Thu Sep 26 10:55:29 2013, Steve, Update, General, Y-arm floor space for test
|
Wed Sep 25 17:07:08 2013, rana, Frogs, Treasure, Free Green Mango Juice in fridge
|
Tue Sep 24 22:19:57 2013, Manasa, Update, General, FPMI locked
|
Tue Sep 24 20:43:45 2013, masayuki, Summary, SUS, optical levers centering 
|
Tue Sep 24 10:55:45 2013, rana, Update, PSL, PMC re-aligned
|
Sun Sep 22 23:04:52 2013, rana, Update, PEM, Guralp needs recentering
|
Sun Sep 22 21:28:53 2013, rana, Update, SUS, set OL T RAMP values (they are not visible on the OL screens)
|
Fri May 13 17:20:48 2011, Leo Singer, Configuration, SUS, Tuned bounce and roll mode of ETMY suspension
|
Sun Sep 22 21:03:15 2013, rana, Configuration, SUS, Tuned bounce and roll mode of ETMY suspension 
|
Tue Aug 20 16:23:41 2013, rana, Summary, General, /home/cds nearly full
|
Wed Aug 21 17:42:03 2013, rana, Summary, General, /home/cds nearly full
|
Fri Sep 20 20:14:52 2013, rana, Summary, General, /home/cds nearly full
|
Thu Sep 19 21:42:18 2013, rana, Update, SUS, Optical Lever Trend for 90 days: ETMX and PRM are the bad ones
|
Fri Sep 20 09:49:06 2013, Steve, Update, SUS, Optical Lever Trend for 180 days: bad ETMY & PRM
|
Fri Sep 20 08:15:30 2013, Steve, Update, Computer Scripts / Programs, Ottavia, Rossa and Pianosa  
|
Wed May 23 13:57:11 2012, Jenne, Bureaucracy, General, 40m Meeting Action Items
|
Wed May 23 20:41:37 2012, Suresh, Bureaucracy, General, 40m Meeting Action Items: Tip-tilts : cabling and electronics
|
Thu May 24 01:17:13 2012, Den, Update, CDS, PMC autolocker
|
Sun Jun 24 23:42:31 2012, yuta, Update, Computer Scripts / Programs, PMC locker
|
Mon Jun 25 21:54:52 2012, Den, Update, Computer Scripts / Programs, PMC locker
|
Tue Jun 26 00:52:18 2012, yuta, Update, Computer Scripts / Programs, PMC locker
|
Thu Sep 19 18:48:24 2013, rana, Update, Computer Scripts / Programs, PMC locker
|
Thu Sep 19 21:15:44 2013, rana, Update, Computer Scripts / Programs, PMC locker
|
Thu Sep 19 10:24:58 2013, Steve, Update, PEM, PRM damping restored after earth quake
|
Wed Sep 18 11:29:43 2013, manasa, Update, CDS, Dataviewer cannot connect to fb
|
Wed Sep 18 11:52:53 2013, Jamie, Update, CDS, Dataviewer cannot connect to fb
|
Tue Aug 27 19:50:06 2013, Jamie, Configuration, Computer Scripts / Programs, cdsutils checked out into /opt/rtcds
|
Mon Sep 16 15:29:50 2013, Jamie, Configuration, Computer Scripts / Programs, cdsutils checked out into /opt/rtcds
|
Mon Sep 16 19:41:01 2013, rana, Configuration, Computer Scripts / Programs, cdsutils checked out into /opt/rtcds
|
Tue Sep 17 17:55:42 2013, Jamie., Configuration, Computer Scripts / Programs, pyepics configured
|
Mon Sep 9 20:46:28 2013, Masayuki, Update, LSC, MICH calbration
|
Tue Sep 10 17:35:50 2013, Masayuki, Manasa, Update, LSC, MICH calbration    
|
Thu Sep 12 23:36:25 2013, Masayuki, Update, LSC, MICH calbration   
|
Fri Sep 13 19:22:01 2013, Masayuki, Update, LSC, MICH calbration
|
Mon Sep 16 14:11:47 2013, rana, Update, LSC, MICH calbration 
|
Tue Sep 17 00:50:42 2013, Masayuki, Update, LSC, MICH calbration
|
Thu Sep 12 01:06:09 2013, Jenne, Update, ASC, SRCL ASS implemented
|
Wed Sep 11 23:34:37 2013, Masayuki, Summary, Green Locking, ALS locking in both arms
|
Wed Sep 11 23:43:10 2013, Koji, Summary, Green Locking, ALS locking in both arms
