ID Date Author Type Category Subject Text Attachments
  13537   Fri Jan 12 10:02:05 2018 johannesUpdateDAQetmx slow daq chassis


Quote:


  
  13536   Thu Jan 11 21:09:33 2018 gautamUpdateCDSrevisiting Acromag We'd like to setup the recording of
the PSL diagnostic connector Acromag channels
in a more robust way - the objective is to
  
  13535   Thu Jan 11 20:59:41 2018 gautamUpdateDAQetmx slow daq chassisSome suggestions of checks to
run, based on the rightmost colum in the
wiring diagram here
  
  13534   Thu Jan 11 20:51:20 2018 gautamUpdateALSFiber ALS assayAfter labeling cables I would disconnect,
I pulled the box out of the LSC rack. Attachment
#1 is a picture of the insides of the box
 IMG_5112.JPG 
  13533   Thu Jan 11 18:50:31 2018 gautamUpdateIOOMCautolocker getting stuckI've noticed this a couple of times
today - when the autolocker runs the 
  
  13532   Thu Jan 11 14:47:11 2018 SteveUpdatePSLshelf work for tomorrowI have just received the scheduling of
the PSL self work for tomorrow. Gautam and
I agreed that if it is needed I will shut
  
  13531   Thu Jan 11 14:22:40 2018 gautamUpdateALSFiber ALS assayI did a cursory check of the ALS signal
chain in preparation for commissioning the
IR ALS system. The main elements of this
  
  13530   Thu Jan 11 09:57:17 2018 SteveUpdateDAQacromag at ETMXGood going Johannes!




 Acromg_in_action.png 
  13529   Wed Jan 10 22:24:28 2018 johannesUpdateDAQetmx slow daq chassisThis evening I transitioned the slow controls
to c1auxex2.


Disconnected satellite
  
  13528   Wed Jan 10 22:19:44 2018 ranaUpdateSUSETMX DC alignmentBest to just calibrate the ETM OL in the
usual way. I bet the OSEM outputs have a
cal uncertainty of ~50% since the input matrix
  
  13527   Wed Jan 10 18:53:31 2018 gautamUpdateSUSETMX DC alignmentI should've put in the SUSPIT and SUSYAW
channels in the previous screenshot. I re-aligned
ETMX till I could see IR flashes in the arm,
 ETMXdrift.png 
  13526   Wed Jan 10 16:27:02 2018 SteveConfigurationSEIload cell for weight measurementWe could use similar
load cells   to make the actual
weight measurement on the Stacis legs. This
 stacis3LoadCells.png 
  13525   Wed Jan 10 15:25:43 2018 johannesConfigurationComputer Scripts / Programsautoburt making backups again


Quote:


  
  13524   Wed Jan 10 14:17:57 2018 johannesConfigurationComputer Scripts / Programsautoburt no longer making backupsI was looking into setting up autoburt
for the new c1auxex2 and found that it stopped
making automatic backups for all machines
  
  13523   Wed Jan 10 12:42:27 2018 gautamUpdateSUSETMX DC alignmentI've been observing this for a few
days: ETMX's DC alignment seems to drift
by so much that the previously
 ETMXdrift.png 
  13522   Wed Jan 10 12:24:52 2018 gautamUpdateCDSslow machine bootfestMC autolocker got stuck (judging by wall
StripTool traces, it has been this way for
~7 hours) because 
  
  13521   Wed Jan 10 09:49:28 2018 SteveUpdatePEMthe rat is backFive mechcanical traps set inside of boxes.
Red-white warning tape on top of each.

  
  13520   Tue Jan 9 21:57:29 2018 gautamUpdateOptimal ControlOplev loop tuningAfter some more tweaking, I feel like I
may be getting closer to a cost-function
definition that works.
 loopOpt_180108_2232.pdf 
  13519   Tue Jan 9 21:38:00 2018 gautamUpdateALSALS recovery
Aligned IFO to IR.

Ran
dither alignment to maximize arm transmission.
Centered
Oplev reflections onto their respective QPDs
 GreenLockStability.pngALS_OLTFs_20180109.pdfALS_OLTF_data_20180109.tar.bz2 
  13518   Tue Jan 9 11:52:29 2018 gautamUpdateCDSslow machine bootfestEurocrate key turning reboots today morning
for and
  
  13517   Tue Jan 9 00:07:03 2018 johannesUpdateDAQetmx slow daq chassisAll parts received and assembly near complete,
small problem detected because the two DSub
connectors are too close together for two
  
  13516   Mon Jan 8 20:50:01 2018 ranaSummaryElectronicsSR560: reworkingI replaced the NPD5565 with a LSK389 (SOIC-8
with DIP adapter). There was a noise reduction
of ~30%, but not nearly as much as I expected.
  
  13515   Sun Jan 7 20:11:54 2018 KojiUpdatePonderSqueezeDisplacement requirements for short-term squeezingIn fact, that is my point. If we use signal
recycling instead of resonant sideband extraction,
the "tuning" of the SRC is opposite
  
  13514   Sun Jan 7 17:27:13 2018 gautamUpdatePonderSqueezeDisplacement requirements for short-term squeezingMaybe you've accounted for this already
in the Optickle simulations - but in Finesse
(software), the "tuning" corresponds
  
  13513   Sun Jan 7 11:40:58 2018 KevinUpdatePonderSqueezeDisplacement requirements for short-term squeezingYes, this SRC detuning is very close to
extreme signal recycling (0° in this
convention), and the homodyne angle is close
  
  13512   Sun Jan 7 03:22:24 2018 KojiUpdatePonderSqueezeDisplacement requirements for short-term squeezingInteresting. My understanding is that this
is close to signal recycling, rather than
resonant sideband extraction. Is that correct?
  
