Mon Mar 10 21:13:43 2014, nicolas, Summary, LSC, Composite Error Signal for ARms (2)   
|
Wed Mar 5 19:27:24 2014, manasa, Update, IOO, MC calmed down
|
Thu Mar 6 09:47:11 2014, Steve, Update, IOO, MC trend of 20 days
|
Thu Mar 6 19:17:05 2014, manasa, Update, IOO, MC calmed down
|
Fri Mar 7 16:56:17 2014, steve, Update, IOO, IOO qpds centered
|
Mon Mar 10 09:28:48 2014, steve, Update, IOO, IOO pointing 2 days 
|
Mon Mar 10 12:49:27 2014, Jenne, Update, IOO, PMC input pointing misaligned
|
Wed Mar 5 11:33:10 2014, Koji, Summary, LSC, 2 arm ALS->LSC transition - road map
|
Wed Mar 5 19:15:39 2014, Jenne, Summary, LSC, ALS offset moving script modified
|
Wed Mar 5 22:32:21 2014, manasa, Update, LSC, Stuck at step 2
|
Thu Mar 6 11:15:32 2014, Koji, Summary, LSC, Stuck at step 2
|
Fri Mar 7 00:43:34 2014, manasa, Update, LSC, ALS C&D locked (on MC2 and ETMs) and IR resonance obtained
|
Thu Feb 27 01:02:57 2014, Jenne, Update, SUS, Oplev Tuning Party - round 1
|
Thu Feb 27 22:25:29 2014, rana, Update, SUS, Oplev Tuning Party - round 1 commentary
|
Wed Mar 5 09:52:31 2014, Jenne, Update, SUS, Oplev Tuning - Cartoon cost function
|
Thu Mar 6 17:34:03 2014, rana, Update, SUS, Oplev Tuning - Cartoon cost function
|
Thu Mar 6 11:43:17 2014, steve, Update, General, Guralp control unit 
|
Fri Feb 21 12:45:57 2014, ericq, Update, LSC, Equivalent Displacement Noise from QPD Dark Noise in SQRTINV 
|
Wed Mar 5 18:04:36 2014, ericq, Update, LSC, Equivalent Displacement Noise from QPD Dark Noise in SQRTINV   
|
Wed Mar 5 16:27:51 2014, ericq, Update, LSC, Preliminary Arm Loss Measurements
|
Tue Feb 11 16:49:36 2014, Steve, Update, PEM, floor cleaning
|
Tue Feb 18 10:10:07 2014, Steve, Update, PEM, floor cleaning under racks
|
Tue Mar 4 17:07:27 2014, Steve, Update, PEM, floor cleaning under racks
|
Mon Mar 3 23:16:06 2014, rana, Update, LSC, Y Arm Loop Shape found to be weird: changed now  
|
Mon Mar 3 21:50:35 2014, Jenne, Update, Computer Scripts / Programs, Dropbox installed on Workstations
|
Mon Mar 3 17:35:10 2014, Koji, Update, LSC, Various demod phase measurement
|
Wed Feb 26 02:20:35 2014, Jenne, Update, IOO, MC unhappy
|
Wed Feb 26 10:08:14 2014, Steve, Update, IOO, IOO trend
|
Tue Feb 25 00:00:01 2014, rana, jenne, Update, LSC, reasons that the REFL signals may be degenerate now
|
Tue Feb 25 02:46:38 2014, rana, jenne, Update, LSC, Changing PRCL offset changes REFL 165 degeneracy
|
Tue Feb 25 14:48:49 2014, ericq, Update, LSC, Changing PRCL offset changes REFL 165 degeneracy 
|
Tue Feb 25 16:07:33 2014, ericq, Update, LSC, Changing PRCL offset changes REFL 165 degeneracy 
|
Wed Feb 26 01:49:08 2014, Jenne, Update, LSC, Changing PRCL offset changes REFL 165 degeneracy 
|
Tue Feb 25 23:38:05 2014, rana, jenne, Update, PEM, GUR1 Z channel excess noise: oscillating Z channel
|
Tue Feb 25 17:27:41 2014, Jenne, Update, LSC, REFL signals calibrated 
|
Mon Feb 24 23:43:10 2014, rana, Summary, General, ToDo
|
Mon Feb 24 13:21:00 2014, Jenne, Update, Electronics, Measured REFL165 demod board
|
Mon Feb 24 17:59:31 2014, RANA, Update, Electronics, Measured REFL165 demod board
|
Tue Jul 9 17:03:06 2013, Steve, Update, Green Locking, fiber layed for Y arm  
|
Wed Jul 10 14:49:00 2013, Steve, Update, Green Locking, more fiber protective tubing layed
|
Mon Feb 24 17:21:42 2014, Steve, Update, Green Locking, green fiber status today 6x
|
Mon Feb 24 13:40:13 2014, Jenne, Update, CDS, Computer weirdness with c1lsc machine
|
Mon Feb 24 15:25:29 2014, Jenne, Update, CDS, Computer weirdness with c1lsc machine
|
Mon Feb 24 16:26:14 2014, Jenne, Update, CDS, NTP fell out of sync on front end machines - fixed
|
Wed Feb 19 22:47:26 2014, Jenne, Update, LSC, ALS locked using LSC model, Common & Diff transitioned to IR transmission signals 
|
Wed Feb 19 11:45:12 2014, Jenne, Update, LSC, Scripts for ALS being modified
|
Wed Feb 19 18:21:33 2014, manasa, Update, LSC, Scripts for ALS modified
|
Wed Feb 19 11:00:16 2014, ericq, Update, LSC, Some Simulation Efforts   
|
Wed Feb 19 14:14:46 2014, ericq, Update, LSC, Some Simulation Efforts  
|
Wed Feb 19 16:42:08 2014, ericq, Update, LSC, Some Simulation Efforts 
|
Tue Feb 18 23:55:33 2014, Jenne, Update, LSC, ALS locked with LSC!