|
Thu Sep 12 00:07:26 2013, Masayuki, Summary, Green Locking, ALS locking in both arms
|
Wed Sep 11 17:35:38 2013, Jenne, Update, LSC, ALS requirement 
|
Fri Sep 6 23:01:08 2013, Koji, Update, LSC, Stable DRMI lock was recovered from the impact on the RF system modification  
|
Thu Sep 5 21:07:09 2013, Jenne, Update, LSC, Started work on logic for triggering
|
Thu Sep 5 15:18:41 2013, Jenne, Update, LSC, Free swinging DRMI power buildups
|
Thu Sep 5 10:28:17 2013, Steve, Update, SUS, PRM side
|
Thu Sep 5 11:19:33 2013, Jenne, Update, SUS, PRM side
|
Thu Sep 5 01:55:29 2013, Jenne, Update, LSC, LSC model upated to have AS110 channels, violin filter triggering
|
Wed Sep 4 16:08:22 2013, manasa, Update, SUS, MC2 tickler turned OFF
|
Wed Sep 4 20:39:23 2013, rana, Update, SUS, MC2 tickler turned OFF
|
Wed Sep 4 22:14:35 2013, Jenne, Update, SUS, MC2 tickler turned OFF
|
Thu Sep 5 00:40:33 2013, rana, Update, SUS, MC2 tickler turned OFF
|
Wed Apr 3 17:40:18 2013, Jamie, Configuration, Electronics, putting together a 110 MHz LSC demod board
|
Wed Apr 3 18:41:22 2013, Jamie, Configuration, Electronics, putting together a 110 MHz LSC demod board
|
Wed Apr 3 22:26:51 2013, rana, Configuration, Electronics, putting together a 110 MHz LSC demod board
|
Thu Apr 4 14:37:15 2013, Jamie, Configuration, Electronics, putting together a 110 MHz LSC demod board
|
Mon Aug 26 18:55:18 2013, Jenne, Configuration, Electronics, putting together a 110 MHz LSC demod board for AS
|
Mon Aug 26 20:13:17 2013, rana, Configuration, Electronics, putting together a 110 MHz LSC demod board for AS
|
Tue Aug 27 15:31:48 2013, Jenne, Configuration, Electronics, putting together a 110 MHz LSC demod board for AS
|
Tue Sep 3 21:10:36 2013, Jenne, Configuration, Electronics, putting together a 110 MHz LSC demod board for AS
|
Tue Aug 27 17:32:52 2013, Jenne, Configuration, Electronics, putting together a 110 MHz LSC demod board for AS
|
Tue Aug 27 18:21:35 2013, Jenne, Configuration, Electronics, 110 MHz LO options
|
Tue Aug 27 18:58:52 2013, Koji, Configuration, Electronics, 110 MHz LO options
|
Mon Sep 2 16:46:32 2013, Jenne, Update, Electronics, RF distribution box is on the bench
|
Mon Sep 2 18:06:21 2013, Jenne, Update, Electronics, RF distribution box: 110 MHz LO options  
|
Tue Sep 3 21:08:13 2013, Jenne, Update, Electronics, RF distribution box: 110 MHz LO options
|
Wed Sep 4 16:06:40 2013, Jenne, Update, Electronics, RF distribution box: Reinstalled
|
Wed Sep 4 21:44:54 2013, Not Jenne, Update, Electronics, RF distribution box: Reinstalled
|
Wed Sep 4 20:47:15 2013, manasa, Update, LSC, Calibrated in-loop MICH noise
|
Wed Sep 4 17:22:09 2013, Jenne, Update, LSC, Demod phases for RFPDs
|
Fri Aug 30 11:00:46 2013, Manasa, Update, General, Series of earthquakes 
|
Tue Sep 3 14:23:21 2013, Steve, Update, PEM, earthquakes
|
Fri Aug 30 14:31:57 2013, Steve, Update, General, cleaning up  
|
Mon Sep 2 03:51:14 2013, rana, HowTo, General, How To Coil Cables
|
Tue Sep 3 10:54:33 2013, Steve, HowTo, General, How To Coil Cables
|
Mon Sep 2 15:22:57 2013, Jenne, Update, PSL, PMC relocked
|
Fri Aug 30 01:01:28 2013, rana, nic, Summary, Computer Scripts / Programs, aLIGO Noise Budget code installed and running 
|
