  14887   Tue Sep 17 10:34:48 2019 aaronUpdateIOOWFS loop measurementsI'm using the notebooks from rana as
a starting point, and making a script to
measure and fill the WFS sensing matrix.
  
  14886   Tue Sep 17 09:41:48 2019 gautamUpdateIOOWFS loop measurementsLet's
not worry about C1LSC until the c1iscaux
  
  14885   Mon Sep 16 20:22:19 2019 gautamSummaryCDSUpdate on the Acromag status
Jordan (new Engineer) and Chub
neatened out the cabling at 1Y2/1Y3 today.
After their work, I plugged in all the Dsubs
 acromagChecklist.pdf 
  14884   Mon Sep 16 19:29:24 2019 KojiUpdateCamerasMC2 trans camera (?) rotatedThe left one is analog and 90deg rotated.

See also: This
issue tracker
  
  14883   Mon Sep 16 17:53:16 2019 aaronUpdateCamerasMC2 trans camera (?) rotatedWe noticed last week that the MC2 trans
camera has pitch and yaw swapped; I rotated
what I thought is the correct camera by 90
 47D6ED9C-BF21-4D6E-9947-284FE4A336F4.jpeg 
  14882   Mon Sep 16 12:38:59 2019 aaronUpdateIOOWFS measurementsI wanted to make a zero model of this circuit
to get a handle on the results. I couldn't
import zero on pianosa, and I tried pip installing
  
  14881   Mon Sep 16 12:00:16 2019 aaronHowToGeneralMoved some immovable opticsWhen I put away the lenses we had used
for measuring the RF transfer functions of
the QPD heads, I saw that I'd removed
  
  14880   Mon Sep 16 11:55:58 2019 rikaUpdateIOOWFS loop measurements[rika, aaron]

We aligned optics of WFS as it
was. Now auto-locker is working to lock MC.
  
  14879   Mon Sep 16 09:11:37 2019 gautamSummaryCDSDIN 96pin to DSUB37 adapter (single) ready for useI installed 6 of these
in 1Y2. Three were for PD INTF #1-3, and
I used three more for the AS110, REFL11,
  
  14878   Mon Sep 16 05:08:04 2019 ranaUpdateIOOWFS loop measurementsnot need to use DTT. I'm attaching
some half-finished notebooks that give the
gist.
 LSCsensingMatrix.ipynbASCsensingMatrix.ipynb 
  14877   Fri Sep 13 13:03:35 2019 KojiSummaryCDSDIN 96pin to DSUB37 adapter (single) ready for useThe PCB board of the adapter for DIN 96pin
to DSUB37 conversion (single DSUB version)
was delivered yesterday and I quickly soldered
 P_20190912_192109.jpg 
  14876   Fri Sep 13 10:53:40 2019 aaronUpdateIOOWFS loop measurementsI'm scripting the WFS sensing matrix
measurements. I haven't really scripted
DTT before, so I'm trying to find documentation
  
  14875   Fri Sep 13 10:36:03 2019 aaronUpdateIOOWFS measurements[rika, aaron]

We are at it again. Rika is setting
up the TF measurement, I'm looking into
 TF-.pngWFS2_TFs.pdf 
  14874   Thu Sep 12 12:42:31 2019 aaronUpdateIOOWFS measurements[rika, aaron]

At Seiji and Gautam's suggestion,
we added an additional RF photodiode (NewFocus
 WFS2_TFs.pdfD755499D-9FDF-4E2B-BFC1-016B459DD35D.jpeg 
  14873   Thu Sep 12 09:49:07 2019 gautamUpdateComputerscontrol rm wkstns shutdownChub wanted to get the correct part number
for the replacement UPS batteries which necessitated
opening up the UPS. To be cautious, all the
 IMG_7943.JPG 
  14872   Wed Sep 11 14:37:43 2019 aaronUpdateIOOWFS measurements[aaron, rika]

We identified the Jenne laser and
found a long optical fiber that might be
 20190911_WFS.jpg20190911_WFS_2.jpg 
  14871   Wed Sep 11 10:26:56 2019 aaronUpdateIOOWFS measurementsGameplan

