Wed Jan 19 04:25:54 2011, Kevin, Update, Electronics, POX Transfer Functions
|
Wed Jan 19 10:45:00 2011, Koji, Update, Electronics, POX Transfer Functions
|
Wed Jan 19 17:00:23 2011, Kevin, Update, Electronics, POX Transfer Functions
|
Thu Jan 20 01:50:30 2011, Kevin, Update, Electronics, POX Transfer Functions
|
Thu Jan 20 04:03:02 2011, kiwamu, Update, CDS, c1scy error
|
Thu Jan 20 10:15:50 2011, josephb, Update, CDS, c1scy error
|
Thu Jan 20 04:43:28 2011, kiwamu, Update, Green Locking, status update: PLL connected to ADC
|
Thu Jan 20 15:15:39 2011, kiwamu, Update, Green Locking, status update: PLL connected to ADC
|
Thu Jan 20 15:39:59 2011, Aidan, Update, Locking, Upper limit on frequency noise of ADC
|
Thu Jan 20 18:20:55 2011, josephb, Update, CDS, c1iscex computer and c1sus computer swapped
|
Thu Jan 20 22:17:12 2011, rana, Summary, LSC, FPMI Displacement Noise
|
Fri Jan 21 02:45:43 2011, kiwamu, Update, Green Locking, interface for PLL to ADC
|
Thu Jan 20 17:00:39 2011, Aidan, Configuration, Locking, Ballpark figures for Green Locking PLLs (Digital vs Analogue)
|
Fri Jan 21 11:45:01 2011, Aidan, Configuration, Locking, Ballpark figures for Green Locking PLLs (Digital vs Analogue)
|
Fri Jan 21 15:26:15 2011, josephb, Update, CDS, c1sus broken yesterday and now fixed
|
Fri Jan 21 17:59:27 2011, josephb, alex, Update, CDS, Fixed Dolphin transmission
|
Fri Jan 21 23:55:25 2011, rana, Configuration, LSC, Phase Noise Measurement filter
|
Sat Jan 22 01:56:04 2011, Suresh, Update, Green Locking, Examining the stability of VCO PLL at low frequencies 
|
Sat Jan 22 02:03:55 2011, Koji, Update, Green Locking, Examining the stability of VCO PLL at low frequencies
|
Sat Jan 22 02:11:09 2011, kiwamu, Update, Green Locking, some more progress
|
Sat Jan 22 02:23:26 2011, Koji, Update, Green Locking, some more progress
|
Fri Jan 21 23:17:54 2011, rana, HowTo, DAQ, DAQ Wiki Failure
|
Mon Jan 24 10:39:16 2011, josephb, HowTo, DAQ, DAQ Wiki Failure
|
Mon Jan 24 02:58:46 2011, kiwamu, Update, Green Locking, X arm locked ! 
|
Mon Jan 24 09:33:08 2011, rana, Update, Green Locking, X arm locked !
|
Mon Jan 24 13:08:07 2011, kiwamu, Update, Green Locking, Re: X arm locked !
|
Mon Jan 24 10:19:21 2011, Koji, Update, Green Locking, X arm locked !
|
Mon Jan 24 14:27:13 2011, kiwamu, Update, Green Locking, Re: X arm locked !
|
Tue Jan 25 00:09:54 2011, Koji, Update, General, Jenne laser is at PSL Lab
|
Tue Jan 25 06:48:55 2011, kiwamu, Update, Green Locking, To do list
|
Tue Jan 25 15:20:38 2011, josephb, Update, CDS, Updated c1rfm model plus new naming convention for RFM/Dolphin
|
Tue Jan 25 20:42:46 2011, Osamu, Update, Green Locking, Slow servo for green laser
|
Tue Jan 25 21:57:59 2011, Koji, Update, Green Locking, Slow servo for green laser
|
Tue Jan 25 05:26:51 2011, kiwamu, Update, Green Locking, cavity scan
|
Wed Jan 26 02:18:12 2011, Koji, Update, SUS, ETMX length to angle matrix
|
Wed Jan 26 10:11:47 2011, Aidan, Update, Green Locking, cavity scan
|
Tue Jan 25 22:49:13 2011, Koji, Update, CDS, Front End multiple crash
|
Wed Jan 26 10:58:48 2011, josephb, Update, CDS, Front End multiple crash
|
Wed Jan 26 12:03:45 2011, Koji, Update, CDS, Front End multiple crash
|
Wed Jan 26 12:04:31 2011, josephb, Update, CDS, Explanation of why c1sus and c1lsc models crash when the other one goes down
|
Wed Jan 26 14:49:48 2011, Aidan, Update, Environment, Turned on Control room AC
|
Thu Jan 27 03:24:56 2011, Kevin, Update, Electronics, POY Optical Transfer Function 
|
Thu Jan 27 11:04:27 2011, Koji, Update, Green Locking, beat freq scan  
|
Thu Jan 27 15:16:43 2011, josephb, Update, CDS, Updated generate_master_screens.py
|
Thu Jan 27 21:10:47 2011, Osamu, Update, 40m Upgrading, Calibrated noise of green  
|
Thu Jan 27 21:43:37 2011, Koji, Update, Green Locking, no transmission of ALS signals
|
Fri Jan 28 11:08:44 2011, josephb, Update, Green Locking, no transmission of ALS signals
|
Fri Jan 28 12:15:58 2011, josephb, Update, CDS, Updating conlog channel list/ working on "HealthCheck" script
|
Fri Jan 28 13:05:56 2011, Koji, Configuration, Computers, script path fixed
|
Fri Jan 28 15:50:44 2011, Jenne, Configuration, PSL, The PSL has a name!
