40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 6 of 344  Not logged in ELOG logo
Entry  Mon Feb 2 12:35:22 2009, Alberto, Configuration, General, New Elog 2.7.5 in Service on Nodus 
Entry  Mon Feb 2 17:25:44 2009, Alberto, Configuration, General, Some little problem with the new elog 
    Reply  Mon Feb 2 18:32:54 2009, Alberto, Configuration, General, Some little problem with the new elog 
    Reply  Mon Feb 2 18:51:02 2009, Alberto, Configuration, General, New Elog 2.7.5 in Service on Nodus 
Entry  Tue Feb 3 15:01:38 2009, Alberto, Frogs, Computers, megatron slow? 
    Reply  Mon Feb 16 10:18:13 2009, Alberto, Update, LSC, FE system rebooted 
Entry  Mon Mar 2 16:27:40 2009, Alberto, Configuration, Electronics, MC Drum Mode SR560 Preamplifier Replaced 
Entry  Tue Mar 3 10:39:07 2009, Alberto, Update, LSC, c1lsc discontinued functioning 
Entry  Wed Mar 4 12:38:07 2009, Alberto, Update, Computer Scripts / Programs, 3f locking simulations 23_3f_40mOld_DDplots.pdf59_3f40m_Upgrade_DDplots.pdf20_3f_AdvL_DDplots.pdf
    Reply  Mon Mar 9 11:09:33 2009, Alberto, Update, Computers, Re: Not even data retrieval working 
Entry  Mon Mar 9 17:11:38 2009, Alberto, Configuration, oplevs, optical levers centering 
Entry  Tue Mar 24 13:10:07 2009, Alberto, Configuration, PSL, new mirror installed on the AP table 
Entry  Mon Apr 13 18:57:03 2009, Alberto, Frogs, Computers, GPIB/ETH Interface Troubles sweepfrequencyPRC.pyHP8590PRC.py
    Reply  Tue Apr 14 12:10:11 2009, Alberto, Frogs, Computers, GPIB/ETH Interface Troubles 
Entry  Thu Apr 16 16:37:42 2009, Alberto, Update, Auxiliary locking, the zipper  19_3f_Current_40m_plots_SUCCESS.pdf
    Reply  Thu Apr 16 17:19:44 2009, Alberto, Update, Auxiliary locking, the zipper  04_3f_Current_40m_plots.pdf11_3f_40mUpgrade_plots.pdf
Entry  Fri May 1 18:24:36 2009, Alberto, Summary, General, jitter of REFL beam ? 
Entry  Fri May 1 18:51:34 2009, Alberto, Summary, Environment, earthquake 
    Reply  Mon May 4 16:49:56 2009, Alberto, Update, MOPA, laser power is dropped 
Entry  Thu May 7 17:59:23 2009, Alberto, Configuration, , MC WFS 
Entry  Mon Jun 1 13:56:52 2009, Alberto, Update, PSL, Laser Power after fixing the laser chiller MOPAtrend.jpg
Entry  Tue Jun 2 23:55:45 2009, Alberto, Update, oplevs, oplevs centerd 
Entry  Mon Jun 8 18:22:27 2009, Alberto, DAQ, LSC, Added PD11 I amd Q slow channels 
Entry  Wed Jun 10 01:52:34 2009, Alberto, Update, Electronics, MC length and Marconis' frequencies 
Entry  Thu Jun 11 03:15:15 2009, Alberto, Update, LSC, DD Handoff attempts 
Entry  Thu Jun 11 22:14:10 2009, Alberto, Update, LSC, DD Handoff for the Short DOFs completed 
Entry  Tue Jun 16 20:03:41 2009, Alberto, Update, Electronics, Requirements on Wenzel Multiplier SummaryOfResult.pdf
Entry  Fri Jun 19 13:38:42 2009, Alberto, Configuration, Computers, elog rebooted 
    Reply  Fri Jun 19 14:30:47 2009, Alberto, Configuration, Computers, elog rebooted 
Entry  Tue Jun 30 23:09:40 2009, Alberto, Update, Locking, chronicles of some locking attempts 
Entry  Wed Jul 8 11:13:36 2009, Alberto, Omnistructure, Computers, wireless router disconnected 
Entry  Wed Jul 8 19:13:19 2009, Alberto, Update, PSL, PSL beam aligned to the Mode Cleaner 
    Reply  Mon Jul 13 00:34:37 2009, Alberto, DAQ, Computers, All computers down 
    Reply  Mon Jul 13 00:53:50 2009, Alberto, DAQ, Computers, All computers down 
Entry  Mon Jul 13 15:14:57 2009, Alberto, Update, Computers, DAQAWG 
Entry  Tue Jul 14 00:57:11 2009, Alberto, Update, Locking, photodiode alignment check 
    Reply  Wed Jul 15 12:14:08 2009, Alberto, Update, Locking, photodiode alignment check 2009-07-15_PD9spectrumPDF.pdf
    Reply  Thu Jul 16 01:00:56 2009, Alberto, Update, Locking, PD9 aligned 2009-07-15_PD9spectrumPDF02.pdf
    Reply  Wed Jul 22 01:57:19 2009, Alberto, Configuration, Computers, computers are down 
    Reply  Wed Jul 22 09:04:10 2009, Alberto, Configuration, Computers, computers are down 
Entry  Wed Jul 22 10:49:40 2009, Alberto, Update, PSL, MC Alignment Trend 2009-07-21_MC-align-trend.pdf2009-07-22_mc-align-trend.pdf
    Reply  Wed Jul 22 11:14:11 2009, Alberto, Configuration, Computers, computers are down 
Entry  Thu Jul 23 10:05:38 2009, Alberto, Update, PSL, Summary of the latest adventures with the alignment of the mode cleaner 
Entry  Thu Jul 23 20:30:23 2009, Alberto, Update, PSL, Beam aligned to the Farady 
Entry  Fri Jul 24 11:04:11 2009, Alberto, Configuration, Computers, elog restarted 
Entry  Fri Jul 24 21:02:46 2009, Alberto, Update, PSL, Aligning the beam to the Faraday 
    Reply  Sun Jul 26 16:05:17 2009, Alberto, Update, PSL, Aligning the mode cleaner 
Entry  Wed Jul 29 11:58:57 2009, Alberto, Update, PSL, MC not locking 
Entry  Mon Aug 3 01:08:20 2009, Alberto, Update, PSL, MC unlocked 
    Reply  Mon Aug 3 12:57:09 2009, Alberto, Update, PSL, MC unlocked 
ELOG V3.1.3-