40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 55 of 344  Not logged in ELOG logo
    Reply  Mon Apr 25 12:55:19 2011, Jenne, Bureaucracy, Computers, wiki? 
Entry  Thu May 5 00:08:59 2011, Jenne, Update, LSC, (Almost) New Screens for RFPDs 
Entry  Thu May 5 13:12:06 2011, Jenne, Update, PSL, Temperature drift, trying to shield PMC with foil PSL_Temp_drift_5May2011.pngP5050092small.jpg
Entry  Thu May 5 13:13:32 2011, Jenne, Update, LSC, New RFPD screens are in 
    Reply  Thu May 5 14:50:30 2011, Jenne, Update, LSC, chans file for LSC 
Entry  Wed May 11 22:54:53 2011, Jenne, Update, Treasure, ETMY trans QPD installed 
    Reply  Sun May 15 21:27:51 2011, Jenne, Update, Photos, ETMY optical bench 
Entry  Thu May 19 00:15:20 2011, Jenne, Update, elog, Restarted, Italian-style 
Entry  Fri Jun 10 12:04:57 2011, Jenne, Update, RF System, Bad RF connections!! 
    Reply  Mon Jun 13 16:27:10 2011, Jenne, Update, Electronics, Seismometer Box Update/graphs NewSeisBoxNoise.png
Entry  Wed Jun 15 02:20:00 2011, Jenne, Update, Locking, MICH noise budget? MICH_noise_budget_measurements_15June2011.jpg
Entry  Wed Jun 15 16:37:56 2011, Jenne, Update, PEM, PEM AA Board has been diagnosed and fixed 1X7_AAboard_connector_fix.pdf
Entry  Thu Jun 23 22:39:34 2011, Jenne, Update, PSL, PMC found unlocked 
Entry  Tue Jun 28 02:11:47 2011, Jenne, Update, Locking, Latest MICH noise budget MICH_noise_budget_as_of_28June2011.png
    Reply  Wed Jun 29 11:13:13 2011, Jenne, Update, SUS, issues in the current quad maglev system 
Entry  Thu Jun 30 01:50:02 2011, Jenne, Update, SUS, ITMX whitening, ETMX left free swinging 
    Reply  Thu Jul 7 02:23:59 2011, Jenne, Summary, LSC, LSC Whitening Filters have been fit AS55Q.png
    Reply  Thu Jul 7 15:34:44 2011, Jenne, Summary, LSC, LSC Whitening Filters have been fit 
Entry  Sun Jul 17 18:23:23 2011, Jenne, Update, PSL, Found the PMC unlocked PMCunlocked_17July2011.png
Entry  Mon Jul 18 14:39:53 2011, Jenne, Update, Computers, LSC PD chans acquired 
Entry  Mon Jul 18 20:59:19 2011, Jenne, Update, LSC, Big ol' mess 
Entry  Tue Jul 26 03:15:52 2011, Jenne, Update, Locking, Latest MICH noise budget MICHnoise_shotNoise_25July2011.pdfMICH_darkNoise_whiteningGainChanging_25July2011.pdf
Entry  Thu Jul 28 02:33:04 2011, Jenne, Update, Locking, Yarm flashing, but not yet locked 
Entry  Tue Aug 2 10:53:03 2011, Jenne, Omnistructure, SAFETY, Regular door out of service. Use Control Room Door only!! 
Entry  Tue Aug 2 11:02:52 2011, Jenne, Update, SUS, PRM Watchdog tripped 
Entry  Wed Aug 3 01:30:04 2011, Jenne, Update, LSC, Absolute length of Xarm and Yarm measured 
Entry  Sun Aug 7 14:11:53 2011, Jenne, Update, PEM, Particle counts through the roof ParticleCount_High_7Aug2011.png
    Reply  Sun Aug 7 18:41:12 2011, Jenne, Update, Green Locking, X green beam re-aligned 
    Reply  Wed Aug 10 02:29:38 2011, Jenne, Update, SUS, ETMY exploration 
Entry  Wed Aug 10 18:25:45 2011, Jenne, Update, SUS, ETMY mini-update 
Entry  Thu Aug 11 02:16:57 2011, Jenne, Update, Green Locking, Y-green aligned and flashing 
Entry  Fri Aug 12 15:46:51 2011, Jenne, Update, SUS, Earthquake stop procedure 
Entry  Fri Aug 12 17:37:11 2011, Jenne, Update, SUS, ETMY hopefully good again 
    Reply  Fri Aug 12 20:28:13 2011, Jenne, Update, SUS, ETMY hopefully good again 
Entry  Sun Aug 14 19:06:50 2011, Jenne, Update, elog, elog dead. Brought back to life 
    Reply  Mon Aug 15 13:16:50 2011, Jenne, Update, SUS, Re: ETMY hopefully good again 
Entry  Mon Aug 15 14:10:56 2011, Jenne, Update, SUS, Monday SUS update 7x
    Reply  Tue Aug 16 17:09:55 2011, Jenne, Update, General, today's work to do 
    Reply  Wed Aug 17 15:55:01 2011, Jenne, Update, General, in-vac work : the end is near 
Entry  Wed Aug 17 17:51:54 2011, Jenne, Update, Treasure, Prepared for drag wiping 
Entry  Tue Aug 23 00:55:13 2011, Jenne, Update, General, IFO ready for doors 
Entry  Tue Aug 23 01:05:40 2011, Jenne, Update, Treasure, All Hands on Deck, 9am! 
Entry  Tue Aug 23 16:23:33 2011, Jenne, Update, VAC, Access connector in place 
    Reply  Wed Aug 24 17:05:11 2011, Jenne, Update, SUS, Broken UL magnet on ITMX 
    Reply  Thu Aug 25 13:10:42 2011, Jenne, Update, SUS, Drag wiping 
    Reply  Thu Aug 25 15:20:03 2011, Jenne, Update, SUS, Broken UL magnet on ITMX 
    Reply  Fri Aug 26 15:30:36 2011, Jenne, Update, SUS, ITMX magnet reglued 
    Reply  Fri Aug 26 16:17:31 2011, Jenne, Update, General, drawer cabinet moves in 
    Reply  Sat Aug 27 14:33:04 2011, Jenne, Update, SUS, ITMX magnet status 
    Reply  Sun Aug 28 20:15:11 2011, Jenne, Update, SUS, ITMX magnet status 
ELOG V3.1.3-