40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 50 of 175  Not logged in ELOG logo
Entry  Tue Aug 24 06:34:01 2010, Alastair, Update, General, Elog... 
Entry  Tue Aug 24 11:23:32 2010, steve, Update, PEM, tripod leg installation completed 7x
Entry  Tue Aug 24 14:29:18 2010, josephb, Update, elog, Elog down for 1 minute 
Entry  Tue Aug 24 17:57:57 2010, Zach, Update, elog, restarted 
    Reply  Tue Aug 24 22:26:16 2010, Zach, Update, elog, restarted 
Entry  Wed Aug 25 12:40:28 2010, josephb, Update, elog, Reverted back to 2.7.5 until further testing is done 
Entry  Tue Aug 24 12:03:57 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-24_at_6.07.43_PM.png
    Reply  Wed Aug 25 15:32:52 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-25_at_6.26.23_PM.png
       Reply  Wed Aug 25 15:42:01 2010, Jenne, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 
Entry  Wed Aug 25 15:55:33 2010, josephb, Update, elog, Staying with 2.7.5 until passwords sorted out 
Entry  Wed Aug 25 16:13:32 2010, steve, Summary, PEM, PSL optical table is back into operation at 32.75" level P1060764.JPGP1060768.JPGP1060777.JPGP1060776.JPGP1060780.JPG
Entry  Fri Aug 27 07:21:13 2010, Alastair, Update, General, elog... 
Entry  Fri Aug 27 11:24:13 2010, Jenne, Omnistructure, Computers, op540m dead 
Entry  Fri Aug 27 11:27:33 2010, steve, Update, PEM, crane safety document 
Entry  Fri Aug 27 13:41:02 2010, kiwamu, Update, SUS, fix watchdogs  
Entry  Fri Aug 27 22:09:37 2010, Jenne, Update, PSL, The beginnings of the new PSL phoenix.jpg
    Reply  Sat Aug 28 01:02:31 2010, rana, Update, PSL, The beginnings of the new PSL 
Entry  Sat Aug 28 08:17:51 2010, Aberto, Update, Electronics, FSS Frequency Generation Box under test 
Entry  Sun Aug 29 21:18:00 2010, rana, Update, Computers, kallo -> rossa 
    Reply  Mon Aug 30 11:41:34 2010, kiwamu, Update, Computers, disable sendmail and isdn 
Entry  Mon Aug 30 13:57:25 2010, Koji, Summary, PSL, PSL table vibrational performance after the upgrade PEM_100830_SPE.pdfPEM_100830.pdf
    Reply  Mon Aug 30 18:22:00 2010, rana, Summary, PSL, PSL Enclosure is UNSTABLE 
Entry  Mon Aug 30 18:35:22 2010, Jenne, Update, WienerFiltering, Secret Hiding Place for Raw Data 
Entry  Thu Aug 26 13:08:03 2010, josephb, Update, CDS, Watch dogs for Vertex optics turned off 
    Reply  Thu Aug 26 17:10:26 2010, kiwamu, Update, CDS, new CDS test 
       Reply  Fri Aug 27 17:27:41 2010, kiwamu, Update, CDS, new CDS test 
          Reply  Fri Aug 27 19:30:31 2010, rana, Update, CDS, SLOW controls 
          Reply  Mon Aug 30 22:45:49 2010, kiwamu, Update, CDS, binary outputs for the new CDS 
    Reply  Fri Aug 27 14:03:43 2010, kiwamu, Update, CDS, Watch dogs for Vertex optics turned off 
Entry  Tue Aug 31 02:50:45 2010, kiwamu, Update, CDS, vertex suspensions controlled by the new CDS 
Entry  Tue Aug 31 10:44:17 2010, steve, Update, PEM, concrete sealed P1060787.JPG
Entry  Tue Aug 31 11:50:14 2010, kiwamu, Update, CDS, maximum number of BIOs 
Entry  Tue Aug 31 14:47:53 2010, steve, Configuration, PEM, toilet upgrade toil-n.JPG
