40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 72 of 346  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  13830   Thu May 10 11:38:19 2018 gautamUpdateGeneralITMY ULLooking at Steve's plot, I was reminded
of the ITMY UL OSEM issue. The numbers don't
make sense to me though - 300um of DC shift
 ITMY_UL.pdf 
  13829   Thu May 10 08:45:16 2018 SteveUpdateGeneral4.5M eq. Cabazon, CA20180508 4:49am Cabazon earth quake 4.5M
at 79 miles away.  ETMX is in load cell
measurment condition.
 Cabazon4.5m79m.png4.5Meq.png 
  13828   Wed May 9 19:51:07 2018 gautamUpdateGeneralInput beam misalignedAs
suspected - the problem was with the TTs.
 DACweirdness.pngDACerror.png 
  13827   Wed May 9 17:30:04 2018 gautamUpdateGeneralInput beam misalignedThere is
no beam going into the IFO at the moment.
 InputBeamGone.pngTTpointing.png 
  13826   Tue May 8 11:41:16 2018 gautamUpdateGeneralIFO maintenanceThere was an earthquake, all watchdogs
were tripped, ITMX was stuck, and c1psl was
dead so MCautolocker was stuck.
 ITMX_stuck.png 
  13825   Tue May 8 10:24:10 2018 KiraSummaryPEMplan for this weekHere are a few things I will be working
on:


Design PCB boards for the
  
  13824   Tue May 8 00:40:51 2018 gautamConfigurationALSBeathMouth pulled out of PSL tableSummary:

I did some more BeatMouth characterization.
My primary objective was to do a power budget.
 IMG_6986.JPGIMG_6987.JPG 
  13823   Mon May 7 20:01:14 2018 RorpheusUpdateGeneralUse anti-dewhitening + show CARMA/DARMA    
  13822   Mon May 7 16:23:06 2018 gautamUpdateGeneralDARM actuation estimateSummary:

Using the Wiener Filter estimate
of the DARM disturbance we will have to cancel,
 darmProj.pdf37.pngMCalign_20180507.png 
  13821   Mon May 7 15:27:28 2018 gautamUpdateSUSStack measurement expectation[steve,gautam]

We tried to estimate what the load
cell measurement should yield. Here is the
 40m_TMstack.JPG 
  13820   Mon May 7 11:46:07 2018 gautamUpdatePEMFW parameter updateAs part of investigation into this issue,
Jonathan Hanks pointed out that the "minute
trends" being recorded by our system
 FWreboot.png 
  13819   Sat May 5 22:32:07 2018 KojiUpdatePSLModulation depth measurement for the 3IFO aLIGO EOM The 3IFO EOM was formerly tuned as the
H2 EOM, so the resonant frequencies are different
from the nominal aLIGO ones.
  
  13818   Sat May 5 20:30:21 2018 KojiUpdatePSLModulation depth measurement for the 3IFO aLIGO EOM and aftermathCaution:
Because of this work and my negligence, the
RF output of the main Marconi for the IFO
  
  13817   Fri May 4 21:17:57 2018 gautamConfigurationALSBeathMouth pulled out of PSL tableI have been puzzled about the beat note
level we get out of the BeatMouth for some
time.
  
  13816   Fri May 4 19:06:28 2018 ranaConfigurationElectronicsAUX-PSL PLL Implementation & Characterizationthis doesn't make much sense to me;
the phase to frequency conversion (mixer-demod
to PZT ) should give us a 1/f loop as Johannes
  
  13815   Fri May 4 18:59:39 2018 gautamUpdateSUSStack measurement ongoing[SV,KA,RXA,GV]

The
  
  13814   Fri May 4 13:24:56 2018 Jon RichardsonConfigurationElectronicsAUX-PSL PLL Implementation & CharacterizationAttached are final details of the phase-locked
loop (PLL) implementation we'll
use for slaving the AUX 700 mW NPRO laser
 PLL_Schematic.pdfPLL_AUX-PSL_40m.pdf 
  13813   Thu May 3 20:29:39 2018 gautamConfigurationElectronicsPSL-Aux. Laser Phase-Locked LoopSome notes about the setup and work at
the PSL table today, Jon can add to / correct
me.
  
