40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 78 of 354
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17691 Entries
Goto page
Previous
1
,
2
,
3
...
77
, 78,
79
...
352
,
353
,
354
Next
Thu May 4 17:14:15 2023, Paco, Summary, LSC, PRMI (MICH and PRCL) calibrated displacement and BS angle to MICH couplings
Mon May 15 18:34:05 2023, Paco, Summary, LSC, Locked PRMI in carrier and LO phase with BH44 and achieved handoff to BHDC_DIFF
Wed May 24 11:50:34 2023, JC, Summary, SEI, STACIS
Thu May 25 13:38:28 2023, advait, Summary, PEM, Existing temperature control hardware
Fri May 26 11:16:46 2023, Anchal, Summary, PEM, Temperature sensing circuit with AD590
Wed Jun 7 17:05:36 2023, yuta, Summary, LSC, RF FPMI recovered after c1sus DAC card replacement
Wed Jun 21 21:01:59 2023, Koji, Summary, DAQ, NODUS: rsyncd daemon / service set up
Thu Jun 22 16:01:54 2023, rana, Summary, DAQ, NODUS: rsyncd daemon / service set up
Tue Jun 27 19:19:17 2023, Koji, Summary, General, 5ft x 12 ft x 2ft optical table removal
8x
Thu Jun 29 01:52:26 2023, Koji, Summary, General, IFO back in operation
Fri Jul 7 17:29:16 2023, yuta, Summary, ASC, IFO alignment is in a strange state
Fri Jul 7 20:09:53 2023, Koji, Summary, ASC, IFO alignment is in a strange state
Fri Jul 7 20:34:43 2023, Hiroki, Summary, BHD, BHD alignment has been restored
Mon Jul 10 15:22:25 2023, yuta, Summary, ASC, IFO alignment is in a strange state
Tue Jul 11 08:00:16 2023, JC, Summary, Daily Progress, Preparing a clean room.
Thu Jul 13 06:18:37 2023, Hiroki, Summary, Calibration, Calibrations of actuators and optical gain
7x
Mon Jul 24 23:01:10 2023, Koji, Summary, CDS, FIXED: rossa can't boot
Thu Jul 27 17:03:57 2023, Koji, Summary, CDS, c1psl spare channel situation
Tue Aug 1 02:51:46 2023, Hiroki, Summary, BHD, Mode-matching breadboard for BHD OMCs
Tue Aug 1 20:29:12 2023, Hiroki, Summary, General, ADC/DAC Noise of Moku:GO [Reprinted elog from Ando Lab at University of Tokyo]
Wed Aug 2 17:56:25 2023, Radhika, Summary, General, ADC/DAC Noise of Moku:GO [Reprinted elog from Ando Lab at University of Tokyo]
Fri Aug 4 20:50:13 2023, Koji, Summary, CDS, The location where the wiper script is running
Thu Aug 10 19:52:47 2023, yuta, Summary, ALS, simultaneous hold and release of the arm (aka two arm ALS)
Wed Aug 16 16:42:22 2023, Radhika, Summary, General, Moku Go/Pro delay measurements
Thu Aug 17 15:24:46 2023, JC, Summary, Daily Progress, Preparing a clean room.
Tue Aug 22 16:44:08 2023, Radhika, Summary, General, Moku Go/Pro delay measurements
Thu Aug 24 13:10:17 2023, Murtaza, Summary, SUS, ETMX Testing
Tue Sep 5 04:48:20 2023, Hiroki, Summary, General, Summary of the late submitted entries
Tue Sep 5 18:46:08 2023, Koji, Summary, General, Dsub 9 (DB9) cable inventory
Thu Sep 7 14:09:37 2023, Koji, Summary, Electronics, Vertex Electronics Transition
Tue Sep 12 18:55:55 2023, Koji, Summary, Electronics, Vertex Electronics Transition
Tue Sep 12 23:10:06 2023, Koji, Summary, Electronics, Vertex Electronics Transition
Wed Sep 13 12:46:03 2023, Koji, Summary, Electronics, Vertex Electronics Transition ~ final prep
Wed Sep 13 13:50:48 2023, Radhika, Summary, Electronics, Vertex Electronics Transition ~ final prep
Wed Sep 13 14:02:29 2023, Koji, Summary, Electronics, Vertex Electronics Transition ~ final prep
Wed Sep 13 17:26:26 2023, Koji, Summary, Electronics, Vertex Electronics Transition ~ DAY 1
Thu Sep 14 11:46:28 2023, Koji, Summary, Electronics, Vertex Electronics Transition ~ DAY 2
Fri Sep 15 12:51:29 2023, Koji, Summary, Electronics, Vertex Electronics Transition ~ DAY 3
Fri Sep 15 22:57:15 2023, Koji, Summary, Electronics, c1sus ADC1 AA chassis fix
Mon Sep 18 10:26:12 2023, Koji, Summary, Electronics, Vertex Electronics Transition ~ DAY 4
Mon Sep 18 18:38:02 2023, Radhika, Summary, Electronics, Vertex Electronics Transition ~ DAY 4
Mon Sep 18 20:16:03 2023, Koji, Summary, Electronics, Vertex Electronics Transition ~ DAY 4
Mon Sep 18 23:09:40 2023, Koji, Summary, Electronics, Vertex Electronics Transition ~ DAY 4
Tue Sep 19 17:25:38 2023, Radhika, Summary, Electronics, Vertex Electronics Transition ~ DAY 5
Tue Sep 19 19:21:10 2023, Radhika, Summary, Electronics, Vertex Electronics Transition ~ DAY 5
Tue Sep 19 19:48:20 2023, Koji, Summary, Electronics, Vertex Electronics Trouble shooting
Tue Sep 19 20:49:08 2023, Koji, Summary, Electronics, Vertex Electronics Trouble shooting
Tue Sep 19 23:40:33 2023, Koji, Summary, Electronics, Vertex Electronics Wed Plan
Wed Sep 20 00:03:22 2023, Koji, Summary, Electronics, re: Filter Coefficient Loading Issue
Wed Sep 20 00:20:09 2023, Koji, Summary, Electronics, Vertex Electronics ~ change in the actuator calibration
Goto page
Previous
1
,
2
,
3
...
77
, 78,
79
...
352
,
353
,
354
Next
ELOG V3.1.3-