40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 5 of 171  Not logged in ELOG logo
Entry  Mon Apr 18 14:52:47 2022, Ian MacMillan, Summary, SEI, Seismic Study of Buildings and Caltech Campus 7x
    Reply  Thu Apr 21 17:32:35 2022, Ian MacMillan, Summary, SEI, Seismic Study of Buildings and Caltech Campus IMG_1820.jpgScreen_Shot_2022-04-21_at_5.52.51_PM.png
Entry  Wed Apr 20 16:11:08 2022, Koji, Update, SUS, Outpur resistors updated for LO1 coil drivers / for SR2, LO2, AS1, and AS4 in progress 6x
    Reply  Thu Apr 21 15:22:44 2022, Koji, Update, SUS, Outpur resistors updates for SR2, LO2, AS1, and AS4 done 
Entry  Thu Apr 21 11:31:35 2022, JC, Update, VAC, Gauges P3/P4 IMG_0560.jpegIMG_0561.jpeg
Entry  Tue Mar 1 16:01:14 2022, Paco, Update, Electronics, RFSoC 2x2 board -- setup for remote work & BALUN saga balun_adc1.pngPXL_20220302_001734121.jpg
    Reply  Thu Apr 7 20:33:42 2022, Tommy, Update, Electronics, RFSoC 2x2 board -- setup for remote work 
    Reply  Fri Apr 8 16:03:58 2022, rana, Update, Electronics, RFSoC 2x2 board -- setup for remote work & BALUN saga 
       Reply  Wed Apr 20 14:56:06 2022, Tommy, Update, Electronics, RFSoC 2x2 board -- setup for remote work & BALUN saga 
Entry  Mon Apr 18 15:17:31 2022, Jancarlo, Update, General, Tool box and Work Station Organization 
    Reply  Mon Apr 18 23:22:39 2022, Koji, Update, General, Tool box and Work Station Organization PXL_20220419_062101907.jpg
Entry  Mon Oct 25 13:23:45 2021, Anchal, Summary, BHD, Before photos of BSC 
    Reply  Mon Oct 25 17:37:42 2021, Anchal, Summary, BHD, Part I of BHR upgrade - Removed optics from BSC rn_image_picker_lib_temp_44cb790a-c3b4-42aa-8907-2f9787a02acd.jpgrn_image_picker_lib_temp_0fd8f4fd-64ae-4ccd-8422-cfe929d4eeee.jpg
       Reply  Tue Oct 26 16:56:22 2021, Paco, Summary, BHD, Part I of BHR upgrade - Locked PMC and IMC 
          Reply  Wed Oct 27 16:27:16 2021, Anchal, Summary, BHD, Part II of BHR upgrade - Prep OMCNorthBefore.jpegOMCNorthAfter.jpeg
             Reply  Wed Oct 27 16:31:35 2021, Anchal, Summary, BHD, Part III of BHR upgrade - Removal of PR2 Small Suspension 
                Reply  Thu Oct 28 16:32:32 2021, Paco, Summary, BHD, Part IV of BHR upgrade - Removal of BSC eastern optics 
                   Reply  Fri Nov 5 12:21:16 2021, Anchal, Summary, BHD, Part VI of BHR upgrade - Removal of ITMYC optics XendFlowBenchLeftEnd.jpgXendFlowBenchMiddle.jpgXendFlowBenchRightEnd.jpg
                      Reply  Wed Dec 15 16:11:38 2021, Anchal, Summary, BHD, Part VIII of BHR upgrade - Placed LO1 signal-2021-12-15-161437.jpeg
                         Reply  Wed Dec 15 17:44:18 2021, Koji, Summary, BHD, Part VIII of BHR upgrade - Placed LO1 
                            Reply  Thu Jan 6 21:04:41 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO1 OSEMs inserted 
                               Reply  Mon Jan 10 14:52:51 2022, Anchal, Summary, BHD, LO1 OSEMs roughly calibrated and noise measured LO1_vs_ETMX_OSEM_Spectrum_LF_x30_Gain.pdfLO1_vs_ETMX_OSEM_Spectrum_HF_x30_Gain.pdf
                                  Reply  Mon Jan 10 18:36:41 2022, Anchal, Summary, BHD, LO1 free swinging test set to trigger 
                                     Reply  Tue Jan 11 12:19:12 2022, Anchal, Summary, BHD, LO1 Input Matrix Diagonalization performed. LO1_SUS_InpMat_Diagnolization.pdfLO1_FreeSwingData_PeakFitting.pdf
                               Reply  Mon Jan 24 18:53:09 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO2 placed and OSEMs tuned 
                                  Reply  Tue Jan 25 10:55:02 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO2 input matrix diagonalization performed. 
