Wed Dec 22 17:24:50 2010, steve, Configuration, VAC, slow pumpdown at 12 hours
|
Wed Dec 22 21:38:47 2010, kiwamu, Configuration, VAC, Re:slow pumpdown at 12 hours
|
Thu Dec 23 13:30:09 2010, steve, Configuration, VAC, slow pumpdown complete
|
Thu Dec 23 12:19:43 2010, kiwamu, Update, Green Locking, installed doubling oven base at PSL table  
|
Thu Dec 23 18:51:37 2010, rana, Update, Green Locking, installed doubling oven base at PSL table
|
Fri Dec 24 09:01:33 2010, josephb, Update, CDS, Borrowed ADC
|
Thu Dec 23 22:13:50 2010, Koji, Update, General, PZT HV turned on
|
Fri Dec 31 12:41:02 2010, rana, Update, General, IR flashes
|
Sat Jan 1 16:36:16 2011, rana, Configuration, SUS, rampdown.pl was not running
|
Wed Dec 8 14:51:09 2010, josephb, Update, CDS, c1pem now recording data
|
Sat Jan 1 19:13:40 2011, rana, Update, CDS, c1pem now recording data
|
Wed Dec 29 18:53:11 2010, rana, Summary, elog, found hung - restarted
|
Mon Jan 3 10:32:27 2011, kiwamu, Summary, elog, found hung - restarted
|
Tue Jan 4 15:12:33 2011, Suresh, Update, IOO, MC Trans Mon QPD gain decreased by 10
|
Tue Jan 4 02:58:53 2011, Jenne, Update, IOO, Power into Mode Cleaner increased
|
Tue Jan 4 11:06:32 2011, Koji, Update, IOO, Power into Mode Cleaner increased
|
Tue Jan 4 13:57:48 2011, kiwamu, Update, IOO, incident mirror changed from 45deg to 0 deg
|
Wed Jan 5 03:06:02 2011, kiwamu, Update, IOO, beam spots on MC mirrors
|
Tue Jan 4 18:37:18 2011, Jenne, Update, IOO, MCWFS aligned
|
Tue Jan 4 21:21:57 2011, kiwamu, Update, IOO, PZTs are connected to c1iscaux
|
Wed Jan 5 16:11:17 2011, kiwamu, Summary, IOO, temporary PZT connection
|
Wed Jan 5 21:19:29 2011, Zach, Update, elog, restarted
|
Wed Jan 5 00:23:30 2011, rana, Summary, DAQ, FrameBuilder fails in a new way
|
Wed Jan 5 16:00:11 2011, rana, alex, Summary, DAQ, FrameBuilder fails in a new way
|
Wed Jan 5 22:14:41 2011, rana, Summary, DAQ, FrameBuilder fails in a new way
|
Wed Jan 5 23:22:00 2011, Jenne, Update, Cameras, Aligned the Xarm, no big deal 
|
Wed Jan 5 23:37:12 2011, rana, Update, Cameras, Aligned the Xarm, no big deal
|
Wed Jan 5 23:45:33 2011, Jenne, Update, Cameras, Aligned the Xarm, no big deal
|
Thu Jan 6 00:03:05 2011, Koji, Update, Cameras, Aligned the Xarm, no big deal
|
Thu Jan 6 00:06:01 2011, Jenne, Update, IOO, Magical absorbing PZT mirror
|
Sat Dec 18 06:24:49 2010, rana, Update, elog, restarted
|
Sat Dec 18 23:33:06 2010, Koji, Update, elog, restarted
|
Sun Dec 19 11:19:42 2010, Koji, Update, elog, restarted
|
Sun Dec 19 22:45:28 2010, rana, Update, elog, restarted
|
Wed Jan 5 10:45:51 2011, Koji, Update, elog, restarted
|
Thu Jan 6 10:47:11 2011, Koji, Update, elog, ELOG fixed (re: restarted)
|
Fri Jan 7 00:14:36 2011, kiwamu, Update, IOO, EOM triple resonant box is working
|
Fri Jan 7 00:49:16 2011, Jenne, Update, Green Locking, Recovered Xarm Green Lock, Preparation for Beat Note Measurement
|
Fri Jan 7 12:01:39 2011, Osamu, Update, Computers, c1lsc running
|
Fri Jan 7 15:17:37 2011, steve, Update, Cameras, ITMX video monitor has tower wide view
|
Wed Dec 8 12:26:56 2010, josephb, Update, CDS, megatron set up - as a test front end
|
Sat Jan 8 21:12:12 2011, rana, Update, CDS, Megatron is back 
|
Sat Jan 8 23:18:03 2011, rana, Update, Computers, network table
|
Sun Jan 9 15:50:55 2011, rana, HowTo, PSL, Setting the PMC gain
|
Mon Jan 10 16:39:36 2011, josephb, alex, rolf, Update, CDS, New Time server for frame builder and 1PPS
|
Mon Jan 10 16:47:08 2011, josephb, alex, rolf, Update, CDS, Fixed c1lsc dolphin reflected memory
|
Tue Jan 11 11:19:13 2011, josephb, Summary, CDS, Storing FE harddrives down Y arm
|
Tue Jan 11 11:39:45 2011, steve, Update, VAC, RGA is turned on
|
Tue Jan 11 14:05:11 2011, josephb, Update, Computers, Martian host table updated daily
|
Tue Jan 11 16:04:17 2011, josephb, Update, CDS, Script to update web views of models for all installed front ends
|
Tue Jan 11 17:08:43 2011, Suresh, Configuration, PSL, replaced the pzt-steering mirror on PSL
|
Tue Jan 11 21:08:19 2011, Joonho, Summary, Cameras, CCD cables upgrade plan.