  13812   Thu May 3 12:19:13 2018 gautamUpdateCDSslow machine bootfestReboot for c1susaux
and 
  
  13811   Thu May 3 12:10:12 2018 gautamConfigurationGeneralAS port laser injectionI think we need AS55 for locking the configuration
Jon suggested - AS55 I and Q were used to
lock the SRMI previously, and so I'd
  
  13810   Thu May 3 10:40:43 2018 johannesConfigurationGeneralAS port laser injectionInstead of trying to couple the fiber output
into the interferometer, I'm doing the
reverse and maximize the amount of interferometer
 mm_solution_AStable.pngAStable_beampath.pdf 
  13809   Thu May 3 09:56:42 2018 SteveHowToSEIpreparation of load cell measurement at ETMX[ Dennis Coyne'  precision answer
]

  
  13808   Thu May 3 00:42:38 2018 KevinUpdatePonderSqueezeCoil driver contribution to squeezing noise budgetIn light of the discussion at today's
meeting, Guantanamo and I looked at how the
series resistance for the test mass coil
  
  13807   Wed May 2 21:39:33 2018 gautamConfigurationALSIR ALS for EYThe new K6XS mounts I ordered have arrived.
I want to install one of them at the Y-end.
I can't find a picture of the current
  
  13806   Wed May 2 10:03:58 2018 SteveHowToSEIpreparation of load cell measurement at ETMXGautam and Steve,

We have calibrated the load 
cells. The support beams height monitoring
 6x 
  13805   Tue May 1 19:37:50 2018 gautamUpdateGeneralDARM actuation estimateHere is an updated plot - the main difference
is that I have added a trace that is the
frequency domain wiener filter subtraction
 darmEst.pdfdarmEst_time.pdf 
  13804   Tue May 1 15:23:18 2018 KiraUpdatePEMnew ADC channel setup issue[Kira, Johannes]

I connected up the channels for
the ADC Acromag a while back and we were
 IMG_20180501_152014.jpg 
  13803   Tue May 1 11:15:19 2018 KiraUpdatePEMPID QuixoteI added an out of loop sensor to the can
by placing the lab temperature sensor inside
the can. I'm not sure which channel is
 IMG_20180501_154826.jpg 
  13802   Tue May 1 08:04:13 2018 Jon RichardsonConfigurationElectronicsPSL-Aux. Laser Phase-Locked Loop[Jon, Gautam, Johannes]

Summary: In
support of making a proof-of-concept RF measurement
 IMG_2553.jpgIMG_2551.jpgIMG_2552.jpgsrc_gouy_phase_v3.pdf 
  13801   Mon Apr 30 23:13:12 2018 KevinUpdateComputer Scripts / ProgramsDataViewer leapsecondsI was trying to plot trends (min, 10 min,
and hour) in DataViewer and got the following
error message
  
  13800   Mon Apr 30 15:36:18 2018 KiraUpdatePEMfinal setup sketchI've attached a sketch of how the panel
will be mounted. We should make a small rectangular
box that would raise the panel from the block
 mount.png 
  13799   Sun Apr 29 22:53:06 2018 gautamUpdateGeneralDARM actuation estimateMotivation:

We'd like to know how much
actuation is required on the ETMs to lock
 darmEst.pdf 
  13798   Fri Apr 27 18:42:02 2018 ranaUpdatePEMnew Seis temp chansfor whatever reason, I am unable to get
minute or second trends from nodus for any
channels (IMC, PEM, etc) since the reboot.
  