                                     Reply  Tue Jan 25 16:42:03 2022, Anchal, Summary, BHD, Reduced filter gains in all damped new SOS 
                         Reply  Thu Jan 6 11:54:20 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - Placed AS1 and AS4 
                            Reply  Fri Jan 7 16:17:42 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - Placed AS1 and AS4 filters 
                               Reply  Sat Jan 8 16:01:42 2022, Paco, Summary, BHD, Part IX of BHR upgrade - Placed LO2 filters 
                                  Reply  Tue Jan 18 14:26:09 2022, Paco, Summary, BHD, Part IX of BHR upgrade - Placed remaining filters SR2, PR3, PR2 
                               Reply  Tue Jan 11 18:18:29 2022, Anchal, Summary, BHD, Attempted OSEM installation on AS1 
                                  Reply  Tue Jan 11 18:40:25 2022, Anchal, Summary, BHD, AS1 Sat Amp has a PCB issue signal-2022-01-11-184917.jpeg
                                     Reply  Thu Jan 13 09:48:41 2022, Anchal, Summary, BHD, AS1 Sat Amp fixed signal-2022-01-13-094823_001.jpegsignal-2022-01-13-094823_002.jpeg
                                  Reply  Thu Jan 13 12:24:08 2022, Anchal, Summary, BHD, AS1 SD and LR magnets broke 
                                     Reply  Mon Jan 24 21:18:40 2022, Paco, Summary, BHD, Part IX of BHR upgrade - AS1 placed and OSEM tuned 
                                        Reply  Tue Jan 25 11:02:54 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 free swing test failed AS1_freeSwingTestFailed.pdf
                                           Reply  Thu Jan 27 08:27:34 2022, Paco, Summary, BHD, Part IX of BHR upgrade - AS1 inspection and correction 
                                              Reply  Wed Feb 2 16:32:02 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 free swing test still not good AS1_FreeSwingData_PeakFitting_20220125.pdfAS1_SUS_InpMat_Diagnolization_20220202.pdf
                                                 Reply  Tue Mar 15 18:42:37 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 resuspended and OSEMs tuned 
                                                    Reply  Tue Mar 15 18:45:12 2022, Anchal, Summary, BHD, Part X of BHR upgrade - BHDBS Path setup 
                            Reply  Thu Jan 13 12:29:27 2022, Anchal, Summary, BHD, AS4 LR magnet broke 
                               Reply  Fri Jan 14 18:12:47 2022, Anchal, Summary, BHD, AS4 placed in ITMY Chamber, OSEMs connected 
                                  Reply  Tue Jan 18 18:19:22 2022, Koji, Summary, BHD, AS4 placed in ITMY Chamber, OSEMs connected Screen_Shot_2022-01-18_at_17.48.16.pngcable_swap.png
                                     Reply  Wed Jan 19 12:56:52 2022, Paco, Summary, BHD, AS4 OSEMs installation 
                                        Reply  Thu Jan 20 16:42:55 2022, Paco, Update, BHD, AS4 OSEMs installation - part 2 
                                           Reply  Thu Jan 20 18:16:29 2022, Anchal, Update, BHD, AS4 set to trigger free swing test 
                                              Reply  Fri Jan 21 16:40:10 2022, Anchal, Update, BHD, AS4 Input Matrix Diagonalization performed.  AS4_SUS_InpMat_Diagnolization_20220121.pdfAS4_FreeSwingData_PeakFitting_20220121.pdf
                                                 Reply  Mon Jan 24 17:12:27 2022, rana, Update, BHD, AS4 Input Matrix Diagonalization performed.  
                                                    Reply  Mon Jan 24 20:48:48 2022, Anchal, Update, BHD, AS4 Input Matrix Diagonalization performed.  
                   Reply  Tue Jan 18 15:19:49 2022, Paco, Summary, BHD, Part IV of BHR upgrade - Replaced old SR3 with SOS SR2. OSEM tuning attemtped. PXL_20220119_012954365.jpgPXL_20220119_013003522.jpg
                      Reply  Tue Jan 18 18:16:28 2022, Anchal, Summary, BHD, Part IV of BHR upgrade - SR2 Sat Amp Box inspection 
                         Reply  Wed Jan 19 12:50:10 2022, Anchal, Summary, BHD, Part IV of BHR upgrade - SR2 OSEM tuning progress. 
                            Reply  Thu Jan 20 17:03:36 2022, Anchal, Summary, BHD, Part IV of BHR upgrade - SR2 OSEM tuned. DJI_0144.JPG
                               Reply  Thu Jan 20 18:41:55 2022, Anchal, Summary, BHD, SR2 set to trigger free swing test 
                                  Reply  Fri Jan 21 11:24:42 2022, Anchal, Summary, BHD, SR2 Input Matrix Diagonalization performed.  SR2_SUS_InpMat_Diagnolization_20220121.pdfSR2_FreeSwingData_PeakFitting_20220121.pdf
                Reply  Thu Oct 28 17:01:54 2021, Anchal, Summary, BHD, Part III of BHR upgrade - Adding temp fixed flat mirror for PR2 
                Reply  Thu Jan 27 17:57:35 2022, Anchal, Summary, BHD, Part III of BHR upgrade - Replaced small suspended PR3 with new SOS PR3 and OSEM tuning 
                   Reply  Thu Jan 27 18:03:36 2022, Paco, Summary, BHD, Part III of BHR upgrade - Install PR2, balance, and attempt OSEM tuning 
                      Reply  Thu Jan 27 20:46:38 2022, Koji, Summary, BHD, Part III of BHR upgrade - Install PR2, balance, and attempt OSEM tuning Screen_Shot_2022-01-27_at_20.33.56.pngScreen_Shot_2022-01-27_at_21.30.16.png
                         Reply  Fri Jan 28 10:37:59 2022, Paco, Summary, BHD, Part III of BHR upgrade - PR2 OSEM finalized, reinsall LO1 OSEMs 
                            Reply  Fri Jan 28 11:30:52 2022, Koji, Summary, BHD, Part III of BHR upgrade - PR2 OSEM finalized, reinsall LO1 OSEMs 
                               Reply  Fri Jan 28 16:35:18 2022, Anchal, Summary, BHD, AS1, PR2 and PR3 set to trigger free swing test 