|
Tue Jan 11 01:05:29 2011, kiwamu, Update, LSC, obtained Xarm PDH signal
|
Wed Jan 12 01:39:49 2011, kiwamu, Update, LSC, locked X arm
|
Wed Jan 12 02:41:19 2011, kiwamu, Update, General, daytime tasks for tomorrow
|
Wed Jan 12 17:22:47 2011, Suresh, Configuration, Locking, MC demod phase adjusted to minimise the I output
|
Wed Jan 12 22:19:54 2011, Koji, Update, IOO, MC flakiness solved
|
Wed Jan 12 17:50:21 2011, josephb, Update, CDS, Worked on c1lsc, MC2 screens
|
Wed Jan 12 22:33:24 2011, kiwamu, Update, CDS, MC2 dewhitening are healthy except for UR
|
Tue Jan 11 18:41:43 2011, Jenne, Update, IOO, Put MC PZT offset onto MC board, instead of on awkward cart
|
Wed Jan 12 01:38:52 2011, Koji, Update, IOO, Put MC PZT offset onto MC board, instead of on awkward cart
|
Wed Jan 12 22:39:16 2011, Suresh, Update, IOO, Put MC PZT offset onto MC board, instead of on awkward cart  
|
Thu Jan 13 14:21:13 2011, josephb, Update, CDS, Webview of front end model files automated
|
Thu Jan 13 16:34:02 2011, josephb, Update, Computers, 32 bit matlab updated
|
Thu Jan 13 16:41:07 2011, josephb, Update, CDS, Channel names for LSC updated
|
Fri Jan 14 12:29:57 2011, Koji, Update, Locking, Next steps for the green
|
Fri Jan 14 01:55:26 2011, kiwamu, Update, LSC, X arm locked with C1LSC digital control
|
Fri Jan 14 11:29:00 2011, kiwamu, Update, LSC, expected open loop TF of X arm locking
|
Fri Jan 14 12:34:08 2011, Koji, Update, LSC, X arm locked with C1LSC digital control
|
Fri Jan 14 17:13:39 2011, josephb, Update, Cameras, Pylon driver for Basler Cameras installed on Megatron
|
Fri Jan 14 17:58:50 2011, Osamu, Configuration, General, Standalone RT setup
|
Fri Jan 14 20:37:00 2011, kiwamu, HowTo, Green Locking, plan for this month
|
Sun Jul 27 20:49:21 2008, rana, Configuration, Computers, NTP
|
Fri Sep 25 19:56:08 2009, rana, Configuration, Computers, NTPD restarted on c1dcuepics (to fix the MEDM screen times)
|
Mon Jan 17 04:10:10 2011, rana, Configuration, Computers, NTPD restarted on c1dcuepics (to fix the MEDM screen times)
|
Mon Jan 17 15:31:50 2011, josephb, Update, Cameras, Test the Basler acA640-100gm camera
|
Mon Jan 17 20:13:38 2011, rana, Update, Electronics, POX_11 Optical TF
|
Tue Jan 18 10:25:23 2011, steve, Update, PEM, vertex crane work this week
|
Sun Jan 16 02:20:59 2011, Suresh, Update, Locking, comparing the PSL with the X-end-NPRO through the green beat   
|
Wed Jan 19 03:37:30 2011, Suresh, Update, Locking, comparing the PSL with the X-end-NPRO through the green beat
|
Wed Jan 19 10:31:24 2011, josephb, Update, elog, Elog restarted again
|
Thu Jan 20 00:39:22 2011, kiwamu, HowTo, CDS, DAQ setup : another trick
|
|