Thu Aug 29 17:25:50 2013, Jamie, Update, SUS, SUS medm screen upgrade
|
Tue Aug 27 19:34:36 2013, Jamie, Configuration, CDS, front end IPC configuration
|
Tue Aug 27 20:43:34 2013, Koji, Configuration, CDS, front end IPC configuration
|
Wed Aug 28 19:47:28 2013, jamie, Configuration, CDS, front end IPC configuration
|
Wed Aug 28 23:09:55 2013, jamie, Configuration, CDS, code to generate host IPC graph 
|
Mon Aug 19 09:36:32 2013, Koji, Update, Green Locking, Xend green aligned
|
Mon Aug 19 14:22:36 2013, rana, Update, Green Locking, Xend green aligned
|
Mon Aug 19 17:40:32 2013, Steve, Update, Green Locking, Xend green layout corrections  
|
Mon Aug 19 19:08:35 2013, Koji, Update, Green Locking, Xend green layout corrections
|
Tue Aug 20 10:59:15 2013, Steve, Update, Green Locking, Xend green layout corrections 
|
Wed Aug 28 11:15:02 2013, Steve, Update, Green Locking, Xend green layout corrections
|
Mon Aug 19 16:18:56 2013, manasa, Update, Green Locking, Xend green aligned
|
Wed Aug 28 07:33:51 2013, manasa, Update, LSC, MICH locking
|
Wed Aug 28 06:26:28 2013, manasa, Update, Computer Scripts / Programs, ASS req and snap files edited
|
Wed Aug 28 06:17:15 2013, manasa, Update, Computer Scripts / Programs, alias for MATLAB2010
|
Wed Aug 28 00:41:23 2013, Jenne, Update, CDS, CDS svn commits not happening
|
Wed Aug 28 05:21:58 2013, manasa, Update, CDS, CDS svn commits not happening
|
Wed Aug 28 03:28:00 2013, Jenne, Update, LSC, Playing with DRMI, some ASS automation prep
|
Mon Aug 26 19:54:15 2013, manasa, Update, CDS, c1als model modified
|
Tue Aug 27 15:44:08 2013, manasa, Update, CDS, Issues with ALS fixed
|
Tue Aug 27 02:18:28 2013, Jenne, Update, LSC, PRMI, DRMI sensing matrices 
|
Mon Aug 26 19:31:22 2013, manasa, Update, SUS, PRM, ITMY watch dogs
|
Mon Aug 26 18:59:08 2013, Masayuki, Update, LSC, LSCoffset script updated
|
Mon Aug 26 19:13:38 2013, Koji, Update, LSC, LSCoffset script updated
|
Thu Aug 22 02:40:12 2013, Jenne, Update, LSC, DRMI Locked for 1+ minute!!!!!!
|
Thu Aug 22 07:57:57 2013, Lisa, Update, LSC, DRMI Locked for 1+ minute!!!!!!
|
Thu Aug 22 13:03:40 2013, Jenne, Update, LSC, DRMI Locked for 1+ minute!!!!!!
|
Thu Aug 22 10:20:32 2013, kiwamu, Update, LSC, DRMI Locked for 1+ minute!!!!!!
|
Thu Aug 22 13:20:54 2013, Koji, Update, LSC, DRMI Locked for 1+ minute!!!!!!
|
Sat Aug 24 00:11:07 2013, Koji, Update, LSC, DRMI Locked with improved lock streatches
|
Sun Aug 25 06:07:11 2013, rana, Update, LSC, DRMI Locked with improved lock streatches
|
Fri Aug 23 21:01:38 2013, Alex Cole, HowTo, Electronics, Automated Photodetector Frequency Response System
|
Tue May 7 03:14:06 2013, Jenne, Update, SUS, PRM SUS_LSC violin (FM5) set to correct frequency
|
Wed Aug 21 23:50:40 2013, Koji, Update, SUS, PRM SUS_LSC violin (FM5) set to correct frequency
|
Fri Aug 23 01:52:34 2013, Jenne, Update, SUS, Violin filters moved to LSC, from SUS
|
Fri Aug 23 14:19:28 2013, rana, Update, SUS, Violin filters moved to LSC, from SUS
|
Thu Aug 22 21:16:47 2013, Manasa, Update, Green Locking, GTRY normalized
|
Thu Aug 22 22:05:36 2013, rana, Update, Green Locking, GTRY normalized
|
Thu Aug 22 20:25:28 2013, Masayuki, Summary, Green Locking, Y-arm PDH OLTF measurement
|
Wed Aug 21 19:37:25 2013, Masayuki, Summary, Green Locking, X-arm PDH OLTF measurement
|
|