                            Reply  Wed Feb 2 16:22:00 2022, Anchal, Summary, BHD, Part III of BHR upgrade - PR2 inpute matrix diagonalized PR2_FreeSwingData_PeakFitting_20220125.pdfPR2_SUS_InpMat_Diagnolization_20220202.pdf
                   Reply  Wed Feb 2 16:27:57 2022, Anchal, Summary, BHD, Part III of BHR upgrade - PR3 inpute matrix diagonalized PR3_FreeSwingData_PeakFitting_20220125.pdfPR3_SUS_InpMat_Diagnolization_20220202.pdf
             Reply  Wed Oct 27 16:38:02 2021, Anchal, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment 
                Reply  Wed Oct 27 18:11:37 2021, Koji, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment 
                Reply  Wed Oct 27 18:16:45 2021, Koji, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment 
             Reply  Thu Mar 17 17:23:22 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment 
                Reply  Mon Mar 21 18:24:07 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
                   Reply  Thu Mar 24 19:20:28 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
                      Reply  Fri Mar 25 18:20:28 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
                         Reply  Sat Mar 26 13:04:38 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
                            Reply  Thu Mar 31 18:58:16 2022, Ian MacMillan, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm 
                               Reply  Tue Apr 5 18:15:06 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm 
                                  Reply  Wed Apr 6 01:20:48 2022, Koji, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm PXL_20220406_060846581.jpgPXL_20220406_014205726.jpgPXL_20220406_060324812.jpgPXL_20220406_015259326.jpg
                                     Reply  Wed Apr 6 22:51:47 2022, Koji, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm PXL_20220406_213356237.MP.jpgPXL_20220406_212936502.MP.jpg
                                  Reply  Wed Apr 6 12:03:51 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Yarm 
                                     Reply  Thu Apr 7 17:59:51 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Yarm 
                                        Reply  Fri Apr 8 17:21:31 2022, Ian MacMillan, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Yarm 
                                           Reply  Mon Apr 11 21:13:21 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging 
                                              Reply  Mon Apr 11 21:44:14 2022, Koji, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging D990543A1.PDFPXL_20220412_023941730.jpgPXL_20220412_023950567.jpg
                                                 Reply  Thu Apr 14 11:52:57 2022, yehonathan, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging Screenshot_2022-04-14_15-53-39.pngPXL_20220414_220616875.jpg
                                                    Reply  Thu Apr 14 18:39:13 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging 
                                                       Reply  Mon Apr 18 17:53:45 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging 
Entry  Fri Apr 15 11:59:16 2022, Yehonathan, Update, IOO, IMC completely misaligned 
Entry  Thu Apr 14 09:04:30 2022, Jordan, Update, VAC, RGA Volume RGA Scans 40mRGA_Overlay.pdfRGAVolume_4_12_22.PNG
Entry  Wed Apr 13 15:57:25 2022, Ian MacMillan, Update, Cameras, Camera Battery Test 
    Reply  Wed Apr 13 18:55:54 2022, Koji, Update, Cameras, Camera Battery Test 
Entry  Wed Apr 13 16:23:54 2022, Ian MacMillan, Update, General, Smell in 40m 
Entry  Mon Apr 11 11:00:30 2022, Jancarlo, Update, VAC, C1VAC Reboot and Nitrogen tanks 
Entry  Thu Apr 7 20:41:15 2022, Tommy, Update, Electronics, RFSoC 2x2 Board -- Gain Plotter Screen_Shot_2022-04-07_at_8.40.23_PM.pngUnknown-3.pngUnknown-4.png
Entry  Thu Apr 7 20:37:06 2022, Tommy, Update, Electronics, RFSoC 2x2 Board -- Simple Tone Generator 
Entry  Wed Mar 9 11:52:18 2022, Yehonathan, Update, BHD, Simplified BHD readout sketch on ITMY table ITMY_Table_Sketch.drawio.pdf
    Reply  Wed Mar 9 12:57:52 2022, Koji, Update, BHD, Simplified BHD readout sketch on ITMY table 
    Reply  Fri Apr 1 14:26:50 2022, Tega, Update, Optical Levers, Simplified sketch on MC table MC_Table.drawio.pdf
       Reply  Fri Apr 1 17:02:02 2022, Koji, Update, Optical Levers, Simplified sketch on MC table 
          Reply  Fri Apr 1 22:22:29 2022, Koji, Update, Optical Levers, Simplified sketch on MC table 
             Reply  Mon Apr 4 15:49:06 2022, Tega, Update, Optical Levers, Simplified sketch on BS table BS_Table.drawio.pdf
Entry  Wed Oct 20 11:16:21 2021, Anchal, Summary, PEM, Particle counter setup near BS Chamber PXL_20211020_183728734.jpg
    Reply  Thu Oct 21 11:41:31 2021, Anchal, Summary, PEM, Particle counter setup near BS Chamber ParticleCountData20211021.pdf
       Reply  Thu Oct 21 15:22:35 2021, rana, Summary, PEM, Particle counter setup near BS Chamber 
    Reply  Thu Oct 21 15:24:35 2021, rana, Summary, PEM, Particle counter setup near BS Chamber 
       Reply  Fri Oct 22 17:35:08 2021, Ian MacMillan, Summary, PEM, Particle counter setup near BS Chamber 
          Reply  Fri Apr 1 14:26:19 2022, Ian MacMillan, Summary, PEM, Particle counter setup near BS Chamber IMG_1407.jpg
             Reply  Sat Apr 2 15:46:13 2022, rana, Summary, PEM, Particle counter setup near BS Chamber 
Entry  Tue Mar 29 17:35:54 2022, Paco, Update, SUS, Damping fix on BS, AS4, PR2, and PR3 
Entry  Tue Mar 29 15:07:11 2022, Tega, Summary, VAC, Opening of MC and ETM chambers 
Entry  Tue Feb 22 18:47:51 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement ALL_TF_Graph.pdf20220222_SUSElectronicsReplacement.7z
