40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 55 of 170  Not logged in ELOG logo
Entry  Thu Oct 28 16:38:54 2010, josephb, Update, CDS, Flaky fb, reverted inittab changes on fb 
    Reply  Thu Oct 28 21:20:11 2010, yuta, Update, CDS, Flaky fb, tried DAQ re-install, but no help 
Entry  Fri Oct 29 01:18:03 2010, Koji, Summary, SUS, PRM standoff glued IMG_3674.jpg
Entry  Fri Oct 29 04:24:34 2010, Koji, Update, IOO, PMC output increased: need attention 
Entry  Fri Oct 29 04:58:04 2010, Kevin, Update, PSL, PBS Optimization 
Entry  Thu Oct 28 23:17:15 2010, yuta, Summary, CDS, [EMERGENCY] accidentally deleted daqd 
    Reply  Fri Oct 29 11:25:15 2010, josephb, yuta, Summary, CDS, [EMERGENCY] accidentally deleted daqd 
Entry  Fri Oct 29 11:29:29 2010, josephb, Update, CDS, How I broke the frame builder yesterday 
Entry  Fri Oct 29 14:16:26 2010, Jenne, Update, SUS, PRM baking 
Entry  Fri Oct 29 05:40:51 2010, kiwamu, Update, PSL, wideband EOM aligned : AM decreased by 24dB EOMalign.png
    Reply  Fri Oct 29 16:03:35 2010, kiwamu, Update, PSL, wideband EOM : installed the triple resonant box small_DSC_2654.jpg
Entry  Fri Oct 29 16:39:01 2010, Jenne, Update, Treasure, Old Green suspension towers disassembled P1070014.JPGP1070015.JPG
Entry  Fri Oct 29 16:43:25 2010, josephb, Update, CDS, c1ioo now talking to c1sus 
Entry  Fri Oct 29 18:37:33 2010, yuta, Summary, CDS, daqd and current CDS status 06-25-2009.NN_24ThreatLevel.GJH2L69BK.1.jpg
Entry  Sun Oct 31 00:19:35 2010, rana, Summary, Computer Scripts / Programs, HP3563A netGPIB function 
Entry  Mon Nov 1 10:17:55 2010, steve, Update, General, breakers relabelled P1060970.JPGP1060972.JPGP1060975.JPG
Entry  Mon Nov 1 10:28:41 2010, steve, Bureaucracy, SAFETY, Suresh received 40m safety training 
Entry  Mon Nov 1 11:34:08 2010, josephb, Update, CDS, CA.Client.Exception spam fixed 
Entry  Mon Nov 1 12:38:56 2010, Leo Singer, Configuration, Computers, python-sqlite installed on Allegra 
Entry  Mon Nov 1 14:53:30 2010, josephb, alex, rolf, Update, CDS, Alex updated FB and mx_streams code 
Entry  Mon Nov 1 15:35:41 2010, josephb, Update, CDS, Front end USR and CPU times now recorded by DAQ 
Entry  Mon Nov 1 17:27:47 2010, Jenne, Update, SUS, PRM ready for installation into chamber 
Entry  Wed Oct 20 21:43:25 2010, yuta, Update, CDS, checking whitening filters for MCs and messed up MC2ULSEN.pngMC2LRSEN.png
    Reply  Thu Oct 21 21:35:16 2010, yuta, Update, CDS, fixed whitening filter switches LLLR.pngContec23BO.png
    Reply  Fri Oct 22 00:59:01 2010, yuta, Update, CDS, new MEDM screens, new filter banks(whitening and dewhitening related) HappySideMEDM.png
       Reply  Fri Oct 22 23:29:48 2010, yuta, Update, CDS, fixed output filter switching 
          Reply  Mon Nov 1 23:31:05 2010, yuta, Update, CDS, checked input hardware filter in single frequency 
Entry  Tue Nov 2 00:17:01 2010, Suresh, Configuration, Locking, Temporary changes to the Video Mux 
Entry  Tue Nov 2 11:34:53 2010, josephb, alex, Update, CDS, diagconfd running, excitations back in dtt 
Entry  Tue Nov 2 13:51:40 2010, josephb, yuta, Update, CDS, RFM slowdown problem 
