40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 57 of 341  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  4760   Mon May 23 12:27:26 2011 kiwamuUpdateLSCDRMI trial : details(PRMI
locking with slightly misaligned SRM)
 First I tried locking PRC and
  
  4757   Sat May 21 06:19:46 2011 kiwamuUpdateLSCDRMI trial : no luckI will try with POY55 that Koji prepared
today.
  
  4759   Mon May 23 00:36:51 2011 kiwamuUpdateLSCDRMI trial : sucessEventually the
D
  
  11632   Tue Sep 22 03:48:18 2015 ericqUpdateLSCDRMI tweaked, briefly held with ALS armsGiven the RF component power supply grounding,
POP110, POP22 and REFL165 all changed somewhat.
They have all been rephased for the DRMI,
  
  252   Tue Jan 22 02:33:45 2008 robUpdateLSCDRMI work
0) The ETMY oplev needs work/centering
  
  366   Mon Mar 10 02:05:08 2008 robUpdateLockingDRMI+2ARMs working better
Some encouraging progress on the locking
front tonight.  After the work on the DRM
  
  10859   Tue Jan 6 17:41:20 2015 JenneConfigurationCDSDTT doesn't do envelopes??[Jenne, Diego]
We are working on trying out the
UGF servos, and wanted to take loop measurements
  
  2045   Fri Oct 2 18:04:45 2009 robUpdateCDSDTT no good for OMC channelsI took the output of the OMC DAC and plugged
it directly into an OMC ADC channel to see
if I could isolate the OMC DAC weirdness
 omc_dac_dtt.pngomc_dac_sweepTDS.pngomc_dac_dtt_ts.png 
  1718   Tue Jul 7 16:06:59 2009 ClaraUpdateComputer Scripts / ProgramsDTT synchronization errors, help would be appreciatedI am attempting to use the DTT program
to look at the coherence of the individual
accelerometer signals with the MC_L signal.
  
  14007   Fri Jun 22 15:13:47 2018 gautamUpdateCDSDTT workingSeems like DTT also works now. The trick
seems to be to run 
 Screenshot_from_2018-06-22_15-12-37.png 
  14008   Fri Jun 22 15:22:39 2018 sudoUpdateCDSDTT working


Quote:


  
  3107   Wed Jun 23 15:33:42 2010 josephbUpdateCDSDaily Downs UpdateI visited downs and announced that I would
be showing up again until all the 40m hardware
is delivered. 
  
  3119   Fri Jun 25 08:10:23 2010 josephbUpdateCDSDaily Downs UpdateYesterday afternoon I went to downs and
acquired the following materials:
2 100 ft long blue fibers, for use
  
  3134   Tue Jun 29 12:08:43 2010 josephbUpdateCDSDaily Downs UpdateI talked with Rolf, and asked if we were
using Megatron for IO.  The gist boiled
down to we (the 40m) needed to use it for
  
  3158   Tue Jul 6 11:57:06 2010 josephbUpdateCDSDaily Downs UpdateI went to talk to Rolf and Jay this morning. 
I asked Rolf if a chassis was available,
so he went over and disconnected one of his
  
  3177   Thu Jul 8 14:32:42 2010 josephbUpdateCDSDaily Downs UpdateAfter talking with Rolf, and clarifying
exactly which machine I wanted, he gave me
an 4600 Sun machine (similar to our current
  
  3136   Tue Jun 29 14:19:44 2010 josephbUpdateCDSDaily Downs Update (Part 2)I picked up the ribbon cable connectors
from Jay.  It looks like we'll have
to make the new cables for connecting the
  
  2845   Mon Apr 26 12:24:58 2010 josephbUpdateGeneralDaily Downs updateTalked with Jay briefly this morning.
We are due another 1-U 4 core (8
CPU) machine, which is one of the ones currently
  
  2871   Mon May 3 15:39:39 2010 josephbUpdateCDSDaily Downs updateTalked with Jay briefly today.  Apparently
there are 3 IO chassis currently on the test
stand at Downs and undergoing testing (or
  
  5145   Mon Aug 8 22:12:58 2011 NicoleSummarySUSDaily SummaryToday I balanced the mirror, finished putting
together the second photosensor, and finished
my photosensor circuit box! 
 frontview.jpgfrontview.jpg 
  7203   Thu Aug 16 13:04:36 2012 LizSummaryComputer Scripts / ProgramsDaily Summary DetailsI just wrote a short description of
  
  7108   Tue Aug 7 18:38:50 2012 LizUpdateComputer Scripts / ProgramsDaily Summary Pages are in their final form!Please check the summary   
  16940   Wed Jun 22 18:55:31 2022 yutaUpdateLSCDaily alignment work; POY trouble solved[Koji, Yuta]

I found that Yarm cannot be locked
 Screenshot_2022-06-22_17-17-42_XYaligned.pngScreenshot_2022-06-22_18-58-26_Transmission.png 
  16941   Wed Jun 22 19:41:13 2022 KojiUpdateLSCDaily alignment work; POY trouble solvedBefore the final measurement of the DC
values for the transmissions, I aligned the
PMC. This made the PMC trans increased from
  
  6675   Thu May 24 14:49:59 2012 KojiSummaryGeneralDaily news ideaTop tab categolies:

    Summary
    CDS

   
        CDS Status
  
  
  11319   Fri May 22 11:59:54 2015 ericqUpdateSUSDampRestore script problemPRM watchdog tripped, but the damprestore.py
script wouldn't run. 