|
Sun Jan 30 17:15:09 2011, Aidan, Summary, Green Locking, Digital Frequency discriminator - frequency noise
|
Mon Jan 31 07:03:59 2011, Aidan, Summary, Green Locking, DFD - noise spectra
|
Sat Jan 29 03:13:44 2011, rana, Update, WienerFiltering, Improvement in H1 Wiener FF prediction by using weights and taps 
|
Mon Jan 31 10:31:30 2011, josephb, Update, WienerFiltering, Improvement in H1 Wiener FF prediction by using weights and taps
|
Sat Jan 29 00:31:05 2011, Suresh, Update, General, Vertex crane upgrade completed 6x
|
Mon Jan 31 16:12:11 2011, steve, Update, VAC, Vertex crane upgrade shorth coming 
|
Mon Jan 31 07:41:23 2011, Aidan, Update, Green Locking, DFD - medm screen
|
Mon Jan 31 12:40:38 2011, rana, joe, Update, Green Locking, DFD - medm screen
|
Mon Jan 31 18:25:25 2011, Aidan, Update, Green Locking, DFD - results from the new filters (and running with AWG) 
|
Tue Feb 1 15:09:41 2011, Koji, Omnistructure, General, Projector - fixed
|
Tue Feb 1 17:34:21 2011, Jenne, Update, SUS, ETMX and PRM watchdogs tripped 
|
Wed Feb 2 15:07:20 2011, josephb, Update, CDS, activateDAQ.py now includes PEM channels
|
Thu Feb 3 04:43:58 2011, Suresh, Update, Electronics, Added two new DAQ channels
|
Thu Feb 3 01:46:54 2011, Kevin, Update, Electronics, POY Shot Noise and Dark Spectrum
|
Thu Feb 3 11:13:52 2011, Koji, Update, Electronics, POY Shot Noise and Dark Spectrum
|
Thu Feb 3 16:08:06 2011, Aidan, Update, Computer Scripts / Programs, RCG VCO frequency error
|
Thu Feb 3 16:45:28 2011, josephb, Update, CDS, General CDS updates
|
Thu Feb 3 17:25:03 2011, josephb, Update, Computers, rsync script was not really backing up /cvs/cds
|
Fri Feb 4 13:31:16 2011, josephb, Update, CDS, FE start scripts moved to scripts/FE/ from scripts/
|
Fri Feb 4 15:03:20 2011, josephb, Update, Computers, Modified cshrc.40m
|
Fri Feb 4 23:39:56 2011, rana, koji, Update, LSC, mixer based FD set up for noise test
|
Sun Jan 30 19:26:03 2011, Koji, Summary, Green Locking, Prototype freq divider  
|
Wed Feb 2 03:27:20 2011, Koji, Summary, Green Locking, 85MHz Freq divider  
|
Wed Feb 2 09:56:55 2011, Koji, Summary, Green Locking, Installed the freq divider and Rana's PFD 
|
Wed Feb 2 10:44:26 2011, Koji, Summary, Green Locking, Freq fluctuation measured by the freq divider and Rana's analog PFD
|
Wed Feb 2 12:55:34 2011, Koji, Summary, Green Locking, Freq fluctuation measured by the freq divider and Rana's analog PFD
|
Sat Feb 5 23:03:04 2011, rana, koji, Summary, Electronics, Analog Frequency Discriminator: splitter + mixer + long cable  
|
Sun Feb 6 02:29:28 2011, rana, Update, Electronics, Analog MFD: longer cable
|
Fri Feb 4 13:45:25 2011, josephb, Update, Computers, Temporarily removed cronjob for rsync.backup
|
Fri Feb 4 18:58:19 2011, rana, Update, Computers, Temporarily removed cronjob for rsync.backup
|
Mon Feb 7 10:37:28 2011, josephb, Update, Computers, Temporarily removed cronjob for rsync.backup
|
Mon Feb 7 19:21:32 2011, Beard Papa, Metaphysics, Photos, The Adventures of Dr Stochino and Beard Papa
|
Mon Feb 7 21:23:11 2011, rana, Configuration, PSL, PSL FSS Temperature Sensor Interface box removed
|
|