Wed Sep 8 11:56:24 2010, kiwamu, Summary, CDS, September CDS test plan
|
Wed Sep 8 14:44:37 2010, josephb, Update, CDS, Updated parse_mdl_to_ipc.py and feCodeGen.pl
|
Wed Sep 8 16:17:58 2010, steve, Update, PEM, particle counter problem
|
Thu Sep 9 05:58:04 2010, kiwamu, Update, PSL, mode matching from PMC to IMC
|
Thu Sep 9 11:31:54 2010, steve, Update, PEM, accelerometer cable connection
|
Thu Sep 9 12:02:03 2010, Alberto, Update, Electronics, Frequency Generation Box - Amplitude Noise Measurements 
|
Thu Sep 9 14:42:40 2010, josephb, Update, CDS, Updating suspensions model
|
Thu Sep 9 08:23:45 2010, steve, Update, SAFETY, main laser turned off
|
Thu Sep 9 11:17:15 2010, steve, Update, SAFETY, main laser is back ON  
|
Thu Sep 9 16:54:56 2010, rana, Update, SAFETY, main laser is back ON
|
Thu Sep 9 18:53:56 2010, Alberto, Configuration, Electronics, Busby Box, Rai's Box, SR554 in the RF cabinet
|
Fri Sep 10 02:35:30 2010, rana, kiwamu, valera, tara, Configuration, PSL, update
|
Sat Sep 11 22:42:07 2010, valera, Update, PSL, PSL update 
|
Thu Sep 2 21:22:31 2010, Sanjit, Koji, Configuration, Computers, rossa nvidia driver and dual monitor configuration
|
Thu Sep 2 23:35:33 2010, rana, Configuration, Computers, rossa nvidia driver and dual monitor configuration
|
Fri Sep 3 11:23:16 2010, josephb, Configuration, Computers, rossa nvidia driver and dual monitor configuration
|
Sun Sep 5 21:35:41 2010, rana, Configuration, Computers, rossa notes
|
Tue Sep 7 10:50:53 2010, josephb, Configuration, Computers, rossa notes
|
Sat Sep 11 03:16:51 2010, rana, Configuration, Computers, rossa notes
|
Sun Sep 12 22:36:03 2010, rana, Configuration, Computers, rossa notes
|
Tue Sep 7 23:17:45 2010, sanjit, Configuration, Computers, rossa notes
|
Sun Sep 12 23:02:53 2010, valera, Update, , PMC mode matching 
|
Sun Sep 12 23:16:52 2010, valera, Update, , FSS mode matching  
|
Mon Sep 13 00:19:32 2010, rana, Update, , VCO Driver Output power v. slider control voltage
|
Mon Sep 13 02:45:59 2010, rana, Configuration, DMF, seisBLRMS restarts
|
Mon Sep 13 10:22:48 2010, josephb, Update, CDS, RCG bugs/feature request wiki page
|
Mon Sep 13 11:49:34 2010, kiwamu, Update, PSL, mode matching from PMC to IMC 
|
Mon Sep 13 12:09:42 2010, kiwamu, Summary, General, elog restarted
|
Mon Sep 13 19:41:38 2010, rana, Update, PSL, FSS AOM alignment
|
Mon Sep 13 21:52:53 2010, kiwamu, Update, Green Locking, the X end laser is ON
|
Mon Sep 13 22:51:07 2010, tara,valera, Configuration, PSL, beam scan for RCAV
|
Tue Sep 14 00:21:51 2010, rana, Omnistructure, Environment, Office area temperature change
|
Mon Sep 13 11:40:50 2010, Alberto, Update, Electronics, Frequency Box Documentation Added to the SVN
|
Tue Sep 14 18:07:41 2010, Alberto, Update, Electronics, Frequency Box Documentation Added to the SVN
|
Wed Sep 15 01:27:52 2010, rana, steve, valera, Update, PSL, FSS cables connected
|
Wed Sep 15 01:58:28 2010, valera, Update, PSL, FSS locking
|
Wed Sep 15 03:08:26 2010, Koji, Update, PSL, FSS locking
|
Wed Sep 15 14:34:57 2010, josephb, Summary, CDS, Plan for RFM switch over
|
Wed Sep 15 16:00:26 2010, koji, steve, Update, MOPA,
|
Wed Sep 15 16:12:35 2010, koji, steve, Update, MOPA, MOPA Controller is taken out of the PSL rack
|
Wed Sep 15 19:29:13 2010, valera, Summary, , PSL power budget
|
Fri Sep 17 01:36:14 2010, valera, Update, , PMC line width 
|
Fri Sep 17 03:06:06 2010, Koji, Update, SUS, SOS sent for baking 
|
Fri Sep 17 03:32:11 2010, Koji, Update, SUS, Arrangement of the SUS towers
|
Fri Sep 17 12:11:42 2010, josephb, Update, CDS, Downs update
|
Fri Sep 17 14:55:01 2010, josephb, Update, CDS, Took 5565 RFM card from IOVME to place in the new IOO chassis
|
Fri Sep 17 17:35:35 2010, steve, Update, PEM, cleaned up at 1Y1 PSL rack
|
Sun Sep 19 18:09:09 2010, rana, Configuration, Cameras, Blue IP Camera installed on the PSL table
|
Sun Sep 19 18:52:52 2010, rana, Configuration, PSL, NPRO SLOW servo settings updated for Innolight NPRO
|
Mon Sep 20 10:33:21 2010, josephb, Bureaucracy, Computers, Larry stopped by - GC machine had conflicting IP
|
Mon Sep 20 11:39:45 2010, josephb, Update, CDS, Switch over
|
Mon Sep 20 16:59:26 2010, josephb, Update, CDS, Megatron in 1X2 rack, to be come c1ioo
|
Mon Sep 20 17:10:10 2010, steve, Configuration, PSL, enclosure beam guides to IFO are installed
|
Tue Sep 21 15:33:02 2010, steve, Metaphysics, Treasure, Wagonga alart 
|
Tue Sep 21 16:05:21 2010, josephb, Update, CDS, First pass at rack diagram
|
Wed Sep 22 16:35:45 2010, josephb, Update, CDS, Fibers pulled, new FB install tomorrow
|
Mon Sep 6 10:08:10 2010, Alberto, Configuration, Computers, Netgear Network Switch fan broken.
|
Wed Sep 22 22:22:12 2010, Koji, Configuration, Computers, Netgear Network Switch fan broken.
|
Thu Sep 23 02:23:04 2010, koji,tara, Summary, Electronics, Testing new TTFSS
|
Thu Sep 23 02:45:30 2010, Koji, Summary, Computers, nodus gracefully rebooted
|
Thu Sep 23 10:34:20 2010, rana, Frogs, Computers, nodus gracefully rebooted
|
Thu Sep 23 11:15:20 2010, Koji, Frogs, Computers, nodus gracefully rebooted
|
Thu Sep 23 13:16:57 2010, Koji, Frogs, Computers, nodus gracefully rebooted
|
Thu Sep 23 12:05:20 2010, josephb, alex, Update, CDS, fb40m down, new fb in progress
|
Thu Sep 23 21:01:11 2010, josephb, alex, Update, CDS, fb40m still down, new fb still in progress
|
Thu Sep 23 23:24:43 2010, rana, johnny, tara, Summary, PSL, AM modulate AOM to measure RefCav Thermo-Optic coefficient
|
Fri Sep 24 00:56:35 2010, koji, tara, Update, Electronics, testing TTFSS
|
|