    Reply  Fri Feb 25 14:00:08 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement IMG_0853.jpgIMG_0852.jpg
       Reply  Fri Feb 25 14:48:53 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement Before.jpgAfter.jpg
          Reply  Sat Feb 26 23:48:14 2022, Koji, Update, SUS, ETMY SUS Electronics Replacement PXL_20220226_023111179_2.jpg
             Reply  Mon Feb 28 15:51:07 2022, Ian MacMillan, Update, SUS, ETMY 1Y4 Electronics Replacement IMG_0865.jpgIMG_0867.jpgIMG_0868.jpgIMG_0866.jpg
                Reply  Thu Mar 3 04:11:36 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement PXL_20220303_082726693.jpgPXL_20220303_082752494.jpgPXL_20220303_082744464.jpg
                   Reply  Thu Mar 3 04:24:23 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement PXL_20220303_094421604.jpgPXL_20220303_094435127.jpg
                      Reply  Thu Mar 3 17:21:11 2022, Ian MacMillan, Update, SUS, ETMY 1Y4 Electronics Replacement 
                         Reply  Sat Mar 5 02:03:46 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement 6x
                            Reply  Mon Mar 21 14:22:52 2022, Anchal, Update, SUS, ETMY Alignmnet offsets needed to be changed 
       Reply  Tue Mar 1 19:26:24 2022, Koji, Update, SUS, ETMY SUS Electronics Replacement PXL_20220302_025723651.jpgPXL_20220302_030102033.MP.jpg
    Reply  Mon Mar 7 16:44:15 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement 6x
       Reply  Fri Mar 11 16:43:03 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement 
          Reply  Fri Mar 25 11:39:14 2022, Anchal, Update, SUS, ETMY SUS Electronics Replacement - Questions 
             Reply  Mon Mar 28 16:25:34 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement - Questions 
    Reply  Thu Mar 17 11:40:41 2022, Paco, Update, SUS, ETMY green PZT HV supply 
Entry  Thu Mar 17 16:50:53 2022, Paco, Update, BHD, XARM AUX alignment 
    Reply  Fri Mar 18 17:15:19 2022, Paco, Update, BHD, XARM AUX alignment cont. Screen_Shot_2022-03-18_at_4.09.38_PM.png
       Reply  Mon Mar 21 18:00:05 2022, Ian MacMillan, Update, BHD, XARM AUX alignment cont. PXL_20220322_015247138.jpg
Entry  Tue Mar 15 13:49:44 2022, Ian MacMillan, Bureaucracy, Treasure, New Screwdriver Bits 
Entry  Tue Mar 15 10:45:31 2022, Paco, Update, General, Assembled small in-vac optics 
Entry  Thu Mar 10 10:05:49 2022, Paco, Update, SUS, AS1 free swing test SUS_Input_Matrix_Diagonalization.pdf
Entry  Thu Mar 10 09:39:59 2022, Jordan, Update, VAC, Leak Testing of New Manual Gate Valve - Attempt #2 3-09-2022.PNG3-10-2022.PNG
Entry  Wed Mar 9 10:23:28 2022, Jordan, Update, VAC, Leak Testing of New Manual Gate Valve - Attempt #1 
Entry  Tue Feb 2 17:09:17 2021, yehonathan, Update, BHD, SOS assembly 20210202_165501.jpg20210202_162452.jpg
    Reply  Tue Feb 2 18:24:54 2021, Koji, Update, BHD, SOS assembly 
       Reply  Thu Feb 4 15:14:55 2021, Yehonathan, Update, BHD, SOS assembly 20210204_144007.jpg
          Reply  Tue Feb 16 13:13:39 2021, Yehonathan, Update, BHD, SOS assembly 
             Reply  Tue Feb 16 15:29:01 2021, Koji, Update, BHD, SOS assembly 
                Reply  Tue Feb 16 22:59:36 2021, Yehonathan, Update, BHD, SOS assembly 
                   Reply  Fri Feb 19 12:21:04 2021, Yehonathan, Update, BHD, SOS assembly 
                      Reply  Fri Mar 26 10:25:37 2021, Yehonathan, Update, BHD, SOS assembly 
                         Reply  Tue Apr 6 15:42:57 2021, Yehonathan, Update, BHD, SOS assembly 20210406_150724.png
                            Reply  Fri Apr 9 20:54:54 2021, Yehonathan, Update, BHD, SOS assembly 20210409_202717.jpg20210409_202755.jpg
                               Reply  Mon Apr 12 17:30:11 2021, Yehonathan, Update, BHD, SOS assembly 20210412_170913.jpg
                                  Reply  Mon May 3 16:49:04 2021, Yehonathan, Update, BHD, SOS assembly 20210503_161422.png20210503_161456.jpg
                                     Reply  Tue Jun 1 16:17:06 2021, Yehonathan, Update, BHD, SOS assembly 
                                        Reply  Wed Jun 2 01:03:19 2021, Koji, Update, BHD, SOS assembly 
                                           Reply  Fri Jun 18 19:02:00 2021, Yehonathan, Update, BHD, SOS assembly 20210618_115017.jpgUntitled_2.png20210618_160041_HDR.jpg
                                              Reply  Fri Jun 18 23:53:08 2021, Koji, Update, BHD, SOS assembly 
                                                 Reply  Tue Jun 22 17:05:26 2021, Yehonathan, Update, BHD, SOS assembly 
                                                    Reply  Tue Jul 27 17:14:18 2021, Yehonathan, Update, BHD, SOS assembly 20210727_154506.png
                                                       Reply  Tue Jul 27 20:12:53 2021, Koji, Update, BHD, SOS assembly 
                                              Reply  Mon Jun 28 12:35:19 2021, Yehonathan, Update, BHD, SOS assembly toomuchglue1.pngtoomuchglue2.pngdirtydumbell.pngcleandumbell.pngassembly_on_metalbracket.png
                                                 Reply  Tue Jun 29 20:45:52 2021, Yehonathan, Update, BHD, SOS assembly 20210629_135736.jpg20210629_135746.jpg
                                                    Reply  Thu Jul 1 16:45:25 2021, Yehonathan, Update, BHD, SOS assembly 
                                                       Reply  Wed Jul 28 12:00:35 2021, Yehonathan, Update, BHD, SOS assembly 
                                                          Reply  Thu Sep 23 18:18:07 2021, Yehonathan, Update, BHD, SOS assembly dumbell_before.pngdumbell_after.png
                                                             Reply  Tue Oct 26 10:17:14 2021, Yehonathan, Update, BHD, SOS assembly 
