40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 69 of 166  Not logged in ELOG logo
Entry  Mon Aug 13 15:31:09 2012, steve, Update, General, larger optical tables at the ends ETMYtable.jpgETMY4X3.jpg
    Reply  Mon Aug 13 18:00:30 2012, jamie, Update, General, larger optical tables at the ends 
       Reply  Tue Aug 14 15:58:44 2012, Jenne, Update, General, Translation to English: larger optical tables at the ends 
    Reply  Wed Aug 15 16:01:47 2012, steve, Update, General, larger optical tables at the ends ? bottleneck.jpg
       Reply  Wed Aug 22 11:41:20 2012, steve, Update, General, grout plate for optical table at the ends IMG_1561.JPG08231201.PDF
          Reply  Thu Sep 27 19:03:06 2012, Manasa, Update, 40m Upgrading, New ETMX layout - Version 1.0 ETMX_OldNew.png
             Reply  Thu Sep 27 20:05:57 2012, Koji, Update, 40m Upgrading, New ETMX layout - Version 1.0 
                Reply  Fri Sep 28 07:49:30 2012, Steve, Update, 40m Upgrading, New ETMX layout - Version 1.0 
Entry  Thu Sep 27 17:00:41 2012, Eric Gustafson, Update, LSC, 40 meter photodiode frequency response measurement system installation 
Entry  Thu Sep 27 13:05:55 2012, Eric Gustafson, Update, LSC, 40 meter photodiode frequency response measurement system installation 
    Reply  Thu Sep 27 16:26:11 2012, Steve, Update, LSC, RF fibre protection in cable trays 
Entry  Wed Sep 26 23:55:14 2012, Jenne, Update, IOO, WFS centered 
Entry  Tue Sep 25 22:40:55 2012, Jenne, Update, IOO, IPANG ND filter installed 
    Reply  Wed Sep 26 16:59:30 2012, jamie, Update, IOO, IPANG ND filter installed 
Entry  Wed Sep 26 01:10:34 2012, Jenne, Update, IOO, PZT2 not working?!?! MC back to normal 
Entry  Fri Sep 21 20:48:24 2012, Jenne, Update, General, POP in-vac optics aligned, POY beam coming out of vac 
    Reply  Fri Sep 21 22:25:44 2012, Mike J., Update, General, POX, POY, PR2 pics 10x
    Reply  Mon Sep 24 23:45:39 2012, rana, Update, General, POP in-vac optics aligned, POY beam coming out of vac 
       Reply  Tue Sep 25 14:29:07 2012, Jenne, Update, General, POP in-vac optics aligned, POY beam coming out of vac 
Entry  Mon Sep 24 20:28:13 2012, rana, Summary, elog, restarted elog: was unresponsive 
Entry  Mon Sep 24 10:27:50 2012, Steve, Omnistructure, General, do not leave stuff on optical table tops 
Entry  Sun Sep 23 22:40:48 2012, Den, Update, Modern Control, MC_L locking LQR_MCL.pdf
Entry  Fri Sep 21 22:43:51 2012, Den, Update, SUS, TT alignment 6x
Entry  Thu Sep 20 17:05:26 2012, Jenne, Update, General, REFL, IPANG are coming out of the vac 
    Reply  Thu Sep 20 20:07:38 2012, Jenne, Update, General, REFL, IPANG are coming out of the vac 
Entry  Mon Sep 17 20:23:31 2012, Jenne, Update, General, Last of In-vac mirror photos taken 
    Reply  Mon Sep 17 23:58:01 2012, rana, Update, General, Last of In-vac mirror photos taken 
       Reply  Thu Sep 20 14:55:06 2012, Jenne, Update, General, Pickoffs are hard to see 
          Reply  Thu Sep 20 19:56:05 2012, Jenne, Update, General, Pickoffs are hard to see 
    Reply  Tue Sep 18 11:53:12 2012, Jenne, Update, General, Last of In-vac mirror photos taken AllPhotos_Sept2012.pdf
       Reply  Wed Sep 19 01:15:15 2012, Jenne, Update, General, Last of In-vac mirror photos taken - NOT! 