|
Wed Feb 19 00:35:23 2014, Koji, Update, LSC, ALS locked with LSC!
|
Wed Feb 19 01:33:03 2014, Jenne, Update, LSC, ALS locked with LSC!  
|
Wed Feb 19 03:07:22 2014, Jenne, Update, LSC, ALS locked with LSC!
|
Sun Feb 16 17:40:11 2014, Koji, Update, LSC, Friday Night ALS
|
Tue Feb 18 18:52:08 2014, Jenne, Update, LSC, ALS not locking with LSC   
|
Tue Feb 18 20:31:29 2014, Koji, Update, LSC, ALS not locking with LSC
|
Tue Feb 18 23:27:14 2014, Jenne, Update, LSC, ALS not locking with LSC
|
Tue Feb 18 14:28:15 2014, Jenne, Update, IOO, MC unstable - centering spots helped
|
Fri Feb 14 21:03:13 2014, Koji, Update, General, Y end "BS"
|
Fri Feb 14 12:39:02 2014, Jenne, Update, safety, Smoke detector cleaned
|
Fri Feb 14 02:33:09 2014, manasa, Update, General, My IFO time summary
|
Fri Feb 14 00:58:41 2014, Jenne, Update, LSC, Thoughts on Transition to IR
|
Thu Feb 13 22:27:54 2014, Jenne, Update, LSC, PRMI locked on REFL 33 I&Q
|
Mon Feb 10 22:21:55 2014, manasa, Update, Green Locking, X and Y arm green tuned
|
Tue Feb 11 21:22:02 2014, manasa, Update, Green Locking, ALS X and Y arm restored
|
Tue Feb 11 22:17:06 2014, Koji, Update, Green Locking, ALS X and Y arm restored
|
Thu Feb 13 16:48:33 2014, Steve, Update, Green Locking, X and Y arm green tuned details
|
Thu Feb 13 13:18:33 2014, manasa, Update, IOO, MC needed some help
|
Wed Feb 12 19:47:40 2014, Jenne, Update, LSC, Calibrated REFL signals
|
Wed Feb 12 20:30:41 2014, Koji, Update, LSC, Calibrated REFL signals
|
Wed Feb 12 14:05:16 2014, ericq, Update, SUS, PRM Oplev Checked Out
|
Wed Feb 12 14:59:36 2014, Steve, Update, SUS, clipping removed from PRM oplev 
|
Wed Feb 12 19:37:05 2014, Jenne, Update, SUS, clipping removed from PRM oplev
|
Wed Feb 12 11:57:55 2014, Jenne, Update, LSC, Musings on RFPDs
|
Tue Feb 4 16:43:50 2014, manasa, Update, General, IFO alignment update
|
Tue Feb 4 17:40:19 2014, manasa, Update, General, Ready for pump down??
|
Tue Feb 4 23:01:24 2014, Jenne, Update, General, Ready for pump down??
|
Wed Feb 5 15:26:57 2014, manasa, Update, General, Ready for pump down??
|
Mon Feb 10 16:02:12 2014, Jenne, Update, General, PRM oplev clipped in vacuum
|
Mon Feb 10 16:20:28 2014, Jenne, Update, General, PRM QPD recentered
|
Mon Feb 10 18:59:25 2014, Jenne, Update, ASC, PRM ASC better, but not great yet
|
Mon Feb 10 19:56:10 2014, rana, Update, ASC, PRM ASC better, but not great yet
|
Mon Feb 10 18:03:41 2014, jamie, Update, CDS, 12 core c1sus replacement
|
Sat Feb 8 15:14:18 2014, ericq, Update, LSC, PRM Sideband Splitting
|
Fri Feb 7 17:52:41 2014, Koji, Summary, General, Some cleaning up
|
Thu Feb 6 16:41:31 2014, ericq, Update, General, In-Vac Alignment
|
Fri Feb 7 12:43:12 2014, ericq, Update, General, In-Vac Alignment
|
Fri Feb 7 13:00:52 2014, Jenne, Update, General, In-Vac Alignment
|
Fri Feb 7 13:30:22 2014, Gabriele, Update, General, In-Vac Alignment
|
Fri Feb 7 13:30:25 2014, ericq, Update, General, In-Vac Alignment
|
Wed Feb 5 20:41:57 2014, Den, Update, LSC, calibrated spetra from OAF test
|
Wed Feb 5 09:28:32 2014, Steve, Update, SUS, ETMY damping restored
|
Tue Feb 4 00:42:18 2014, Koji, Update, General, X arm aligned for IR/GR
|
Mon Feb 3 23:31:33 2014, Manasa, Update, General, Alignment update / Y arm locked
|
Mon Feb 3 10:17:14 2014, Steve, Update, PEM, dusty surfaces   
|
Fri Jan 31 19:29:36 2014, Gabriele, Summary, LSC, PRC and SRC lengths 
|
Fri Jan 31 18:41:25 2014, manasa, Update, General, IFO alignment update
|
Thu Jan 30 19:00:25 2014, Gabriele, Summary, LSC, PRC length changed 
|
Wed Jan 29 21:01:03 2014, Gabriele, Summary, LSC, PRC length measurement analysis 
|
Wed Jan 29 16:36:37 2014, Koji, Summary, General, High power beam blasting of the aLIGO RFPD
|
|