                                                                Reply  Thu Oct 28 23:13:19 2021, Yehonathan, Update, BHD, SOS assembly OpLev_Setup.jpgsuspended_optic.png20211029_113011.jpg20211029_113052.jpg
                                                                   Reply  Tue Nov 2 15:02:03 2021, Yehonathan, Update, BHD, SOS assembly FreeSwingingSpectra.pdf
                                                                      Reply  Tue Nov 2 22:50:30 2021, Koji, Update, BHD, SOS assembly 
                                                                         Reply  Mon Nov 8 17:22:27 2021, Yehonathan, Update, BHD, SOS assembly Magnets_Positions.pngAdapters_Order.png
                                                                            Reply  Tue Nov 9 11:11:37 2021, Yehonathan, Update, BHD, SOS assembly 20211109_110408.jpg
                                                                               Reply  Fri Nov 12 23:47:29 2021, Yehonathan, Update, BHD, SOS assembly 
                                                                                  Reply  Tue Nov 16 17:42:46 2021, Yehonathan, Update, BHD, SOS assembly 20211115_170320_HDR.jpg20211116_163846.jpgmagnet_height_check(1).pngside_blcok_touching_1.pngside_blcok_touching_2.png
                                                                                     Reply  Tue Nov 16 18:28:53 2021, Koji, Update, BHD, SOS assembly D2100546_Wire_Block.pdfD2100546_Wire_Block.png
                                                                                        Reply  Wed Nov 24 14:15:15 2021, Yehonathan, Update, BHD, SOS assembly 
                                                                                           Reply  Wed Dec 1 12:57:08 2021, Yehonathan, Update, BHD, SOS assembly 7x
                                                                                              Reply  Mon Dec 6 18:23:04 2021, Yehonathan, Update, BHD, SOS assembly signal-2021-12-06-165751_001.jpeg
                                                                                                 Reply  Thu Dec 9 21:57:35 2021, Yehonathan, Update, BHD, SOS assembly balancingsos2.pngFreeSwingingSpectra.pdf
                                                                                                    Reply  Tue Dec 14 14:02:33 2021, Yehonathan, Update, BHD, SOS assembly magnetcentring.pngFreeSwingingSpectra.pdf
                                                                                                       Reply  Wed Dec 15 22:09:53 2021, Yehonathan, Update, BHD, SOS assembly 
                                                                                                          Reply  Thu Dec 16 18:16:36 2021, Yehonathan, Update, BHD, SOS assembly chippedmirror.pngIMG_6311.JPGIMG_6310.JPGIMG_6309.JPG
                                                                                                             Reply  Fri Dec 17 17:50:17 2021, Yehonathan, Update, BHD, SOS assembly AS1rollbalance.pngAS1Magnet_height.pngghostbeam.pnglambdaopticarrow.jpg
                                                                                                                Reply  Fri Dec 17 19:16:45 2021, Koji, Update, BHD, SOS assembly 
                                                                                                                   Reply  Fri Dec 17 22:16:07 2021, Yehonathan, Update, BHD, SOS assembly 
                                                                                                                      Reply  Sat Dec 18 00:56:14 2021, Koji, Update, BHD, SOS assembly 
                                                                                                                         Reply  Mon Dec 20 13:52:01 2021, Koji, Update, BHD, SOS assembly 
                                                                                                                            Reply  Mon Dec 20 17:26:13 2021, Yehonathan, Update, BHD, SOS assembly 7x
                                                                                                                               Reply  Tue Dec 21 18:04:46 2021, Yehonathan, Update, BHD, SOS assembly 
                                                                                                                                  Reply  Tue Jan 4 18:27:23 2022, Paco, Update, BHD, SOS assembly -- PR3 PR3_roll_balance.pngPR3_magnet_height.pngFreeSwingingSpectra.pdfPXL_20220104_231742123.jpgPXL_20220104_232809203.jpg
                                                                                                                                     Reply  Wed Jan 5 19:18:06 2022, Yehonathan, Update, BHD, SOS assembly -- AS4 AS4_roll_balance.pngAS_4_magnet_height.pngFreeSwingingSpectra.pdf
                                                                                                                                        Reply  Thu Jan 6 17:00:20 2022, Yehonathan, Update, BHD, SOS assembly -- LO2 LO2_roll_balance.pngLO2_magnet_height.pngFreeSwingingSpectra.pdf
                                                                                                                                           Reply  Thu Jan 6 17:16:51 2022, Yehonathan, Update, BHD, Using Peek screws/nuts 
                                                                                                                                           Reply  Fri Jan 7 17:59:45 2022, Yehonathan, Update, BHD, SOS assembly -- SR2 SR2_roll_balance.pngSR2_magnet_height.pngFreeSwingingSpectra.pdf