Entry  Thu Sep 20 01:28:14 2012, Jenne, Update, General, DRMI aligned again, but with good arms 
    Reply  Thu Sep 20 08:34:46 2012, Manasa, Update, General, DRMI aligned again, but with good arms 
       Reply  Thu Sep 20 11:39:40 2012, Manasa, Update, General, DRMI aligned again, but with good arms 
Entry  Wed Sep 19 19:38:37 2012, Jenne, Update, General, Spot centered on BS, ETMY, ETMX 
Entry  Wed Sep 19 17:48:47 2012, Den, Update, Modern Control, ETMX etmx_suspos.png
Entry  Wed Sep 19 13:12:48 2012, Jenne, Update, IOO, Power into vacuum increased to 75mW 
Entry  Wed Sep 19 09:32:24 2012, Steve, Update, SUS, alignment centering jig IMG_1639.JPGIMG_1651.JPG
Entry  Tue Sep 18 18:24:50 2012, Jenne, Update, General, Scattering in BS chamber or ITMX chamber 
    Reply  Wed Sep 19 01:08:48 2012, Jenne, Update, General, DRMI aligned again DRMI_aligned_19Sept2012_ETMYwasHighNeedToFix.png
Entry  Tue Sep 11 17:17:51 2012, Eric Q., Mike J., Configuration, Electronics, AS beam scan 
    Reply  Wed Sep 12 08:16:49 2012, Steve, Configuration, PEM, chamber must be sealed overnight! 
    Reply  Wed Sep 12 20:08:51 2012, ericq, Update, Electronics, AS beam scan 
       Reply  Thu Sep 13 19:59:43 2012, Mike J., Update, Electronics, AS beam scan 
          Reply  Fri Sep 14 01:35:55 2012, Mike J., Update, Electronics, AS beam scan PLOTS H_razor.jpegV_razor.jpeg
             Reply  Tue Sep 18 22:06:21 2012, Mike J., Update, Electronics, AS beam scan plots and chi-squared beam_width.pyH_raz.pngV_raz.png
Entry  Sat Sep 15 18:29:25 2012, Jenne, Update, General, More photos taken 
    Reply  Mon Sep 17 13:39:32 2012, Jenne, Update, General, More photos taken AllPhotos_Sept2012.pdf
Entry  Fri Sep 14 21:03:02 2012, Den, Update, PEM, BS and AS tables vert.pnghoriz_4_50.pngacoustic.pngcoh.png
    Reply  Sat Sep 15 20:27:54 2012, Den, Update, PEM, BS and AS tables bs_as_h.jpgbs_as_v.jpg
       Reply  Mon Sep 17 07:57:58 2012, rana, Update, PEM, BS and AS tables for REFL change 
Entry  Sat Sep 15 18:46:50 2012, Den, Update, PEM, microphone location mics.png
Entry  Fri Sep 14 16:39:14 2012, ericq, jenne, Update, General, First In Vac Picture mmt1.jpg
    Reply  Fri Sep 14 18:15:43 2012, rana, Update, ASC, First In Vac Picture 
    Reply  Fri Sep 14 18:18:33 2012, Jenne, Update, General, In Vac Pictures mmt2.jpg
       Reply  Fri Sep 14 18:28:25 2012, Jenne, Update, General, In Vac Pictures pzt1_light.jpgmmt1.jpgmmt2.jpgpzt2.jpgippo.jpg
Entry  Thu Sep 13 17:19:45 2012, Jenne, Update, SUS, Mirrors being installed on active TTs 
    Reply  Fri Sep 14 01:05:36 2012, Den, Update, SUS, Mirrors being installed on active TTs 
       Reply  Fri Sep 14 12:51:43 2012, Jenne, Update, SUS, Need risers for active TTs 
Entry  Fri Sep 14 00:56:13 2012, Jenne, Update, General, DRMI aligned 
Entry  Fri Sep 14 00:33:31 2012, rana, Update, PSL, PMC alignment - mystery in reflected power pmcr.jpge.pnga.png
Entry  Thu Sep 13 23:27:14 2012, Jenne, Update, General, Pre-close checklist 
Entry  Wed Sep 12 19:26:08 2012, Rijuparna Chakraborty, Update, , cavitymode scan 7x
    Reply  Thu Sep 13 07:36:41 2012, Steve, Update, General, restore conditions 
Entry  Wed Sep 12 11:33:49 2012, Steve, Update, SAFETY, safety training 
Entry  Sat Sep 8 00:04:53 2012, Jenne, Update, General, Beam scan measurement plan - to do Monday morning. 