We should also have
a plan for the next couple weeks so we are
organized; heavily adapted
  
  14870   Tue Sep 10 17:26:49 2019 KojiUpdateCDSD1900068 SR785 accessory boxI picked up a unit of D1900068 SR785 accessory
box from Dean's office at Downs. 
 P_20190910_171859_1.jpg 
  14869   Tue Sep 10 16:10:40 2019 ChubUpdate Rack UpdateStill removing old cable, terminal blocks
and hardware.  Once new strain reliefs
and cable guides are in place, I will need
 20190910_154018.jpg20190910_154006.jpg 
  14868   Tue Sep 10 15:41:37 2019 aaronUpdateIOOWFS measurements[rika, aaron, rana]

We are getting the MC locked in
anticipation of making some WFS transfer
 Screenshot_from_2019-09-10_18-51-28.pngmctrend_190910.png 
  14867   Mon Sep 9 11:36:48 2019 aaronHowToCDSHow to save c1iooOne pair of DIMM cards from the Sunstone
box had the same Sun part number as those
in c1ioo, so 
 reboot.png 
  14866   Fri Sep 6 22:03:30 2019 aaronHowToCDSHow to save c1iooSaw these slightly delayed.

Q1: Not sure--is it a safe operation
for me to remove the DIMM on CPU0, replace
  
  14865   Fri Sep 6 21:22:06 2019 KojiHowToCDSHow to save c1iooQ1 Can we run the machine with the reduced
# of cores?

Q2 We might be able to order them
  
  14864   Fri Sep 6 18:08:29 2019 ranaUpdateComputersAlarm noise from smart-ups machine under workstation?please no one touch
the UPS: last time it destroyed ROSSA.
Please ask Chub to order the replacement
  
  14863   Fri Sep 6 16:38:24 2019 aaronUpdateALARMAlarm noise from smart-ups machine under workstation?There was an alarm sound from the Smart-UPS
2200 sitting under the workstation. I see
that the 'replace battery' light
  
  14862   Fri Sep 6 15:12:49 2019 KojiHowToCDSWFS discussion, restarting CDSAssuming you are at pianosa, /etc/resolv.conf
is like

#
  
  14861   Fri Sep 6 11:56:44 2019 aaronHowToCDSWFS discussion, restarting CDSRebooting

I reset c1lsc, c1sus,
and c1ioo.

I noticed that the script gives
 B26CECF8-FC0D-4348-80DC-574B1E3A4514.jpeg 
  14860   Fri Sep 6 09:40:56 2019 aaronHowToCDSWFS discussion, restarting CDSAs suggested, I ran the script cds/rebootC1LSC.sh

I got a timeout error when the
script tried closing the PSL shutter ('C1:AUX-PSL_ShutterRqst'
  
  14859   Thu Sep 5 20:30:43 2019 ranaHowToCDSWFS discussion, restarting CDSvia Polish chat, GV tells us to RTFE   
  14858   Thu Sep 5 18:42:19 2019 aaronHowToCDSWFS discussion, restarting CDS[aaron, rana]

While going to take some transfer
functions of the MC WFS loop, LSC was down.
  
  14857   Sun Aug 25 14:18:08 2019 gautamUpdateCDSc1iscaux remaining workThere were a bunch of useless / degenerate
channels added - e.g. whitening gains which
are alreay burt-snapshot. Maybe there are
 Screen_Shot_2019-08-25_at_10.38.37_PM.png 
  14856   Fri Aug 23 19:10:02 2019 JonUpdateCamerasGigE camera server is onlineFollowing the death of rossa, which was
hosting the only working environment for
the 
  
  14855   Fri Aug 23 18:46:17 2019 JonUpdateCDSc1iscaux remaining workI added the list of new c1iscaux channels
to /opt/rtcds/caltech/c1/chans/daq/C0EDCU.ini
  