                                                                                                                                              Reply  Fri Jan 7 18:24:25 2022, Koji, Update, BHD, SOS assembly -- SR2 
                                                                                                                                                 Reply  Mon Jan 10 14:00:44 2022, not Koji, Update, BHD, SOS assembly -- SR2 
                                                                                                                                                    Reply  Tue Jan 11 09:53:14 2022, not Koji, Update, BHD, SOS assembly -- Peek screws and nuts 
                                                                                                                                                       Reply  Thu Jan 13 16:08:00 2022, Yehonathan, Update, BHD, gluing magnets after AS1/4 misfortune 
                                                                                                                                                          Reply  Fri Jan 14 17:33:10 2022, Yehonathan, Update, BHD, AS4 resurrection AS4_roll_balance2.pngAS4_magnet_height2.pngFreeSwingingSpectra.pdf
                                                                                                                                                             Reply  Wed Jan 19 18:15:34 2022, Yehonathan, Update, BHD, AS1 resurrection AS1_roll_balance2.pngAS1_magnet_heigh2.pngFreeSwingingSpectra.pdfIMG_6324.JPG
                                                                                                                                                                Reply  Thu Jan 20 12:10:51 2022, Yehonathan, Update, BHD, AS1 resurrection FreeSwingingSpectra.pdfFreeSwingingSpectra_div_20mV.pdfFreeSwingingSpectra_div_50mV.pdf
                                                                                                                                                                   Reply  Mon Jan 24 17:58:21 2022, Yehonathan, Update, BHD, PR2 Suspension 
                                                                                                                                                                      Reply  Tue Jan 25 18:37:12 2022, TYehonathan, Update, BHD, PR2 Suspension PR2_magnet_height.pngPR2_roll_balance.pngFreeSwingingSpectra_div_50mV.pdf
                                                                                                                                                                         Reply  Thu Feb 24 18:05:58 2022, Yehonathan, Update, BHD, Re-susspension of AS1 signal-2022-02-24-173933_003.jpegsignal-2022-02-24-173933_002.jpeg
                                                                                                                                                                            Reply  Wed Mar 2 14:02:43 2022, Yehonathan, Update, BHD, Re-susspension of AS1 
                                                                                                                                                                               Reply  Thu Mar 3 17:09:46 2022, Paco, Update, BHD, Re-susspension of AS1 
                                                                                                                                                                                  Reply  Mon Mar 7 16:56:08 2022, Yehonathan, Update, BHD, Re-susspension of AS1 signal-2022-03-07-171520_001.pngsignal-2022-03-07-172659_001.jpegsignal-2022-03-07-172659_003.jpeg
                                                                                                                                                                                     Reply  Mon Mar 7 18:53:16 2022, Koji, Update, BHD, Re-susspension of AS1 
                                                                                                                                                                                     Reply  Tue Mar 8 12:24:13 2022, Yehonathan, Update, BHD, Re-susspension of AS1 AS1_Roll_Balance.pngAS1_Height_Balance.pngFreeSwingingSpectra_new.pdf
                                                                                                                                                                                        Reply  Tue Mar 8 19:29:36 2022, Paco, Update, BHD, Re-balance of AS1 
                                                                                                                                                                                           Reply  Wed Mar 9 09:35:26 2022, Paco, Update, BHD, Re-balance of AS1 
Entry  Sat Feb 26 01:01:40 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels 
    Reply  Sat Feb 26 15:45:14 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels Vac-gauges-flow-diagram.png
       Reply  Mon Feb 28 19:15:10 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels 
       Reply  Tue Mar 1 20:38:49 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels Working_Serial_Port_List_1.pngWorking_Serial_Port_List_2.pngWorking_Config_Ports#1-5.pngWorking_Config_Ports#7-8.png
          Reply  Wed Mar 2 11:50:39 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels XGS600_IOLAN_settings_1.pngXGS600_IOLAN_settings_2.pngXGS600_USBserial_settings.pngXGS600_comm_test.pyXGS600_comm_test_result.txt
             Reply  Wed Mar 2 12:40:08 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels 6x
                Reply  Sun Mar 6 18:14:45 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels iolan_xgs_comm_investigation.pdf
                   Reply  Mon Mar 7 13:53:40 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels iolan_xgs_comm_live.pdf