  13797   Fri Apr 27 16:55:31 2018 gautamUpdateGeneralEY area access blockedSteve was calibrating the load cells at
the EY table with the crane - we didn't
get through the full procedure today, so
  
  13796   Fri Apr 27 01:36:02 2018 gautamConfigurationALSIR ALS noise performanceSummary:

My goal was to do some further
characterization of the IR ALS system tonight.
 2018_04_BeatMouth_POX.pdf2018_04_BeatMouth.pdfALSSpecgram.pdfALS_ASD.pdfALSstab.pdf 
  13795   Thu Apr 26 23:00:42 2018 ranaUpdatePEMnew Seis temp chansAfter fixing the spelling of the EX temperature
readback, I also added all of the MEDM sliders
to the C0EDCU.ini file (making sure to add
 chans.pdf 
  13794   Thu Apr 26 20:22:21 2018 KevinUpdatePEMADC common mode rejection with new seismometer connectionsYesterday I wired the outputs from the
seismometers directly to the ADC input bypassing
the old AA board circuit as is described
 setup.pdfseismometerASD.pdf 
  13793   Thu Apr 26 19:46:26 2018 ranaUpdatePEMPID QuixoteIncreased
the Integral gain (from -1 to -4) on the
EX temperature controller. This didn't
 dv.pdf 
  13792   Thu Apr 26 18:58:21 2018 BruceConfigurationALSNew look EX Fiber coupling - pol stability    
  13791   Thu Apr 26 11:24:50 2018 gautamConfigurationALSNew look EX Fiber coupling - pol stabilityHere is a first look at the overnight stability.
For the temperature, I used the calibration
I found in the old psl database file, seems
 polStab.pdf 
  13790   Thu Apr 26 09:35:49 2018 KevinUpdatePEMPEM Anti-Alias wiringI wired all 32 channels going to the AA
board directly to the ADC as described in
the previous
 board.jpgSeismometerPSD.pdf 
  13789   Wed Apr 25 19:09:37 2018 gautamConfigurationALSNew look EX Fiber couplingSummary:

I implemented most of the things
outlined in my previous elog.
 EX_fiber_MM.pdfIMG_6977.JPGIMG_6972.JPGIMG_6974.JPGIMG_6976.JPG 
  13788   Wed Apr 25 17:44:39 2018 ArnoldUpdatePEMPEM Anti-Alias wiring

 
  
  13787   Tue Apr 24 21:19:08 2018 KevinUpdatePEMSeismometer BLRMsIn the ongoing attempt to recover the seismometer
BLRMS, I removed the AA board from the rack
and modified the BS seismometer Z channel.
 modified_schematic.pdftop.jpgbottom.jpgBS_Seis_PSD.pdf 
  13786   Tue Apr 24 18:54:15 2018 gautamConfigurationALSProposed changes to EX fiber couplingI started working on the EX table. Work
is ongoing so I will finish this up later
in the evening, but in case anyone is wondering
  
  13785   Tue Apr 24 15:59:23 2018 SteveUpdateWiki AP table layout 20180328


Quote:


 DSC00668AP20180328.png 
  13784   Tue Apr 24 11:31:59 2018 gautamConfigurationALSProposed changes to EX fiber couplingMotivation:
I want to make another measurement of the
 EX_fiber_MM.pdfEX_fiber_changes.png 
  13783   Tue Apr 24 10:10:43 2018 gautamUpdateComputer Scripts / ProgramsParticle swarm hyper parameter optimizationI'm copying and pasting Nikhil's
email here as he was unable to login to the
elog (but should now be able to in order
 ClusterFminScaled.pngClusterID_5.png 
  13782   Tue Apr 24 09:10:20 2018 KiraUpdatePEMfinal setup sketchI've attached the final sketch for
the panel on the granite block.
 EX-can-panel_1.pdf 
  13781   Tue Apr 24 08:36:47 2018 johannesConfigurationGeneralAux Laser LD dying? (AS port laser injection)In September
2017 I measured ~150mW output power,
which was already kind of low. What are the
  
ELOG V3.1.3-