Entry  Tue Nov 2 15:24:18 2010, josephb, Update, CDS, c1ioo and c1mcs only sending MC_L, MC1_PIT, MC1_YAW 
Entry  Tue Nov 2 16:24:07 2010, Koji, Update, Auxiliary locking, Alignment for the green in the X trans table  
Entry  Tue Nov 2 16:49:02 2010, Jenne, Configuration, Cameras, Cabling on the PSL table 
Entry  Wed Nov 3 02:37:39 2010, yuta, Summary, Green Locking, coarse locked green beat frequency Screenshot_LowFreqLock.png
    Reply  Wed Nov 3 03:00:47 2010, Koji, Summary, Green Locking, coarse locked green beat frequency 
Entry  Wed Nov 3 02:23:11 2010, yuta, Summary, CDS, checking whitening filter board MC3SEN.png
    Reply  Wed Nov 3 09:32:00 2010, rana, Summary, CDS, Eurocard board swapping 
Entry  Wed Nov 3 15:13:55 2010, josephb, Update, CDS, Temporary RFM slow read work around 
Entry  Wed Nov 3 16:49:31 2010, steve, Update, General, storage cabinet is in place P1070018.JPG
Entry  Wed Nov 3 17:01:01 2010, josephb, Summary, CDS, Comparison of RFM read times  
Entry  Wed Nov 3 19:14:00 2010, rana, Update, PSL, PMC mode matching update 
Entry  Mon Nov 1 19:32:08 2010, yuta, Summary, CDS, fb crashed? during c1ioo and c1mcs connection at ASC 
    Reply  Wed Nov 3 21:19:40 2010, yuta, Update, CDS, put LOCKIN to c1ioo model and checked Screenshot_C1IOO_LOCKIN.png
Entry  Wed Nov 3 23:58:45 2010, rana, Update, Electronics, Cougars 
Entry  Thu Nov 4 03:13:46 2010, Suresh, Update, Locking, Fibre coupling 1064nm light at the south-end table 
Entry  Thu Nov 4 15:15:43 2010, josephb, Update, CDS, Modified feCodeGen.pl, fmseq.pl, and suspension screens 
Entry  Thu Nov 4 15:27:33 2010, josephb, yuta, Update, CDS, c1ioo test points not working 
Entry  Thu Nov 4 17:24:49 2010, steve, Update, General, conflat flanges for MIT P1070020.JPG
Entry  Thu Nov 4 17:57:27 2010, steve, Update, General, BeamScanner is working again P1070024.JPG
Entry  Thu Nov 4 19:00:57 2010, Suresh, Update, Locking, Fibre coupling 1064nm light at the south-end table 
Entry  Thu Nov 4 19:26:51 2010, Suresh, Update, Locking, Changes to the Video MUX reversed 
Entry  Fri Nov 5 09:08:14 2010, steve, Update, SUS, epoxy 11081001.PDF
Entry  Thu Nov 4 17:53:29 2010, yuta, Update, CDS, primitive python script for A2L measurement a2ltest.png
    Reply  Fri Nov 5 14:06:19 2010, yuta, Update, IOO, tried to align MC by A2L measurement A2LmeasurementFigures.png
Entry  Fri Nov 5 16:40:22 2010, josephb, alex, Update, CDS, c1ioo now has working awgtpman 
Entry  Fri Nov 5 19:33:18 2010, Jenne, Update, Electronics, The beginnings of the new phase of the RF work 
Entry  Fri Nov 5 23:05:43 2010, rana, Configuration, IOO, ioo.db file changed in c1iool0 to get back MC TRANS 
Entry  Sat Nov 6 00:49:04 2010, Koji, Update, IOO, IMC table work 
Entry  Sat Nov 6 01:54:15 2010, Frank, Summary, Computers, virus definition file update on laptop for dinocam 
Entry  Fri Nov 5 15:20:18 2010, josephb, alex, Summary, CDS, 40m computer slow down solved 
    Reply  Fri Nov 5 21:49:12 2010, rana, Summary, CDS, 40m computer slow down solved 
       Reply  Sat Nov 6 16:13:14 2010, rana, Summary, CDS, 40m computer slow down solved 
Entry  Mon Nov 8 10:37:14 2010, Koji, Update, IOO, The 10% pick-off for MCREFL was replaced to a HR mirror 
ELOG V3.1.3-