It turns out the script tries to
  
  11320   Fri May 22 12:09:57 2015 ranaUpdateSUSDampRestore script problemI will move it back. We need to fix our
scripts to not use any users/ libraries ever
again.
  
  16748   Tue Mar 29 17:35:54 2022 PacoUpdateSUSDamping fix on BS, AS4, PR2, and PR3[Ian, Paco]


We removed the "cheby"
filters from AS4, PR2 and PR3 which had been
  
  12515   Thu Sep 22 22:52:08 2016 ericqUpdateGeneralDamping found to be onJust a heads up, it looks like the damping
came on at around 8:30pm. Not sure why. 
  
  10623   Fri Oct 17 15:17:31 2014 jamieUpdateCDSDaqd "fixed"?I very tentatively declare that this particular
daqd crapfest is "resolved" after
Jenne rebooted fb and daqd has been running
  
  10624   Fri Oct 17 16:54:11 2014 jamieUpdateCDSDaqd "fixed"?

    

       
            
  
  10633   Thu Oct 23 01:39:34 2014 JenneUpdateCDSDaqd "fixed"?Merging of threads. 
ChrisW figured out that it looks
like the problem with the frame builder is
  
  10616   Thu Oct 16 03:18:48 2014 JenneUpdateCDSDaqd segfaulting again The daqd
process on the frame builder looks like it
  
  10617   Thu Oct 16 12:22:43 2014 ericqUpdateCDSDaqd segfaulting againI've been trying to figure out why daqd
keeps crashing, but nothing is fixed yet. 
I commented out the line in /etc/inittab
  
  4320   Thu Feb 17 23:56:53 2011 josephbUpdateCDSDaqd was rebuilt, now reverted.As one of the trouble shooting steps for
the daqd (i.e. framebuilder) I rebuilt the
daqd executable.  My guess is somewhere
  
  2095   Thu Oct 15 02:38:10 2009 rana, robUpdateOMCDark Port Mode Scan using the OMCBottom trace is proportional to the OMC
PZT voltage - top trace is the transmitted
light through the OMC. Interferometer is
 OMC-ModeScan_091015.png 
  519   Wed Jun 4 16:57:12 2008 josephbConfigurationCamerasDark images from cameras (electronics noise measurement)The attached pdfs are 1 second and 1 millisecond
long integrations from the GC650 and GC750
cameras with a cap in place - i.e. no light.
 GC650_1sec_dark.pdfGC650_1msec_dark.pdfGC750_1sec_dark.pdfGC750_1msec_dark.pdfGC650_1sec_dark_zoom.pdf 
  7330   Fri Aug 31 17:44:21 2012 ManasaUpdateRingdownData

    

       
            
 cum_plot.png 
  10274   Sat Jul 26 10:12:19 2014 AkhilUpdateGeneralData Acquisition from FC into EPICS Channels I succeeded in creating a new channel
access server hosted on domenica ( R Pi)
for continuous data acquisition from the
  
  10276   Sat Jul 26 13:38:34 2014 JamieUpdateGeneralData Acquisition from FC into EPICS Channels

    

       
            
  
  10277   Sat Jul 26 14:35:28 2014 AkhilUpdateGeneralData Acquisition from FC into EPICS Channels

    

       
            
  
  10200   Tue Jul 15 01:41:43 2014 JenneUpdateLSCData for DARM on sqrtInv investigationI took some data tonight for a quick look
at what combinations of DC signals might
be good to use for DARM, as an alternative
  
  10208   Wed Jul 16 01:04:09 2014 JenneUpdateLSCData for DARM on sqrtInv investigationI realized while I was looking at last
night's data that I had been doing CARM sweeps,
when really I wanted to be doing DARM sweeps. 
  
  2775   Tue Apr 6 11:27:11 2010 AlbertoUpdateComputer Scripts / ProgramsData formats in the Agilent AG4395a Spectrum AnalyzerLately I've been trying to sort out the
problem of the discrepancy that I noticed
between the values read on the spectrum analyzer's
  
  2776   Tue Apr 6 16:55:28 2010 AlbertoUpdateComputer Scripts / ProgramsData formats in the Agilent AG4395a Spectrum Analyzer


   
        
            
  
  7746   Mon Nov 26 18:56:34 2012 JenneHowToComputersData logging suggestionsWe've been talking for a while about how
we want to store data.  I'm not in love
with keeping it on the elog, although I think
  
  11444   Fri Jul 24 18:12:52 2015 Max IsiUpdateGeneralData missingFor the past couple of days, the summary
pages have shown minute trend data disappear
at 12:00 UTC (05:00 AM local time). This
 C1-ALL_FBDB3F_TIMESERIES-1121731217-86400.png 
  11455   Tue Jul 28 17:07:45 2015 JamieUpdateGeneralData missing


  
  10973   Wed Feb 4 18:16:44 2015 KojiUpdateLSCData transfer rate of c1lsc reduced from ~4MB/s to ~3MB/sc1lsc had 60 full-rate (16kS/s) channels
to record. This yielded the LSC to FB connection
to handle 4MB/s (mega-byte) data rate.
  
  13801   Mon Apr 30 23:13:12 2018 KevinUpdateComputer Scripts / ProgramsDataViewer leapsecondsI was trying to plot trends (min, 10 min,
and hour) in DataViewer and got the following
error message
  
ELOG V3.1.3-