Fri Sep 7 00:08:10 2012, janosch, Metaphysics, , baffle clipping loss
|
Thu Sep 6 18:49:30 2012, Jenne, Update, RF System, AS 55 may be broken
|
Thu Sep 6 19:36:19 2012, Jenne, Update, RF System, AS 55 is fine
|
Thu Sep 6 17:11:40 2012, janosch, Manasa, Steve, Update, , pick-off and baffle at ETMY
|
Thu Sep 6 17:06:25 2012, Rijuparna Chakraborty, Configuration, elog, Cavitymode scan   
|
Thu Sep 6 16:46:44 2012, Jenne, Update, SUS, BS aligned, target removed
|
Thu Sep 6 13:07:02 2012, Jenne, Update, IOO, IPANG no longer a reference :(
|
Wed Sep 5 19:29:45 2012, Jenne, Update, General, Yarm aligned to IR incident beam
|
Thu Sep 6 02:51:47 2012, Koji, Update, General, Green beam roughtly aligned (Re: Yarm aligned to IR incident beam)
|
Thu Sep 6 10:57:27 2012, Jenne, Update, General, Forgot to turn green refl pd back on
|
Tue Sep 4 20:03:38 2012, Jenne, Update, General, in-vac progress
|
Tue Sep 4 20:20:47 2012, jamie, Update, General, problematic tip-tilts
|
Tue Sep 4 13:31:55 2012, Jenne, Update, General, The Plan
|
Tue Sep 4 13:44:17 2012, Manasa, Update, General, The Plan
|
Tue Sep 4 20:13:46 2012, Jenne, Update, General, The Plan - Tues evening version
|
Tue Sep 4 20:06:04 2012, Jenne, Update, Locking, MC scan input switched to the 11MHz port of EOM
|
Tue Sep 4 13:50:26 2012, ericq, Update, PSL, PMC Realigned, power adjusted
|
Tue Sep 4 11:32:58 2012, Jenne, Update, Locking, Friday in-vac work
|
Tue Sep 4 10:29:41 2012, Steve, Update, SUS, PRM damping restored
|
Fri Aug 31 13:22:29 2012, Elli, Update, IOO, Correcting improper termination of the 55MHz input to the EOM
|
Fri Aug 31 18:32:47 2012, Koji, Update, IOO, Correcting improper termination of the 55MHz input to the EOM
|
Fri Aug 31 17:50:41 2012, Steve, Update, SUS, SOS centering target
|
Tue Aug 28 18:28:21 2012, janosch, Metaphysics, Ringdown, ripples
|
Tue Aug 28 19:06:32 2012, Koji, Metaphysics, Ringdown, ripples
|
Tue Aug 28 19:21:37 2012, janosch, Metaphysics, Ringdown, ripples
|
Tue Aug 28 20:23:54 2012, Koji, Metaphysics, Ringdown, ripples
|
Wed Aug 29 09:35:03 2012, janosch, Metaphysics, Ringdown, ripples 2
|
Fri Aug 31 17:44:21 2012, Manasa, Update, Ringdown, Data
|
Fri Aug 31 17:26:54 2012, Steve, Update, General, BS camera
|
Thu Aug 30 19:08:08 2012, Jenne, Update, VAC, Dogs on BS, ITM chambers checked
|
Fri Aug 31 10:24:36 2012, Steve, Update, VAC, chamber dog clamps checked
|
Thu Aug 30 20:35:09 2012, jamie, Update, SUS, target installed on PRM, temporary earthquake stops in place
|
Fri Aug 31 07:32:49 2012, Steve, Update, SUS, target for BS
|
Thu Aug 30 20:31:35 2012, Jenne, Update, IOO, PZT1 and PZT2 set to center of their ranges
|
Thu Aug 30 20:20:52 2012, Jenne, Update, SUS, Watek camera placed on SE viewport of ITMX to look at PRM
|
Thu Aug 30 18:01:05 2012, Elli, Update, IOO, Setting up Input MC cavity scan measurement
|
Thu Aug 30 17:03:32 2012, janosch, Manasa, Steve, Update, , ETMX
|
Thu Aug 30 12:01:27 2012, janosch, Manasa,Steve, Update, , ETMX
|
Thu Aug 30 13:10:41 2012, jamie, Update, Cameras, ETMX
|
Wed Aug 29 17:09:57 2012, jamie, Update, SUS, ETMX OK, free swinging
|
Thu Aug 30 08:37:11 2012, Steve, Update, SUS, ETMX and ITMX needs more attention 
|
Wed Aug 29 21:02:45 2012, Jenne, Update, IOO, Optics between Faraday and PRM are centered, realigned
|
Thu Aug 30 00:08:34 2012, jamie, Update, General, In vac plans for tomorrow, 8/30
|
Thu Aug 30 08:12:39 2012, Steve, Update, General, In vac plans for tomorrow, 8/30
|
Wed Aug 29 19:28:41 2012, Elli King, Update, LSC, Setup for a cavity scan or the input mode cleaner
|
Wed Aug 29 20:43:23 2012, Koji, Update, IOO, Setup for a cavity scan or the input mode cleaner
|
Tue Aug 28 16:27:22 2012, ericq, Update, PSL, PBS and Half Wave plates introduced
|
Tue Aug 28 17:16:54 2012, ericq, Update, PSL, Power reduced!
