40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 62 of 344  Not logged in ELOG logo
    Reply  Wed Jul 8 20:37:02 2015, Jamie, Summary, CDS, CDS upgrade: one step forward, two steps back 
    Reply  Wed Jul 8 21:02:02 2015, Jamie, Summary, CDS, CDS upgrade: another step forward, so we're back to where we started (plus a bit?) 
    Reply  Thu Jul 9 13:26:47 2015, Jamie, Summary, CDS, CDS upgrade: new mx 1.2.16 installed 
    Reply  Thu Jul 9 16:50:13 2015, Jamie, Summary, CDS, CDS upgrade: if all else fails try throwing metal at the problem 
    Reply  Mon Jul 13 01:11:14 2015, Jamie, Summary, CDS, CDS upgrade: current assessment 
    Reply  Mon Jul 13 18:12:50 2015, Jamie, Summary, CDS, CDS upgrade: left running in semi-stable configuration 
    Reply  Tue Jul 14 09:08:37 2015, Jamie, Summary, CDS, CDS upgrade: left running in semi-stable configuration 
    Reply  Tue Jul 14 10:28:02 2015, ericq, Summary, CDS, CDS upgrade: left running in semi-stable configuration 
    Reply  Tue Jul 14 11:57:27 2015, jamie, Summary, CDS, CDS upgrade: left running in semi-stable configuration 
    Reply  Tue Jul 14 16:51:01 2015, Jamie, Summary, CDS, CDS upgrade: problem is not disk access 
Entry  Tue Jul 14 17:14:23 2015, Eve, Summary, Summary Pages, Future summary pages improvements 
    Reply  Wed Jul 15 13:19:14 2015, Jamie, Summary, CDS, CDS upgrade: reducing mx end-points as last ditch effort 
    Reply  Wed Jul 15 18:19:12 2015, Jamie, Summary, CDS, CDS upgrade: tentative stabilty? 
    Reply  Sat Jul 18 15:37:19 2015, Jamie, Summary, CDS, CDS upgrade: current status cds-good.pngsus-damped.png
    Reply  Wed Jul 22 22:06:42 2015, Eve, Summary, Summary Pages, Future summary pages improvements 
Entry  Thu Jul 23 20:57:15 2015, Jessica, Summary, General, Applying Pre-filter to data before IIR Wiener Filtering BodePlot.pngacc_bandpass.pngmcl_seis.png
Entry  Tue Jul 28 20:42:50 2015, Jessica, Summary, General, New Seismometer Data Coherence Coherence1.pngCoherence2.png
Entry  Wed Jul 29 10:34:42 2015, Ignacio, Summary, LSC, Coherence of arms and seismometers 8x
Entry  Wed Jul 29 11:15:21 2015, Jessica, Summary, LSC, PSDs of Arms with seismometer subtraction Arms_PSD.pngXArm_PSD.pngYArm_PSD.png
Entry  Wed Jul 29 21:40:39 2015, Koji, Summary, CDS, Status of the frame data syncing 
    Reply  Thu Jul 30 11:47:54 2015, Koji, Summary, CDS, Status of the frame data syncing 
Entry  Thu Aug 13 12:06:39 2015, Jessica , Summary, IOO, Better predicted subtraction did not work as well Online 6x
Entry  Fri Aug 14 23:49:34 2015, Koji, Summary, General, B&K Shaker fixed IMG_1947.JPG
Entry  Sat Aug 22 15:48:32 2015, Koji, Summary, LSC, Arm locking recovery 
Entry  Tue Sep 1 02:44:44 2015, Koji, Summary, CDS, c1oaf, c1mcs modified for the IMC angular FF c1oaf_screenshot1.pngc1oaf_screenshot2.pngc1mcs_screenshot.pngOAF_MEDM1.pngOAF_MEDM2.png
Entry  Thu Sep 3 19:52:24 2015, rana, Summary, SUS, SUS drift monitor 07.png
Entry  Thu Sep 10 09:37:34 2015, Ignacio, Summary, IOO, Filters left on MCL static module 
Entry  Tue Sep 15 01:14:10 2015, rana, Summary, LSC, need to check LSC Whitening switch logic ... again 
Entry  Tue Sep 15 15:01:23 2015, rana, Summary, LSC, disabling the LSC AA filters + mod to whitening 
Entry  Tue Sep 15 15:10:48 2015, gautam, ericq, rana, Summary, LSC, PRFPMI lock & various to-do's powerSpec0915.pdf
    Reply  Tue Sep 15 18:35:21 2015, ericq, Summary, LSC, some further notes 
    Reply  Tue Sep 15 20:44:13 2015, gautam, Summary, LSC, Checking the delay line phase shifter DS050339 IMG_20150915_193100.jpgCalibration.pdf
Entry  Wed Sep 16 03:37:06 2015, Koji, Summary, Green Locking, Workable delay line setup prepared 6x
    Reply  Wed Sep 16 15:04:33 2015, ericq, Summary, LSC, DC PD Whitening Board Fixed 
    Reply  Thu Sep 17 03:48:10 2015, ericq, Summary, LSC, some further notes 
    Reply  Thu Sep 17 13:06:05 2015, ericq, Summary, LSC, Low input impedance on CM board 
Entry  Thu Sep 17 19:58:06 2015, gautam, Summary, Computer Scripts / Programs, Frequency counting algorithm 
    Reply  Mon Sep 21 18:31:06 2015, gautam, Summary, Computer Scripts / Programs, Frequency counting algorithm 6x
    Reply  Mon Sep 21 23:18:55 2015, ericq, Summary, Computer Scripts / Programs, Frequency counting algorithm 
    Reply  Tue Sep 22 02:11:17 2015, rana, Summary, Computer Scripts / Programs, Frequency counting algorithm 
Entry  Tue Sep 22 16:52:36 2015, ericq, Summary, General, Random Notes 
Entry  Fri Nov 13 22:32:54 2015, Koji, Summary, PSL, PMC LO degraded, usual ERA-5 replacement, LO recovered PMC_LO.pngIMG_2093.JPGIMG_2091.JPGIMG_2095.JPGIMG_2096.JPG
Entry  Sat Nov 14 00:52:25 2015, Koji, Summary, CDS, Investion on EPICS freeze 
    Reply  Sun Nov 15 22:43:48 2015, Koji, Summary, PSL, PMC LO degraded, usual ERA-5 replacement, LO recovered C1-MULTI_E6875C_TIMESERIES-1131408017-86400.pngC1-MULTI_E6875C_TIMESERIES-1131580817-86400.png
    Reply  Mon Nov 16 19:05:59 2015, Koji, Summary, PSL, PMC servo circuit review, follow up measurements 
    Reply  Mon Nov 16 21:32:49 2015, Koji, Summary, PSL, PMC servo circuit review, follow up measurements 
    Reply  Tue Nov 17 16:21:10 2015, Koji, Summary, PSL, PMC servo circuit review, follow up measurements 
Entry  Tue Nov 17 20:40:08 2015, yutaro, Summary, ASC, Loss maps of arm cavities 
    Reply  Wed Nov 18 16:51:58 2015, Koji, Summary, PSL, PMC servo calibration PMC_err_cal.pdf
    Reply  Wed Nov 18 16:53:17 2015, Koji, Summary, PSL, PMC PZT capacitance 
ELOG V3.1.3-