                      Reply  Mon Mar 7 14:52:34 2022, Koji, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels 
                         Reply  Tue Mar 8 12:08:47 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels XGS600_calibration.pdf
Entry  Mon Mar 7 10:06:32 2022, Yehonathan, Update, IOO, IMC unlocked again, completely misaligned Screenshot_2022-03-07_10-15-19.png
    Reply  Mon Mar 7 14:55:33 2022, Koji, Update, IOO, IMC unlocked again, completely misaligned 
Entry  Sat Mar 5 01:58:49 2022, Koji, Summary, CDS, paola rescue PXL_20220305_035255834.jpgPXL_20220305_034649120.MP.jpg
Entry  Fri Mar 4 18:12:44 2022, Koji, Update, VAC, RGA pumping down Screenshot_2022-03-04_19-38-11.png
Entry  Mon Feb 7 09:00:26 2022, Paco, Update, General, Scheduled power outage recovery 
    Reply  Mon Feb 7 15:32:48 2022, Yehonathan, Update, General, Y End laser controller 
    Reply  Mon Feb 7 16:53:02 2022, Koji, Update, General, Scheduled power outage recovery PXL_20220208_001646282.jpgPXL_20220208_001657871.jpg
       Reply  Wed Feb 9 11:56:24 2022, Anchal, Update, General, Bringing back CDS Screenshot_2022-02-09_12-11-33.png
          Reply  Wed Feb 9 13:55:05 2022, Koji, Update, General, Bringing back CDS 
       Reply  Wed Feb 9 16:43:35 2022, Paco, Update, General, Scheduled power outage recovery - Locking mode cleaner(s) 
          Reply  Thu Feb 10 15:41:00 2022, Anchal, Update, General, Scheduled power outage recovery - Locking mode cleaner(s) 
             Reply  Thu Feb 10 17:57:48 2022, Anchal, Update, General, Scheduled power outage recovery - Locking mode cleaner(s) PXL_20220211_021509819.jpg
                Reply  Thu Feb 10 19:03:23 2022, Koji, Update, General, Scheduled power outage recovery - Locking mode cleaner(s) 
                   Reply  Thu Feb 10 19:46:37 2022, Koji, Update, General, Scheduled power outage recovery - Locking mode cleaner(s) 
                      Reply  Thu Feb 10 21:10:43 2022, Koji, Update, General, Video Mux setting reset Screenshot_2022-02-10_21-11-21.pngScreenshot_2022-02-10_21-11-54.png
             Reply  Fri Feb 11 16:09:11 2022, Anchal, Update, General, Scheduled power outage recovery - Input power increased 
                Reply  Mon Feb 14 18:31:50 2022, Paco, Update, General, Scheduled power outage recovery - IMC recovery progress 
                   Reply  Tue Feb 15 19:32:50 2022, Koji, Update, General, Scheduled power outage recovery - IMC recovery progress PXL_20220216_001731377.jpgScreen_Shot_2022-02-15_at_16.18.16.pngPXL_20220216_001727465.jpgScreen_Shot_2022-02-15_at_16.22.16.pngPXL_20220216_002229572.jpg
                      Reply  Tue Feb 15 19:40:02 2022, Koji, Update, General, IMC locking 
                         Reply  Wed Feb 16 15:19:41 2022, Anchal, Update, General, Reconfigured MC reflection path for low power 
                            Reply  Wed Feb 23 15:08:57 2022, Anchal, Update, General, Removed extra beamsplitter in MC WFS path 
                               Reply  Thu Feb 24 14:32:57 2022, Anchal, Update, General, MC RFPD DCMON channel got stuck to 0 
                                  Reply  Thu Feb 24 19:26:32 2022, Anchal, Update, General, IMC Locking 
                                     Reply  Sun Feb 27 00:37:00 2022, Koji, Update, General, IMC Locking Recovery PXL_20220226_093809056.jpgPXL_20220226_093854857.jpgPXL_20220226_100859871.jpgScreenshot_2022-02-26_01-56-31.pngScreenshot_2022-02-26_01-56-47.png
                                        Reply  Sun Feb 27 01:12:46 2022, Koji, Update, General, IMC manual alignment procedure PXL_20220226_100859871.jpg
    Reply  Fri Feb 11 11:17:00 2022, Anchal, Update, General, Scheduled power outage recovery 
       Reply  Mon Feb 14 21:03:25 2022, Koji, Update, General, Scheduled power outage recovery PXL_20220215_025325118.jpg
Entry  Mon Feb 14 18:43:49 2022, Paco, Summary, General, SOS materials clean room cleared 
Entry  Thu Feb 10 21:51:02 2022, Koji, Update, CDS, [Solved] Huge random numbers flowing into ETMX/ETMY ASC PIT/YAW Screenshot_2022-02-10_21-46-02.pngScreen_Shot_2022-02-10_at_21.54.21.pngScreen_Shot_2022-02-10_at_22.14.23.png
    Reply  Fri Feb 11 10:56:38 2022, Anchal, Update, CDS, [Solved] Huge random numbers flowing into ETMX/ETMY ASC PIT/YAW 
       Reply  Fri Feb 11 12:22:19 2022, rana, Update, CDS, [Solved] Huge random numbers flowing into ETMX/ETMY ASC PIT/YAW 
          Reply  Fri Feb 11 17:07:19 2022, Anchal, Update, CDS, [Solved] Huge random numbers flowing into ETMX/ETMY ASC PIT/YAW 
Entry  Thu Feb 10 21:16:27 2022, Koji, Summary, CDS, chiara resolv.conf wierdo 
Entry  Thu Feb 10 14:39:31 2022, Koji, Summary, Computers, Network security issue resolved PXL_20220210_220816955.jpgPXL_20220210_220827167.jpg
Entry  Tue Nov 9 13:40:02 2021, Ian MacMillan, Summary, Computer Scripts / Programs, SUS Plant Plan for New Optics 
    Reply  Tue Nov 9 16:55:52 2021, Ian MacMillan, Summary, Computer Scripts / Programs, SUS Plant Plan for New Optics IMG_8107.JPG
       Reply  Tue Nov 9 18:05:03 2021, Ian MacMillan, Summary, Computer Scripts / Programs, SUS Plant Plan for New Optics 
          Reply  Mon Nov 15 15:12:28 2021, Ian MacMillan, Summary, Computer Scripts / Programs, SUS Plant Plan for New Optics 
             Reply  Tue Nov 16 17:29:49 2021, Ian MacMillan, Summary, Computer Scripts / Programs, SUS Plant Plan for New Optics x_x_TF1.pdf
                Reply  Thu Nov 18 20:00:43 2021, Ian MacMillan, Summary, Computer Scripts / Programs, SUS Plant Plan for New Optics Final_Plant_Testing.zip
                   Reply  Mon Nov 22 16:38:26 2021, Tega, Summary, Computer Scripts / Programs, SUS Plant Plan for New Optics 
