40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 54 of 171  Not logged in ELOG logo
Entry  Mon Oct 18 11:22:13 2010, Jenne, Update, Computers, Shame on people not elogging! FrameFiles backups not working. 
Entry  Mon Oct 18 15:33:00 2010, josephb, alex, Update, CDS, Possibly broken timing cards 
   +  Reply  Mon Oct 18 18:00:36 2010, Koji, Update, SUS, Old PRM, SRM stored, new PRM drag wiped 
Entry  Mon Oct 18 18:33:46 2010, Koji, Summary, COC, Summary of the main mirrors & their phasemap measurement 
Entry  Mon Oct 18 22:11:32 2010, Joonho Lee, Summary, Electronics, CCD cables for input signal 
Entry  Tue Oct 19 00:24:07 2010, Dmass, Omnistructure, Electronics, Massive restocking of the 40m 
Entry  Tue Oct 19 15:14:51 2010, Jenne, Update, SUS, PRM (little) update 
Entry  Tue Oct 19 22:37:28 2010, Koji, Update, PSL, PSL table cleaning up 
   +  Reply  Wed Oct 20 01:22:18 2010, yuta, Update, CDS, fixed filters for MCs, but no damping Screenshot.png
Entry  Wed Oct 20 16:41:41 2010, steve, Omnistructure, General, laser chiller leaving for MIT P1060929.JPG
Entry  Wed Oct 20 18:17:35 2010, Suresh, Jenne, Update, SUS, PRM assembly 
Entry  Wed Oct 20 21:33:11 2010, Kevin, Update, PSL, Quarter Wave Plate Optimization 
Entry  Thu Oct 21 10:44:56 2010, steve, Metaphysics, Treasure, 1987 supernova tapes plus....? P1060932.JPG
Entry  Thu Oct 21 12:15:02 2010, rana, Update, PEM, 6.9 Mag EQ in Gulf of California 
   +  Reply  Thu Oct 21 13:05:19 2010, Koji, Summary, Computers, elog change and rossa tex 
   +  Reply  Thu Oct 21 15:59:28 2010, kiwamu, Update, Locking, no green beat note : details bw.png
   +  Reply  Fri Oct 22 01:23:13 2010, Koji, Update, PSL, Found the beat at 1064nm 101021_beat.pdf
Entry  Fri Oct 22 15:06:43 2010, Jenne, Update, SUS, Arts and Crafts! StatusTable.png
   +  Reply  Fri Oct 22 18:22:27 2010, Alberto, Update, Electronics, Epic Takeover 
   +  Reply  Sat Oct 23 03:36:05 2010, yuta, Update, CDS, fixed filters for C1SUS, C1RMS, C1MCS 
Entry  Sat Oct 23 14:42:01 2010, yuta, Summary, CDS, damped MC suspensions dam.png
Entry  Sun Oct 24 19:55:50 2010, kiwamu, Update, Electronics, lonely RF amplifier on ITMX table 
   +  Reply  Mon Oct 25 02:14:38 2010, Koji, Summary, Locking, setup for green beat 
   +  Reply  Mon Oct 25 02:25:21 2010, Koji, Update, PSL, Quarter Wave Plate Measurements 
Entry  Mon Oct 25 11:39:06 2010, Jenne, Update, SUS, Magnets glued to PRM StatusTable.png
Entry  Mon Oct 25 20:20:59 2010, yuta, Joe, Update, CDS, DAQ channel number etc 
Entry  Mon Oct 25 23:10:06 2010, Koji, Update, IOO, MC is now flashing 
Entry  Tue Oct 26 00:45:08 2010, rana, Update, PSL, New NPRO Diagnostic Wiring Untitled.png
Entry  Tue Oct 26 01:53:21 2010, Joonho Lee, Update, Electronics, Fuction Generator removed. 
   +  Reply  Mon Oct 25 02:23:47 2010, Koji, Configuration, elog, ELOG 2.8.0 
   +  Reply  Tue Oct 26 12:45:20 2010, yuta, HowTo, CDS, making a new master file for medm screens 
Entry  Tue Oct 26 15:57:10 2010, Jenne, Update, SUS, One magnet broken, reglued 
Entry  Tue Oct 26 16:02:55 2010, yuta, HowTo, CDS, things to do after making a new Simulink model 
   +  Reply  Tue Oct 26 21:27:02 2010, Jenne, Update, CDS, fixed OPLEV stuff and MCL filters 
Entry  Wed Oct 27 02:26:15 2010, kiwamu, Update, IOO, MC locked  
Entry  Wed Oct 27 09:02:29 2010, steve, Update, Electronics, HP4195A is NOT fixed 
   +  Reply  Wed Oct 27 10:53:03 2010, josephb, Configuration, Computers, Why doesn't DTT work?!? 
Entry  Wed Oct 27 11:34:40 2010, josephb, Update, CDS, Modified rc.local for front end machines 
Entry  Wed Oct 27 11:52:45 2010, josephb, Update, elog, Elog needed to be restarted 
Entry  Wed Oct 27 12:32:53 2010, josephb, Update, CDS, fb rebooted to try and fix testpoints 
Entry  Wed Oct 27 15:38:19 2010, josephb, yuta, Update, CDS, IO chassis with bad timing was taken back to Downs 
Entry  Wed Oct 27 16:15:35 2010, Suresh, Update, SUS, Re-glued magnet to the PRM 
Entry  Wed Oct 27 17:06:48 2010, josephb, Update, CDS, Moved c1iscey chassis and host interface board to c1ioo 
Entry  Wed Oct 27 21:33:42 2010, Suresh, Update, Locking, Green from the far end re-obtained 
Entry  Wed Oct 27 21:51:29 2010, Suresh, Update, PSL, Attenuation of PSL NPRO removed 
Entry  Thu Oct 28 02:01:51 2010, Kevin, Update, PSL, Filter for 2W Laser tf.PDFoutside.jpginside.jpg
Entry  Thu Oct 28 03:39:58 2010, yuta, Update, IOO, got very stable MC locking C1IOO_MC_SERVO20101028.pngMCrocks!.png
   +  Reply  Thu Oct 28 04:23:38 2010, rana, Update, IOO, A2L prep 
   +  Reply  Thu Oct 28 13:01:34 2010, steve, Update, PEM, crane repair guys left for the day 
   +  Reply  Thu Oct 28 20:08:26 2010, yuta, Update, Green Locking, revised RF amp cascading 
ELOG V3.1.3-