    Reply  Mon Sep 10 08:50:35 2012, Steve, Update, General, Beam scan measurement plan - to do Monday morning. 
    Reply  Mon Sep 10 19:04:32 2012, rana, Update, General, plan 
Entry  Mon Sep 10 18:42:33 2012, Jenne, Mike J., Update, Cameras, XY beam scan tomorrow 
Entry  Fri Sep 7 15:58:29 2012, Rijuparna Chakraborty, Update, , cavitymode scan 
    Reply  Fri Sep 7 17:37:16 2012, Jenne, Update, , cavitymode scan 
       Reply  Sat Sep 8 00:15:57 2012, Rijuparna Chakraborty, Update, , cavitymode scan 
Entry  Fri Sep 7 15:31:52 2012, Mike J., Update, Computers, Sensoray back up output_5.mp4
    Reply  Fri Sep 7 17:24:16 2012, Mike J., Update, Computers, Sensoray Video Capture 
       Reply  Fri Sep 7 17:34:53 2012, Jenne, Update, Computers, Sensoray Video Capture 
Entry  Thu Sep 6 19:21:58 2012, Manasa, Configuration, 40m Upgrading, Baffle problem bfl.png
    Reply  Fri Sep 7 11:58:12 2012, Manasa, Configuration, 40m Upgrading, Baffle problem bfl.png
       Reply  Fri Sep 7 13:01:53 2012, Manasa, Configuration, 40m Upgrading, Baffle problem Picture1.png
Entry  Fri Sep 7 12:28:09 2012, Koji, Update, LSC, 11&55MHz modulations turned off 
Entry  Fri Sep 7 01:25:53 2012, Jenne, Update, General, PRC, SRC flashing 
Entry  Fri Sep 7 00:08:10 2012, janosch, Metaphysics, , baffle clipping loss 
Entry  Thu Sep 6 18:49:30 2012, Jenne, Update, RF System, AS 55 may be broken 
    Reply  Thu Sep 6 19:36:19 2012, Jenne, Update, RF System, AS 55 is fine 
Entry  Thu Sep 6 17:11:40 2012, janosch, Manasa, Steve, Update, , pick-off and baffle at ETMY 
Entry  Thu Sep 6 17:06:25 2012, Rijuparna Chakraborty, Configuration, elog, Cavitymode scan 3.pdf2.pdf1.pdfcavityscanconnections.pdf
Entry  Thu Sep 6 16:46:44 2012, Jenne, Update, SUS, BS aligned, target removed 
Entry  Thu Sep 6 13:07:02 2012, Jenne, Update, IOO, IPANG no longer a reference :( 
Entry  Wed Sep 5 19:29:45 2012, Jenne, Update, General, Yarm aligned to IR incident beam 
    Reply  Thu Sep 6 02:51:47 2012, Koji, Update, General, Green beam roughtly aligned (Re: Yarm aligned to IR incident beam) green_y.png
       Reply  Thu Sep 6 10:57:27 2012, Jenne, Update, General, Forgot to turn green refl pd back on 
Entry  Tue Sep 4 20:03:38 2012, Jenne, Update, General, in-vac progress 
    Reply  Tue Sep 4 20:20:47 2012, jamie, Update, General, problematic tip-tilts 
Entry  Tue Sep 4 13:31:55 2012, Jenne, Update, General, The Plan 
    Reply  Tue Sep 4 13:44:17 2012, Manasa, Update, General, The Plan 
    Reply  Tue Sep 4 20:13:46 2012, Jenne, Update, General, The Plan - Tues evening version 
Entry  Tue Sep 4 20:06:04 2012, Jenne, Update, Locking, MC scan input switched to the 11MHz port of EOM 
Entry  Tue Sep 4 13:50:26 2012, ericq, Update, PSL, PMC Realigned, power adjusted 
Entry  Tue Sep 4 11:32:58 2012, Jenne, Update, Locking, Friday in-vac work 
Entry  Tue Sep 4 10:29:41 2012, Steve, Update, SUS, PRM damping restored 
ELOG V3.1.3-