|
Tue Aug 28 17:43:04 2012, Jenne, Update, PSL, Power reduced!
|
Wed Aug 29 17:02:41 2012, ericq, Update, PSL, Power reduced!
|
Wed Aug 29 17:35:34 2012, Koji, Update, PSL, Power reduced!
|
Tue Aug 28 17:51:39 2012, Jenne, Update, PSL, PBS and Half Wave plates introduced
|
Wed Aug 29 11:47:21 2012, ericq, Update, VAC, Venting
|
Wed Aug 29 12:46:49 2012, Steve, Update, VAC, Vent completed in 4 hrs  
|
Tue Aug 28 17:59:03 2012, Jenne, Update, VAC, VENT: GO!
|
Tue Aug 28 17:02:16 2012, jamie, Update, General, svn commit changes
|
Fri Aug 24 20:48:10 2012, Koji, Update, PSL, PMC aligned
|
Tue Aug 28 00:23:54 2012, Jenne, Update, PSL, PMC alignment going bad
|
Tue Aug 28 11:28:31 2012, ericq, Update, PSL, PMC alignment going bad
|
Tue Aug 28 09:37:33 2012, Steve, Update, VAC, RGA scan at day 56 
|
Tue Aug 28 00:16:19 2012, jamie, Update, General, Alignment and vent prep
|
Fri Aug 24 22:01:15 2012, Jenne, Update, IOO, MC spot position - close
|
Sun Aug 26 12:26:44 2012, Jenne, Update, IOO, MC spot position - not done yet
|
Mon Aug 27 01:05:36 2012, Jenne, Update, IOO, MC spot position - callin' it quits
|
Mon Aug 27 12:03:54 2012, Koji, Update, IOO, MC spot position - callin' it quits
|
Mon Aug 27 18:32:48 2012, Jenne, Update, IOO, MC spot position - Jenne is stupid
|
Mon Aug 27 18:59:24 2012, jamie, Update, IOO, MC ASC screen was confusing - Jenne is not stupid 
|
Mon Aug 27 23:52:59 2012, Jenne, Update, IOO, MC Spots centered
|
Sun Aug 26 21:47:50 2012, Koji, Update, CDS, C1LSC ooze
|
Mon Aug 27 17:14:00 2012, jamie, Update, CDS, c1oaf problem
|
Mon Aug 27 09:24:17 2012, Steve, Update, SUS, EQ damage
|
Mon Aug 27 10:49:03 2012, Koji, Update, SUS, EQ damage
|
Mon Aug 27 15:49:46 2012, Jenne, Update, SUS, EQ damage
|
Mon Aug 27 15:46:55 2012, Steve, Update, SAFETY, safety training
|
Mon Aug 27 08:34:18 2012, Steve, Update, PEM, earthquakes  
|
Sun Aug 26 20:58:21 2012, Jenne, Update, VAC, Don't vent!!!!
|
Thu Aug 23 22:21:13 2012, rana, Configuration, IOO, MCL turned back on 
|
Fri Aug 24 09:21:45 2012, Steve, Update, IOO, MC2 damping restored
|
Sun Aug 26 11:53:09 2012, Jenne, Update, IOO, MC2 getting kicked up regularly
|
Fri Aug 24 21:00:40 2012, Koji, Update, LSC, X end green investigation
|
Fri Aug 24 16:03:39 2012, Steve, Update, VAC, Vacuum related work at atm  
|
Wed Aug 22 15:47:34 2012, jamie, Summary, General, vent prepartion for fast-track vent
|
Thu Aug 23 10:38:12 2012, Steve, Update, General, vent prepartion for fast-track vent
|
Fri Aug 24 14:46:08 2012, Jenne, Summary, General, Detailed alignment plan
|
Fri Aug 24 13:22:19 2012, Den, Update, Modern Control, cavity simulation   
|
Fri Aug 24 11:46:59 2012, Masha, Update, PEM, New classification weights
|
Fri Aug 24 00:23:20 2012, Den, Update, Modern Control, feedback using LQG method 
|
Thu Aug 23 21:53:06 2012, Jenne, Update, Green Locking, Xgreen still wouldn't lock
|
Thu Aug 23 22:54:32 2012, Jenne, Update, Green Locking, Xgreen still wouldn't lock
|
Thu Aug 23 22:44:32 2012, Koji, Update, PSL, FSS Slow DC servo is turned off (not temporary)
|
Thu Aug 23 22:41:04 2012, Koji, Update, IOO, MC Autolocker update
|
|