    Reply  Mon Aug 27 23:52:59 2012, Jenne, Update, IOO, MC Spots centered MCdecenter_26Aug2012.png
    Reply  Tue Aug 28 00:23:54 2012, Jenne, Update, PSL, PMC alignment going bad PMC_transmission_GoingDown_27Aug2012.png
    Reply  Tue Aug 28 17:43:04 2012, Jenne, Update, PSL, Power reduced! 
    Reply  Tue Aug 28 17:51:39 2012, Jenne, Update, PSL, PBS and Half Wave plates introduced 
Entry  Tue Aug 28 17:59:03 2012, Jenne, Update, VAC, VENT: GO! 
Entry  Wed Aug 29 21:02:45 2012, Jenne, Update, IOO, Optics between Faraday and PRM are centered, realigned 
Entry  Thu Aug 30 19:08:08 2012, Jenne, Update, VAC, Dogs on BS, ITM chambers checked 
Entry  Thu Aug 30 20:20:52 2012, Jenne, Update, SUS, Watek camera placed on SE viewport of ITMX to look at PRM 
Entry  Thu Aug 30 20:31:35 2012, Jenne, Update, IOO, PZT1 and PZT2 set to center of their ranges 
Entry  Tue Sep 4 11:32:58 2012, Jenne, Update, Locking, Friday in-vac work 
Entry  Tue Sep 4 13:31:55 2012, Jenne, Update, General, The Plan 
Entry  Tue Sep 4 20:03:38 2012, Jenne, Update, General, in-vac progress 
Entry  Tue Sep 4 20:06:04 2012, Jenne, Update, Locking, MC scan input switched to the 11MHz port of EOM 
    Reply  Tue Sep 4 20:13:46 2012, Jenne, Update, General, The Plan - Tues evening version 
Entry  Wed Sep 5 19:29:45 2012, Jenne, Update, General, Yarm aligned to IR incident beam 
    Reply  Thu Sep 6 10:57:27 2012, Jenne, Update, General, Forgot to turn green refl pd back on 
Entry  Thu Sep 6 13:07:02 2012, Jenne, Update, IOO, IPANG no longer a reference :( 
Entry  Thu Sep 6 16:46:44 2012, Jenne, Update, SUS, BS aligned, target removed 
Entry  Thu Sep 6 18:49:30 2012, Jenne, Update, RF System, AS 55 may be broken 
    Reply  Thu Sep 6 19:36:19 2012, Jenne, Update, RF System, AS 55 is fine 
Entry  Fri Sep 7 01:25:53 2012, Jenne, Update, General, PRC, SRC flashing 
    Reply  Fri Sep 7 17:34:53 2012, Jenne, Update, Computers, Sensoray Video Capture 
    Reply  Fri Sep 7 17:37:16 2012, Jenne, Update, , cavitymode scan 
Entry  Sat Sep 8 00:04:53 2012, Jenne, Update, General, Beam scan measurement plan - to do Monday morning. 
Entry  Thu Sep 13 17:19:45 2012, Jenne, Update, SUS, Mirrors being installed on active TTs 
Entry  Thu Sep 13 23:27:14 2012, Jenne, Update, General, Pre-close checklist 
Entry  Fri Sep 14 00:56:13 2012, Jenne, Update, General, DRMI aligned 
    Reply  Fri Sep 14 12:51:43 2012, Jenne, Update, SUS, Need risers for active TTs 
    Reply  Fri Sep 14 18:18:33 2012, Jenne, Update, General, In Vac Pictures mmt2.jpg
    Reply  Fri Sep 14 18:28:25 2012, Jenne, Update, General, In Vac Pictures pzt1_light.jpgmmt1.jpgmmt2.jpgpzt2.jpgippo.jpg
Entry  Sat Sep 15 18:29:25 2012, Jenne, Update, General, More photos taken 
    Reply  Mon Sep 17 13:39:32 2012, Jenne, Update, General, More photos taken AllPhotos_Sept2012.pdf
Entry  Mon Sep 17 20:23:31 2012, Jenne, Update, General, Last of In-vac mirror photos taken 
    Reply  Tue Sep 18 11:53:12 2012, Jenne, Update, General, Last of In-vac mirror photos taken AllPhotos_Sept2012.pdf
Entry  Tue Sep 18 18:24:50 2012, Jenne, Update, General, Scattering in BS chamber or ITMX chamber 
    Reply  Wed Sep 19 01:08:48 2012, Jenne, Update, General, DRMI aligned again DRMI_aligned_19Sept2012_ETMYwasHighNeedToFix.png
    Reply  Wed Sep 19 01:15:15 2012, Jenne, Update, General, Last of In-vac mirror photos taken - NOT! 
Entry  Wed Sep 19 13:12:48 2012, Jenne, Update, IOO, Power into vacuum increased to 75mW 
Entry  Wed Sep 19 19:38:37 2012, Jenne, Update, General, Spot centered on BS, ETMY, ETMX 
Entry  Thu Sep 20 01:28:14 2012, Jenne, Update, General, DRMI aligned again, but with good arms 
    Reply  Thu Sep 20 14:55:06 2012, Jenne, Update, General, Pickoffs are hard to see 
Entry  Thu Sep 20 17:05:26 2012, Jenne, Update, General, REFL, IPANG are coming out of the vac 
    Reply  Thu Sep 20 19:56:05 2012, Jenne, Update, General, Pickoffs are hard to see 
    Reply  Thu Sep 20 20:07:38 2012, Jenne, Update, General, REFL, IPANG are coming out of the vac 
Entry  Fri Sep 21 20:48:24 2012, Jenne, Update, General, POP in-vac optics aligned, POY beam coming out of vac 
Entry  Mon Sep 24 16:59:31 2012, Jenne, Update, VAC, Doors on, ready to pump 
    Reply  Mon Sep 24 17:03:39 2012, Jenne, Update, PEM, 1X1 rack power 
    Reply  Tue Sep 25 14:29:07 2012, Jenne, Update, General, POP in-vac optics aligned, POY beam coming out of vac 
Entry  Tue Sep 25 22:40:55 2012, Jenne, Update, IOO, IPANG ND filter installed 
Entry  Wed Sep 26 01:10:34 2012, Jenne, Update, IOO, PZT2 not working?!?! MC back to normal 