ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
1194
|
Fri Dec 19 11:18:52 2008 |
Alberto | Configuration | General | Mode Cleaner Temperature Monitor | I reduced from 10 to 5 the gain of the SR560
that Caryn has set up after the lock-in amplifier
nest to the PSL rack because the overload |
|
1244
|
Thu Jan 22 11:54:09 2009 |
Alberto | Configuration | PSL | Mach Zehnder Output Beam QPD | I rotated by 180 degrees the 10% beam splitter
that it is used to fold the beam coming from
the Mach Zehnder (directed to the MC) on |
|
1252
|
Sat Jan 24 11:50:24 2009 |
Alberto | Configuration | Electronics | Photodiode Filters' Transfer Functions | I found an elog entry by Jenne with the measurement
of the transfer functions of the filters
of some of our photodetectors. Since it might |
|
1263
|
Mon Feb 2 12:35:22 2009 |
Alberto | Configuration | General | New Elog 2.7.5 in Service on Nodus | I moved the 40m, the Adhikari Lab and the
SUS elogs from Dziban (located in Millikan's
6th floor) to our gateway server Nodus. In |
|
1264
|
Mon Feb 2 17:25:44 2009 |
Alberto | Configuration | General | Some little problem with the new elog | For some reason the new elog does not look
exactly like it should.
1) Some of the
editing features are not available.
2) |
|
1265
|
Mon Feb 2 18:32:54 2009 |
Alberto | Configuration | General | Some little problem with the new elog |
|
|
1266
|
Mon Feb 2 18:51:02 2009 |
Alberto | Configuration | General | New Elog 2.7.5 in Service on Nodus |
|
|
1268
|
Tue Feb 3 15:01:38 2009 |
Alberto | Frogs | Computers | megatron slow? | I notice that Megatron is slower than any
other computer in running code that invokes
optickle or looptickle (i.e. three times |
|
1308
|
Mon Feb 16 10:18:13 2009 |
Alberto | Update | LSC | FE system rebooted | [quote][quote]
I didn't get a chance to do much testing
since the sus controller (susvme1) went nuts. |
|
1345
|
Mon Mar 2 16:27:40 2009 |
Alberto | Configuration | Electronics | MC Drum Mode SR560 Preamplifier Replaced | Today I checked out the SR560 around the
lab. I confirmed that the one with the label
"channel A noisy" is effectively |
|
1348
|
Tue Mar 3 10:39:07 2009 |
Alberto | Update | LSC | c1lsc discontinued functioning | The c1lsc has been unstable since last
night. Its status on the DAQ screen was oscillating
from green to red every minute. |
|
1354
|
Wed Mar 4 12:38:07 2009 |
Alberto | Update | Computer Scripts / Programs | 3f locking simulations | I simulated the REFL signals demodulated
at the differential frequencies of the sidebands
(f2-f1), at their summed frequencies (f2+f1). |
  |
1373
|
Mon Mar 9 11:09:33 2009 |
Alberto | Update | Computers | Re: Not even data retrieval working | [quote]Although getting the regular DAQ data
works, we can't get any testpoints.
|
|
1377
|
Mon Mar 9 17:11:38 2009 |
Alberto | Configuration | oplevs | optical levers centering | Yoichi, Alberto
this afternoon we centered the optical
levers for all the optics. |
|
1421
|
Tue Mar 24 13:10:07 2009 |
Alberto | Configuration | PSL | new mirror installed on the AP table | New flipping mirror installed on the AP
table on the beam path to the REFL199 PD.
If you're missing the double demod |
|
1479
|
Mon Apr 13 18:57:03 2009 |
Alberto | Frogs | Computers | GPIB/ETH Interface Troubles | I really don't understand why my programs
that I used to use to get data from the HP
Spectrum Analyzer and the Marconi frequency |
 |
1481
|
Tue Apr 14 12:10:11 2009 |
Alberto | Frogs | Computers | GPIB/ETH Interface Troubles |
|
|
1490
|
Thu Apr 16 16:37:42 2009 |
Alberto | Update | Auxiliary locking | the zipper | It takes 18 months to double the computational
power of microprocessors but it took man
thousands of years to invent the zipper. |
|
1491
|
Thu Apr 16 17:19:44 2009 |
Alberto | Update | Auxiliary locking | the zipper |
|
 |
1538
|
Fri May 1 18:24:36 2009 |
Alberto | Summary | General | jitter of REFL beam ? | Some loud thinking.
For
the measurement of the length of the PRC,
I installed a fast photodiode in the path |
|
1539
|
Fri May 1 18:51:34 2009 |
Alberto | Summary | Environment | earthquake | Earthquake 4.4 Leo Carrillo Beach.
Some of the watchdogs tripped out. |
|
1543
|
Mon May 4 16:49:56 2009 |
Alberto | Update | MOPA | laser power is dropped |
|
|
1556
|
Thu May 7 17:59:23 2009 |
Alberto | Configuration | | MC WFS | This afternoon the MC could not get locked.
