17:48:27 2012, yuta, Update, Computer Scripts / Programs, script for finding IR resonance using ALS findIRresonance20120625.png
Entry  Mon Jun 25 16:21:10 2012, Koji, Summary, IOO, Selection of motorized mirror mounts 
Entry  Mon Jun 25 15:19:07 2012, Yaakov, Update, PEM, Added microphone channels, moved accelorometer channels channels.png
Entry  Mon Jun 25 15:07:49 2012, yuta, Update, IOO, MC beam spot trend MCdecenter.png
Entry  Sat Jun 23 18:44:15 2012, steve, Update, General, power surge has no effect on the lab 
    Reply  Sat Jun 23 19:57:22 2012, yuta, Summary, Computers, c1ioo is down 
       Reply  Mon Jun 25 10:35:59 2012, Jenne, Summary, Computers, c1ioo is down 
          Reply  Mon Jun 25 11:27:13 2012, Jamie, Summary, Computers, c1ioo is down 
    Reply  Mon Jun 25 08:21:40 2012, steve, Update, General, AC power disturbance on Sat powerdisturbed.png
Entry  Mon Jun 11 22:51:11 2012, Jenne, Update, Computers, tdsavg not working 
    Reply  Mon Jun 25 11:23:14 2012, Jenne, Update, Computers, tdsavg not working 
Entry  Fri Jun 22 20:58:15 2012, Jenne, Update, Green Locking, Calibrated POX spectra - Xarm stabilized by ALS POX11_I_ERR_calib_residualCavityMotion_better.pdf
Entry  Fri Jun 22 20:00:14 2012, Jamie, Omnistructure, Electronics, two RG-405 cables ran from 1X2 rack to control room 
Entry  Fri Jun 22 19:52:47 2012, Jamie, Update, Computers, ottavia reconfigured as CDS workstation workstation-setup.sh
Entry  Fri Jun 22 17:51:04 2012, Jenne, Update, Cameras, Green Trans camera repositioning attempt 
Entry  Fri Jun 22 13:37:17 2012, Jenne, Update, Computers, fb lost connection 
Entry  Fri Jun 22 02:21:57 2012, Jenne, Update, Green Locking, 2 arm ALS - Success!!!! P6210140.AVIspeedy_gonzales-5257.jpg
    Reply  Fri Jun 22 03:37:42 2012, Koji, Update, Green Locking, 2 arm ALS - Success!!!! 
       Reply  Fri Jun 22 10:52:18 2012, yuta, Update, Green Locking, 2 arm ALS - Success!!!! 
Entry  Thu Jun 21 20:07:18 2012, Jamie, Update, Green Locking, Improved beatbox returns 
Entry  Thu Jun 21 15:36:51 2012, yuta, Update, Locking, X arm alignment 
Entry  Thu Jun 21 15:00:55 2012, steve, Update, SAFETY, SURFs 2012 safety training surfs2012.JPG
Entry  Tue May 29 14:58:28 2012, Jenne, Update, Locking, ETMX trans camera 
    Reply  Tue May 29 15:49:02 2012, Koji, Update, Locking, ETMX trans camera 
       Reply  Thu May 31 11:02:14 2012, steve, Update, Locking, ETMX 1064 trans camera 
          Reply  Wed Jun 20 16:37:11 2012, yuta, Update, Locking, ETMX 1064 trans camera 
             Reply  Thu Jun 21 12:56:49 2012, yuta, Update, Locking, ETMX 1064 trans camera Xarm_EndTableLayout_NewTransCamera.png
ELOG V3.1.3-