                      Reply  Mon Jan 24 17:10:25 2022, Tega, Summary, Computer Scripts / Programs, SUS Plant Plan for New Optics Screen_Shot_2022-01-24_at_5.33.15_PM.png
                         Reply  Thu Jan 27 16:40:57 2022, Tega, Summary, Computer Scripts / Programs, SUS Plant Plan for New Optics simplant_control_1.pngsimplant_control_0.png
                            Reply  Thu Feb 3 17:15:23 2022, Tega, Summary, Computer Scripts / Programs, SUS Plant Plan for New Optics Screen_Shot_2022-02-03_at_8.23.07_PM.png
                               Reply  Wed Feb 9 14:34:27 2022, Ian, Summary, Computer Scripts / Programs, SUS Plant Plan for New Optics SummaryMdemScreen.png
Entry  Mon Feb 7 16:14:37 2022, Tega, Update, Computers, realtime system reboot problem 
Entry  Fri Feb 4 10:21:39 2022, Anchal, Summary, General, Complete lab shutdown Vac_Status_Screenshot_2022-02-04_10-19-24.png
Entry  Fri Feb 4 10:04:47 2022, Chub, Update, General, dish soap and clean scrub sponges! 40m_supplies.jpg
Entry  Thu Feb 3 14:47:12 2022, Chub, Update, Electronics, new UPS in place 
Entry  Thu Feb 3 10:25:59 2022, Jordan, Update, VAC, TP1 and Manual Gate Valve Install 20220203_101455.jpg20220203_094831.jpg20220203_094823.jpg
Entry  Thu Jan 20 17:34:07 2022, Koji, Update, BHD, V6-704/705 Mirror now @Downs PXL_20220120_225248265_2.jpgPXL_20220120_225309361_2.jpg
    Reply  Fri Jan 21 14:51:00 2022, Koji, Update, BHD, V6-704/705 Mirror now @Downs M1.PNGM1_30mm.PNGM2.PNGM2_30mm.PNG
       Reply  Tue Feb 1 20:16:09 2022, Tega, Update, BHD, PR2 candidate mirror analysis PR2_M2_data.pngPR2_M2_recon_FoV_10mm.pngPR2_M2_residual_FoV_10mm.png
Entry  Mon Jan 31 10:39:19 2022, Jordan, Update, VAC, TP1 and Manual Gate Valve Removal 20220131_100637.jpg20220131_102807.jpg20220131_102818.jpg20220131_100647.jpg
Entry  Mon Jan 24 12:33:41 2022, rana, Configuration, Wiki, AIC Wiki: txz files allowed 
Entry  Thu Jan 6 22:18:47 2022, Koji, Update, CDS, SUS screen debugging Screen_Shot_2022-01-06_at_18.03.24.png
    Reply  Tue Jan 11 10:46:07 2022, Tega, Update, CDS, SUS screen debugging 
       Reply  Fri Jan 21 12:46:31 2022, Tega, Update, CDS, SUS screen debugging Custom_ADC_DAC_monitors.png
Entry  Tue Jan 11 10:58:58 2022, Tega, Update, SUS, Temporary watchdog 
    Reply  Tue Jan 11 13:43:14 2022, Koji, Update, SUS, Temporary watchdog 
    Reply  Wed Jan 19 21:39:22 2022, Tega, Update, SUS, Temporary watchdog 
       Reply  Thu Jan 20 00:26:50 2022, Koji, Update, SUS, Temporary watchdog 
       Reply  Thu Jan 20 17:21:21 2022, Tega, Update, SUS, Temporary watchdog 
Entry  Tue Jan 4 18:26:59 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission 
    Reply  Wed Jan 5 17:46:04 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission 
       Reply  Mon Jan 10 18:20:45 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission 
          Reply  Tue Jan 11 15:21:16 2022, Anchal, Update, BHD, PR2 transmission calculation LO_power_vs_PR2_transmission.pdfPRC_Gain_vs_PR2_transmission.pdfPRS_Trans_Calc.ipynb.zip
             Reply  Thu Jan 13 17:10:55 2022, Anchal, Update, BHD, PR2 transmission calculation LO_power_vs_PR2_transmission.pdfPRC_Gain_vs_PR2_transmission.pdfPR2_Trans_Calc.ipynb.zip
                Reply  Fri Jan 14 03:07:04 2022, Koji, Update, BHD, PR2 transmission calculation 
                   Reply  Fri Jan 14 11:00:29 2022, Anchal, Update, BHD, PR2 transmission calculation 
                      Reply  Fri Jan 14 13:46:25 2022, Anchal, Update, BHD, PR2 transmission calculation updated LO_power_vs_PR2_transmission.pdfPRC_Gain_vs_PR2_transmission.pdfPR2_Trans_Calc.ipynb.zip
                         Reply  Wed Jan 19 16:22:48 2022, Anchal, Update, BHD, PR2 transmission calculation updated PR2transmissionSelectionAnalysis.pdfPR2_Trans_Calc.ipynb.zip
                            Reply  Thu Jan 20 01:48:02 2022, Koji, Update, BHD, PR2 transmission calculation updated 
Entry  Wed Jan 19 14:41:23 2022, Koji, Update, BHD, Suspension Status 
Entry  Fri Jan 14 14:04:51 2022, Paco, Update, Electronics, RFSoC 2x2 board arrived PXL_20220114_211249499.jpg
Entry  Thu Dec 16 15:04:12 2021, Chub, Update, Electronics, ITMX feedthroughs and in-vac cables installed ITMX_feedthrough_install_12-16-21.jpg
    Reply  Thu Dec 16 15:54:08 2021, Koji, Update, Electronics, ITMX feedthroughs and in-vac cables installed PXL_20211216_235056582.jpg
    Reply  Mon Jan 10 15:45:55 2022, Paco, Update, Electronics, ITMY feedthroughs and in-vac cables installed - part I 
       Reply  Tue Jan 11 10:23:18 2022, Paco, Update, Electronics, ITMY feedthroughs and in-vac cables installed - part II 
          Reply  Tue Jan 11 14:21:53 2022, Paco, Update, Electronics, BS feedthroughs and in-vac cables installed 
             Reply  Fri Jan 14 12:01:21 2022, Anchal, Update, Electronics, BS & ITMY feedthroughs labeled and connected to Sat Amps 
Entry  Tue Dec 14 19:29:42 2021, Paco, Update, BHD, 1Y0 rack work for LO1 
    Reply  Mon Jan 3 12:05:08 2022, Paco, Update, BHD, 1Y0 rack work for LO2 AS1 AS4 
       Reply  Mon Jan 3 16:46:41 2022, Paco, Update, BHD, 1Y1 rack work for SR2, PR2, PR3 
          Reply  Fri Jan 7 17:54:13 2022, Anchal, Update, BHD, PR2 Sat Amp has a bad channel Screen_Shot_2022-01-07_at_6.05.39_PM.png
             Reply  Fri Jan 7 18:28:13 2022, Koji, Update, BHD, PR2 Sat Amp has a bad channel 
                Reply  Mon Jan 10 13:35:52 2022, Anchal, Update, BHD, PR2 Sat Amp has a bad channel 
                   Reply  Mon Jan 10 15:59:46 2022, Koji, Update, BHD, PR2 Sat Amp has a bad channel 6x
                      Reply  Mon Jan 10 17:04:47 2022, Anchal, Update, BHD, AS1 Sat Amp CH2 had offset 
ELOG V3.1.3-