I
first checked the Osems values at the MC
mirrors and compared them to the trend of |
|
1636
|
Mon Jun 1 13:56:52 2009 |
Alberto | Update | PSL | Laser Power after fixing the laser chiller | The laser power seems to have become more
stable after fixing the laser chiller. The
power is lower than it used to be (MOPA amplitude |
|
1644
|
Tue Jun 2 23:55:45 2009 |
Alberto | Update | oplevs | oplevs centerd | Tonight I centered the oplevs for ITMX/Y,
SRM, PRM, BS.
After doing that I noticed that the |
|
1661
|
Mon Jun 8 18:22:27 2009 |
Alberto | DAQ | LSC | Added PD11 I amd Q slow channels | I just added two slow channels to C0EDCUEPICS
to monitor the input of PD11. The names are:
[C1:LSC-PD11_I_INMON] |
|
1664
|
Wed Jun 10 01:52:34 2009 |
Alberto | Update | Electronics | MC length and Marconis' frequencies | Pete, Rob, Alberto,
yesterday we thought that some of
the problems we were having in locking the |
|
1667
|
Thu Jun 11 03:15:15 2009 |
Alberto | Update | LSC | DD Handoff attempts | Pete, Alberto,
tonight we worked on the tuning of
the double demod phases for the handoff of |
|
1669
|
Thu Jun 11 22:14:10 2009 |
Alberto | Update | LSC | DD Handoff for the Short DOFs completed | This afternoon I tuned the handoff script
for the SRC, after that Rob eralier during
the day had already adjusted that for PRC. |
|
1681
|
Tue Jun 16 20:03:41 2009 |
Alberto | Update | Electronics | Requirements on Wenzel Multiplier | For
the 40m Upgrade, we plan to |
|
1686
|
Fri Jun 19 13:38:42 2009 |
Alberto | Configuration | Computers | elog rebooted | Today I found the elog down, so I rebooted
it following the instructions in the wiki. |
|
1688
|
Fri Jun 19 14:30:47 2009 |
Alberto | Configuration | Computers | elog rebooted |
|
|
1709
|
Tue Jun 30 23:09:40 2009 |
Alberto | Update | Locking | chronicles of some locking attempts | Tonight I tried to lock the interferometer.
At the first attempts the arm power didn't
go above about 4. The mode cleaner seemed |
|
1722
|
Wed Jul 8 11:13:36 2009 |
Alberto | Omnistructure | Computers | wireless router disconnected | Once again, this morning I found the wireless
router disconnected from the LAN cable. No
martian WiFi was available. |
|
1725
|
Wed Jul 8 19:13:19 2009 |
Alberto | Update | PSL | PSL beam aligned to the Mode Cleaner | Today I tuned the periscope on the PSL
table to align the beam to the Mode Cleaner.
With the Wave Front Sensor control off, I |
|
1735
|
Mon Jul 13 00:34:37 2009 |
Alberto | DAQ | Computers | All computers down |
|
|
1736
|
Mon Jul 13 00:53:50 2009 |
Alberto | DAQ | Computers | All computers down |
|
|
1737
|
Mon Jul 13 15:14:57 2009 |
Alberto | Update | Computers | DAQAWG | Today Alex came over, performed his magic
rituals on the DAQAWG computer and fixed
it. Now it's up and running again. |
|
1742
|
Tue Jul 14 00:57:11 2009 |
Alberto | Update | Locking | photodiode alignment check | Since lately the alignment of the input
beam to the interferometer has changed, I
went checking the alignment of the beam on |
|
1749
|
Wed Jul 15 12:14:08 2009 |
Alberto | Update | Locking | photodiode alignment check |
|
|
1755
|
Thu Jul 16 01:00:56 2009 |
Alberto | Update | Locking | PD9 aligned |
|
|
1772
|
Wed Jul 22 01:57:19 2009 |
Alberto | Configuration | Computers | computers are down |
|
|
1773
|
Wed Jul 22 09:04:10 2009 |
Alberto | Configuration | Computers | computers are down |
|
|
1774
|
Wed Jul 22 10:49:40 2009 |
Alberto | Update | PSL | MC Alignment Trend | Trying to track the MC positions back for
a few days, it seems that the data hasn't
been recorded properly for a while. Something |
 |
1776
|
Wed Jul 22 11:14:11 2009 |
Alberto | Configuration | Computers | computers are down |
|
|
1783
|
Thu Jul 23 10:05:38 2009 |
Alberto | Update | PSL | Summary of the latest adventures with the alignment of the mode cleaner |
|
|
1784
|
Thu Jul 23 20:30:23 2009 |
Alberto | Update | PSL | Beam aligned to the Farady | After yesterday's changes in the MC cavity
state today it was necessary to optimize
the alignment to the Faraday. |
|
1785
|
Fri Jul 24 11:04:11 2009 |
Alberto | Configuration | Computers | elog restarted | This morning I found the elog down. I restarted
it using the procedure in the wiki. |
|
1788
|
Fri Jul 24 21:02:46 2009 |
Alberto | Update | PSL | Aligning the beam to the Faraday | This afternoon I kept working on the alignment
of the beam so that it matches at the same
the PSL periscope, the Mode Cleaner and the |
|
1794
|
Sun Jul 26 16:05:17 2009 |
Alberto | Update | PSL | Aligning the mode cleaner |
|
|