  13511   Sat Jan 6 23:25:18 2018 KevinUpdatePonderSqueezeDisplacement requirements for short-term squeezing 




 displacement_noise.pdfnoise_budget.pdfangles.pdf 
  13510   Sat Jan 6 18:27:37 2018 gautamUpdateGeneralpower outage - IFO recoveryMostly back to nominal operating conditions
now.


EX TransMon QPD is not
 EX_QPD_Quad1_Faulty.pdfTrillium_faulty.pdf 
  13509   Sat Jan 6 13:47:32 2018 ranaUpdatePonderSqueezeDisplacement requirements for short-term squeezing
ought to tune for 210 Hz (in-between
powerlines) since 100 Hz is tough to work
due to scattering, etc.
rename
  
  13508   Sat Jan 6 05:18:12 2018 KevinUpdatePonderSqueezeDisplacement requirements for short-term squeezingI have been looking into whether we can
observe squeezing on a short timescale. The
simulations I show here say that we can get
 displacement_noise.pdfnoise_budget.pdf 
  13507   Fri Jan 5 22:19:53 2018 gautamUpdateGeneralpower outage - timing errorJust putting the relevant line from email
from Rolf which at least identifies the problem
here:
  
  13506   Fri Jan 5 21:54:28 2018 ranaUpdateGeneralpower outage - timing errorRolf came here in the morning, but not
sure what he did or if Jamie remotely did
something. But the screen is green.
 huh.png 
  13505   Fri Jan 5 19:19:25 2018 ranaConfigurationSEIBarry Controls 'air puck' instead of 'VOPO style' breadboardWe've been thinking about putting in
a blade spring / wire based aluminum breadboard
on top of the ETM & ITM stacks to get
 mm_slm.jpgScreen_Shot_2018-01-05_at_7.25.47_PM.png 
  13504   Fri Jan 5 17:50:47 2018 ranaConfigurationComputersmotif on nodusI had to do 'sudo yum install motif'
on nodus so that we could get libXm.so.4
so that we could run MEDM. Works now.
  
  13503   Thu Jan 4 14:39:50 2018 gautamUpdateGeneralpower outage - timing errorAs mentioned in my previous elog, the CDS
overview screen "DC" indicators
are all RED (everything else is green). Opening
  
  13502   Thu Jan 4 12:46:27 2018 gautamUpdateALSFiber ALS assayAttachment
#1 is the updated
 FiberALS.pdfFiberALS.svg.zip 
  13501   Wed Jan 3 18:00:46 2018 gautamUpdatePonderSqueezeplan of actionNotes
of stuff we discussed @ today's meeting,
and afterwards, towards measuring ponderomotive
  
  13500   Wed Jan 3 16:25:32 2018 awadeUpdateOptimal ControlOplev loop tuningAnother cool feature
is client side pre-commit hooks. 
  
  13499   Wed Jan 3 15:13:55 2018 SteveUpdateGeneralprojector light bulb replacedBulb 
is replaced.

  
  13498   Wed Jan 3 12:33:16 2018 ranaUpdateOptimal ControlOplev loop tuningWhen putting code into git.ligo.org, one
way to have automated testing is to use the
Gitlab CI. This is an automated 'checker',
  
  13497   Tue Jan 2 16:37:26 2018 gautamUpdateOptimal ControlOplev loop tuningI've made various changes to the optimal
loop design approach, but am still not having
much success. A summary of changes made:
 loopOpt_180102_1706.pdfglobalCosts.pdf 
  13496   Tue Jan 2 16:24:29 2018 gautamUpdatesafetyProjector periodically shuts itself offI noticed this behaviour since ~Dec 20th,
before the power failure. The bulb itself
seems to work fine, but the projector turns
  
  13495   Tue Jan 2 15:43:35 2018 SteveUpdateVACpumpdown after power outage 




 pumpdown_from_44_mTorr.png 
  13494   Sun Dec 31 12:43:50 2017 ranaSummaryElectronicsSR560: reworkingI have
ordered some LSK389A (in both the SOIC-8
and TO-71 packages) to replace the SR560's
 Preamps.pdf 
  13493   Thu Dec 28 17:22:02 2017 gautamUpdateGeneralpower outage - CDS recovery
I had to manually reboot c1lsc,
c1sus and c1ioo.
I edited the
line in /etc/rt.sh (specifically, on FB /diskless/root.jessie/etc/rt.sh)
 28.png 
  13492   Tue Dec 26 17:24:24 2017 SteveUpdateGeneralpower outageThere was a power outage.

The IFO pressure is 12.8 mTorr-it
and it is not pumped. V1 is still closed.
 powerOutage.png 
  13491   Fri Dec 22 09:40:19 2017 ranaSummaryGeneralDAC noise contribution to squeezing noise budget
Should not count the ITMs. On those
we can use big resistors / filters to cut
out the noise.
For the initial
  
  13490   Thu Dec 21 19:25:48 2017 KevinSummaryGeneralDAC noise contribution to squeezing noise budgetGautam and I redid our calculations, and
the updated plot of squeezing as a function
of DAC current noise per coil is shown in
 40mDAC_squeezing.pdf 
  13489   Wed Dec 20 00:43:58 2017 KevinSummaryGeneralDAC noise contribution to squeezing noise budgetGautam and I looked into the DAC noise
contribution to the noise budget for homodyne
detection at the 40m. DAC noise is currently
 40m_squeezing.pdf40mDAC_squeezing.pdf 
  13488   Mon Dec 18 20:37:18 2017 gautamUpdatePSLPMC MEDM cleanupThere are fewer lies on this screen now.
For reference, the details of the electronics
modifications made are in this
 PMC_revamped.png 