40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 59 of 344  Not logged in ELOG logo
    Reply  Tue Mar 11 15:21:08 2014, Koji, Summary, LSC, Composite Error Signal for ARms (1) 
Entry  Mon Mar 17 12:02:55 2014, Koji, Summary, General, IFO recovery / confirmed ETMX in trouble MCspots.png
    Reply  Mon Mar 17 20:14:34 2014, Koji, Summary, General, IFO recovery / confirmed ETMX in trouble ETMX_UL.JPGETMX_UR.JPGETMX_LR.JPGETMX_LL.JPG
Entry  Tue Mar 18 21:19:22 2014, Koji, Summary, IOO, MC spot positions checked MCASS.png
    Reply  Wed Mar 19 21:37:45 2014, manasa, Summary, LSC, Attempt to lock PRMIsb with REFL165I&Q 
    Reply  Wed Mar 26 11:16:59 2014, ericq, Summary, LSC, Composite Error Signal for ARms (3) simlink.pdfsimulatedCESARLock.pdf
Entry  Wed Mar 26 14:54:32 2014, Koji, Summary, LSC, PRMIsb locked with REFL165I&Q again 
    Reply  Wed Mar 26 21:51:42 2014, ericq, Summary, LSC, PRMIsb locked with REFL165I&Q again 
    Reply  Fri Mar 28 17:22:55 2014, Koji, Summary, LSC, PRMIsb locked with REFL165I&Q again 
Entry  Fri Mar 28 20:23:02 2014, rana, Summary, IOO, MC2 moved 
    Reply  Mon Mar 31 11:34:00 2014, manasa, Summary, IOO, MC2 moved 
    Reply  Mon Mar 31 13:15:55 2014, manasa, Summary, LSC, Alignment update 
    Reply  Mon Mar 31 17:47:57 2014, ericq, Summary, LSC, MICH sensing oddities in REFL 3F REFL_33_traj.pdfREFL_165_traj.pdf
    Reply  Mon Mar 31 21:23:30 2014, Gabriele, Summary, LSC, MICH sensing oddities in REFL 3F 
Entry  Mon Mar 31 23:57:22 2014, Koji, Summary, ASC, PRM ASC characterization / design 7x
    Reply  Tue Apr 1 21:45:01 2014, Jenne, Summary, LSC, PRM violin notch not at correct freq? 
Entry  Tue Apr 1 22:03:44 2014, Koji, Summary, ASC, New PRM ASC is running 
    Reply  Wed Apr 2 19:50:12 2014, Koji, Summary, ASC, New PRM ASC is running 
    Reply  Wed Apr 2 23:08:51 2014, Koji, Summary, ASC, New PRM ASC is running PRM_QPD.pdfQPD_spe.pdf
Entry  Thu Apr 3 18:55:10 2014, ericq, Summary, LSC, Some CARM related modeling asIsPRCRes.pdfidealPRCRes.pdf3fPrclAnglesCarm.pdf
    Reply  Fri Apr 4 18:51:29 2014, ericq, Summary, LSC, MORE CARM related modeling 9x
    Reply  Thu Apr 10 10:52:15 2014, manasa, Summary, IOO, MC2_TRANS path in WFS servo 
Entry  Mon Apr 21 23:33:57 2014, rana, Summary, Green Locking, HP 8591E reads low by 140 Hz out of 10 MHz 
    Reply  Fri Apr 25 23:08:57 2014, rana, Summary, IOO, MC2_TRANS QPD Servo re-re-engaged again 
    Reply  Sat Apr 26 13:19:59 2014, ericq, Summary, IOO, MC2_TRANS QPD Servo re-re-engaged again 
    Reply  Mon Apr 28 15:47:57 2014, manasa, Summary, IOO, MC2_TRANS QPD Servo trend MC_TRANSservoApr28.png
    Reply  Mon Apr 28 20:31:38 2014, rana, Summary, IOO, MC2_TRANS QPD Servo trend Untitled.png
    Reply  Wed Apr 30 21:57:07 2014, rana, Summary, IOO, MC2_TRANS QPD Servo now on for real dolphin.pngMC2_QPD_trend.png
Entry  Wed May 7 23:09:06 2014, rana, jamie, Summary, Computer Scripts / Programs, Ottavia back on network 
Entry  Thu May 8 17:00:56 2014, rana, Q, Summary, LSC, REFL_DC handoff didn't work last night 
Entry  Fri May 9 01:36:28 2014, rana, Summary, SUS, Optical Lever QPD Sum trends: they're almost all too weak OLtrend.png
    Reply  Fri May 9 04:51:13 2014, ericq, Summary, LSC, REFL_DC handoff didn't work last night 
    Reply  Mon May 12 22:42:19 2014, rana, Summary, SUS, Optical Lever QPD Sum trends: they're almost all too weak OL-FB.pngarms_140512.pdf
    Reply  Mon May 12 22:52:59 2014, Jenne, Summary, SUS, Optical Lever Filters are all different OpLevFilters.pdf
    Reply  Tue May 13 13:27:58 2014, Steve, Summary, SUS, Optical Lever Servos setting table OLsums.png
    Reply  Tue May 13 17:03:05 2014, Steve, Summary, SUS, ETMX oplev laser replaced 
    Reply  Tue May 13 17:31:32 2014, Jenne, Summary, SUS, ETMX oplev laser replaced: New oplev gains set OLerr_13May2014.pdfOLfb_13May2014.pdf
    Reply  Tue May 13 22:55:57 2014, Jenne, Summary, SUS, ETMX oplev: cleanup 
    Reply  Wed May 14 10:04:06 2014, Steve, Summary, SUS, oplev laser and temperature TempRules.png
    Reply  Tue May 20 09:12:25 2014, Steve, Summary, SUS, ETMX oplev qpd board ETMXOLQPD121.jpgETMXOLQPDface121.jpgETMXolSUM.png
    Reply  Tue May 20 15:54:39 2014, rana, Summary, SUS, ETMX oplev qpd board 
Entry  Mon Jun 9 10:55:48 2014, Nichin, Summary, Electronics, BBPD D1002969-v8 transimpedence measurement PD_transimpedence_measurement.pngresults.pdfcode_and_data.zip
    Reply  Mon Jun 9 16:55:31 2014, Koji, Summary, Electronics, BBPD D1002969-v8 transimpedence measurement 
Entry  Mon Jun 16 12:58:50 2014, manasa, Summary, IOO, Ringdown recap  Ringdown_815.pdfMCringdown_cum.pdfcum_plot.png
    Reply  Mon Jun 16 15:32:12 2014, rana, Summary, IOO, Ringdown recap  
Entry  Wed Jun 25 02:01:21 2014, Nichin, Summary, General, Weekly Report Nichin_Week4_update.pdf
Entry  Mon Jul 14 13:03:23 2014, Akhil, Summary, Electronics, Timing Issues of Mini Circuits UFC-6000: Solved 0.2timinganalysis.png0.3timinganalysis.png0.5timinganalysis.png1stiminganalysis.pngpdf.zip
    Reply  Mon Jul 14 14:28:27 2014, Koji, Summary, Electronics, Timing Issues of Mini Circuits UFC-6000: Solved 
    Reply  Tue Jul 15 01:31:13 2014, Akhil, Summary, Electronics, Timing Issues of Mini Circuits UFC-6000: Solved qnoise.pngqnoise.pdf
Entry  Wed Jul 16 01:18:02 2014, rana, Summary, LSC, Python Wavelet peak finding for dramatic ALS - Red Resonance finding speedup findRedResonance.pdf
ELOG V3.1.3-