40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 61 of 354
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17699 Entries
Goto page
Previous
1
,
2
,
3
...
60
, 61,
62
...
352
,
353
,
354
Next
Mon May 9 18:54:29 2011, kiwamu, Update, LSC, triggerd locking logic : screen prepared
Mon May 9 20:30:20 2011, rana, Update, PSL, PSL reference cavity temperature box modifications
Tue May 10 00:31:28 2011, kiwamu, Update, ASC, IFO alignment plan
Tue May 10 00:44:52 2011, valera, Update, IOO, MC2 centering
Tue May 10 01:39:41 2011, Suresh, Update, RF System, RF source troubles
Tue May 10 09:05:49 2011, Koji, Update, General, aLIGO BBPD / Green PD investigation
Tue May 10 10:06:23 2011, josephb, Update, PSL, Fixed channel names for PSL QPDs, fixed saturation, changed signs
Tue May 10 11:14:44 2011, steve, Update, PSL, PSL-QPD_ANG qpd optimized
Tue May 10 16:42:49 2011, josephb, Update, CDS, New upconversion model (c1uct)
Tue May 10 16:45:19 2011, josephb, Update, CDS, c1ass now receiving AS55I from c1lsc
Tue May 10 20:57:05 2011, rana, Update, PSL, PSL reference cavity temperature box modifications : after 24 hours still OK
Tue May 10 22:56:17 2011, kiwamu, Update, SUS, f2p filters installed on ETMY
Tue May 10 23:14:01 2011, kiwamu, Update, SUS, ETMX_OPLEV : He-Ne laser dead ?
Wed May 11 00:23:21 2011, kiwamu, Update, ASC, Y arm and beam pointing alignment
Wed May 11 11:05:45 2011, steve, Update, SUS, ETMX_OPLEV : He-Ne replaced
Wed May 11 11:24:59 2011, steve, Update, SUS, SRM-oplev qpd is back
Wed May 11 11:44:52 2011, kiwamu, Update, SUS, f2p filters installed on ITMY
Wed May 11 13:54:32 2011, steve, Update, LSC, LSC power supplies
Wed May 11 21:58:30 2011, rana, Update, SUS, ETMX_OPLEV : He-Ne replaced
Wed May 11 22:52:55 2011, kiwamu, Update, LSC, status update and plan
Wed May 11 22:54:53 2011, Jenne, Update, Treasure, ETMY trans QPD installed
Wed May 11 23:02:52 2011, valera, Update, ASS, Dither angular stabilizitaion system update
Thu May 12 00:59:45 2011, ryan, rana, Update, PSL, Return of the PSL temperature box
Thu May 12 02:31:07 2011, Suresh, Update, RF System, installation of RF splitters in Demod boards
Thu May 12 05:25:26 2011, kiwamu, Update, IOO, IP_POS disconnected
Thu May 12 08:54:11 2011, steve, Update, IOO, IP_POS cable found
Thu May 12 09:00:23 2011, steve, Update, General, optical table covers must be used
Thu May 12 10:27:02 2011, rana, Update, RF System, installation of RF splitters in Demod boards
Thu May 12 16:50:22 2011, Suresh, Update, RF System, installation of RF splitters in Demod boards
Thu May 12 18:21:19 2011, kiwamu, Update, IOO, welcome back IP_POS
Thu May 12 22:54:20 2011, rana, Update, DAQ, Input Beam Naming change (no more IP)
Thu May 12 23:12:40 2011, kiwamu, Update, CDS, c1lsc crashed
Thu May 12 23:41:47 2011, rana, Update, CDS, MEDM Snapshots not working
Thu May 12 23:50:10 2011, Suresh, Update, RF System, POY55_Demod board Hardware change completed
Fri May 13 00:39:53 2011, valera, Update, ASS, c1ass update
Fri May 13 01:42:35 2011, kiwamu, Update, LSC, ready for Schnupp asymmetry measurement
Fri May 13 01:51:56 2011, Suresh, Update, RF System, RF Status update
Fri May 13 14:54:20 2011, Leo Singer, Update, Computers, Diaggui fixed on pianosa
Fri May 13 22:45:37 2011, Suresh, Update, RF System, The full set of 8 Demod boards is ready for testing
Fri May 13 23:04:58 2011, Suresh, Update, RF System, DC power supply on RF distribution box has been replaced.
Sat May 14 14:12:16 2011, Koji, Update, RF System, DC power supply on RF distribution box has been replaced.
Sat May 14 14:50:21 2011, Koji, Update, LSC, 1Y2 5V Blown Fuse found -> Fixed
Sun May 15 03:58:19 2011, rana, Update, CDS, diagonalization of MC input matrix
Sun May 15 12:42:29 2011, kiwamu, Update, SUS, f2p ratio adjutment done for all the suspensions
Sun May 15 14:01:56 2011, kiwamu, Update, IOO, wiring diagram for IP-POS
Sun May 15 19:10:12 2011, kiwamu, Update, LSC, Calibration of actuators : BS, ITMX and ITMY
Sun May 15 19:55:15 2011, kiwamu, Update, Photos, ETMY optical bench
Sun May 15 21:27:51 2011, Jenne, Update, Photos, ETMY optical bench
Mon May 16 10:05:02 2011, kiwamu, Update, Photos, Re:ETMY optical bench
Mon May 16 11:14:36 2011, rana, Update, IOO, wiring diagram for IP-POS
Goto page
Previous
1
,
2
,
3
...
60
, 61,
62
...
352
,
353
,
354
Next
ELOG V3.1.3-