  14854   Fri Aug 23 10:01:14 2019 gautamUpdateBHDOMC cavity geometry - some more modelingSummary:

I did some more investigation of
what the appropriate cavity geometry would
 modeContentComparison.pdfOMCtransComparison.pdf 
  14853   Thu Aug 22 20:56:51 2019 KojiUpdateCDSMC1 glitch removed (for now) and IMC locking recoveredThe internal ribbon cable for the MC1 satellite
box was replaced with the one in the spare
box. The MC1 box was closed and reinstalled
  
  14852   Thu Aug 22 12:54:06 2019 KojiUpdateCDSMC1 glitch removed (for now) and IMC locking recoveredI have checked the MC1 satellite box and
made a bunch of changes. For now, the glitches
coming from the satellite box is gone. I
 7x 
  14851   Tue Aug 20 19:05:24 2019 KojiUpdateCDSMC1 (and MC3) troubleshootStarted the troubleshoot from the MC1 issue.
Gautam showed me how to use the fake PD/LED
pair to diagnose the satellite box without
 Screenshot_from_2019-08-20_17-26-01.pngScreenshot_from_2019-08-20_17-43-03.png 
  14850   Mon Aug 19 14:36:21 2019 gautamUpdateCDSc1iscaux remaining workHere is what is left to do:


Strain relief of all cabling.
Chub will take care of this in the coming
 caseForSmallerFootprint.pdf 
  14849   Sat Aug 17 16:49:23 2019 gautamUpdateCDSMore 1Y3 workWork done today:


All ribbon cable connections
to the backplane of the 1Y2 Eurocrates were
 Screen_Shot_2019-08-17_at_3.00.57_PM.pngScreen_Shot_2019-08-17_at_3.12.23_PM.pngIMG_7804.JPGScreenshot_from_2019-08-17_17-04-47.png 
  14848   Fri Aug 16 16:40:04 2019 gautamUpdateCDS1Y3 work[chub,
gautam]
 newLook1Y3.JPGIMG_7803.JPGc1lsc_crashed.png 
  14847   Fri Aug 16 04:24:03 2019 ranaUpdateALSALS sensing noise due to IMCWhat about just use high gain feedback
to MC2 below 20 Hz for the IMC lock? That
would reduce the excess if this theory is
  
  14846   Thu Aug 15 18:54:54 2019 gautamUpdateALSALS sensing noise due to IMCSummary:

I came aross an interesting
suggestion by Yutaro that KAGRA's
 ALSsensingNoise.pdf 
  14845   Tue Aug 13 14:36:17 2019 gautamUpdateCDSP1--->P2As it turns out, only one extra shroud
needed to be installed - I did this and migrated
the cables for the 4 whitening boards from
  
  14844   Tue Aug 13 08:07:09 2019 gautamUpdateCDSP1--->P2This morning, I wanted to move the existing
cables going to the P1 connectors of the
iLIGO whitening boards to the P2 connector,
  
  14843   Mon Aug 12 21:25:19 2019 KojiUpdateCDSMore bench test of c1iscaux1.

> Looking through the manual,
I found a recommendation (pg10) that the
  
  14842   Mon Aug 12 19:58:23 2019 gautamUpdateIOOMC1 suspension oddnessRepair plan:


Get "spare" satellite
box working --- Chub

According
  
  14841   Mon Aug 12 17:36:04 2019 gautamUpdateCDSMore bench test of c1iscaux[chub, gautam]

With Chub's help, most of the
problems have been resolved. Summary: I
 iscauxCheclist.pdf 
  14840   Sun Aug 11 11:47:42 2019 gautamUpdateCDSBench test of c1iscauxI bench tested the functionality of all
the c1iscaux Acromag crate channels. Summary:
we are not ready for a Monday install, much
  
  14839   Fri Aug 9 20:58:33 2019 JonUpdateElectronicsBorrowed Variac transformerI borrowed an old-looking Variac variable
transformer from the power supplies cabinet
along the y-arm. It is currently in
  
  14838   Fri Aug 9 16:37:39 2019 gautamUpdateALSMore EY table workSummary:


220 uW / 600 uW (~36 %
mode-matching) of IR light coupled into fiber
 IMG_7791.JPGfiberCleaning.pdf 
ELOG V3.1.3-