Entry  Tue Aug 31 13:31:00 2010, steve, Update, PEM, room temp lowered 
    Reply  Tue Aug 31 15:26:46 2010, rana, Update, PEM, room temp lowered 
Entry  Tue Aug 31 16:42:26 2010, josephb, Update, CDS, Temporarily reverting to CDS revision 2005 
Entry  Tue Aug 31 17:58:38 2010, Alberto, Update, Electronics, FSS Frequency Generation Box - Phase Noise 2010-08-31_FSSPhaseNoise04modified.png
Entry  Mon Aug 30 23:21:36 2010, rana, HowTo, PSL, 2W NPRO Mount designed with emachineshop.com software LaserMount.png
    Reply  Tue Aug 31 19:46:00 2010, rana, Update, PSL, PSL upgrade update 
       Reply  Wed Sep 1 08:28:43 2010, Koji, Update, PSL, PSL upgrade update 
    Reply  Wed Sep 1 08:36:59 2010, Koji, HowTo, PSL, 2W NPRO Mount designed with emachineshop.com software 
Entry  Wed Sep 1 07:52:27 2010, Alberto, Configuration, Electronics, PMC board unplugged, turned on Sorensen switches on 1Y1 rack 
    Reply  Wed Sep 1 08:40:28 2010, Alberto, Configuration, Electronics, PMC board unplugged, turned on Sorensen switches on 1Y1 rack 
Entry  Wed Sep 1 10:54:15 2010, steve, Update, PEM, more crane balancing  
Entry  Wed Sep 1 12:24:47 2010, josephb, Update, CDS, Trying to get up to date CDS code runnning 
Entry  Wed Sep 1 11:34:39 2010, Alberto, Update, Electronics, FSS Box Phase Noise from DAQ 2010-09-01_FSSPhaseNoise.png2010-09-01_FSSphaseNoiseMeasurementSetup.png
    Reply  Wed Sep 1 12:34:14 2010, rana, Update, Electronics, FSS Box Phase Noise from DAQ 
       Reply  Wed Sep 1 16:29:28 2010, Alberto, Update, Electronics, FSS Box Phase Noise from DAQ - Measurement setup modified 2010-09-01_FSSPhaseNoise_DAQ_00-02_comparison.png2010-09-01_FSSPhaseNoise_DAQ_02.pngFSSphaseNoiseMeasurementSetup02.png
          Reply  Wed Sep 1 17:17:42 2010, rana, Update, Electronics, FSS Box Phase Noise from DAQ - Measurement setup modified 
Entry  Thu Sep 2 01:48:23 2010, Jenne, Frogs, Treasure, Not cool.... CreepyBug.jpg
Entry  Thu Sep 2 14:11:17 2010, steve, Summary, PEM, south end crane balancing is completed P1060798.JPGP1060800.JPGP1060804.JPG
Entry  Thu Sep 2 16:41:32 2010, steve, Configuration, SAFETY, laser is ON: safety glasses required! 
Entry  Thu Sep 2 16:45:48 2010, josephb, Update, CDS, Numbering scheme of the PCI bus 
Entry  Thu Sep 2 17:43:30 2010, josephb, Update, CDS, One working BO output module, others not so much 
Entry  Thu Sep 2 01:44:13 2010, Jenne, Update, PSL, PSL beam hitting the PMC! 
    Reply  Fri Sep 3 06:55:42 2010, rana, Update, PSL, PSL beam hitting the PMC! 
Entry  Fri Sep 3 11:03:41 2010, Alberto, Frogs, Electronics, Cable cutting tools 
    Reply  Fri Sep 3 13:04:30 2010, Koji, Frogs, Electronics, Cable cutting tools P90.jpg
Entry  Fri Sep 3 23:42:34 2010, Jenne, Update, PSL, PSL update of the day 
    Reply  Mon Sep 6 01:46:58 2010, rana, Update, PSL, PSL update of the day 
Entry  Mon Sep 6 20:38:58 2010, Koji, Update, CDS, Susension model reviewed suspension_model.pdf
    Reply  Mon Sep 6 21:08:44 2010, rana, Update, CDS, Susension model reviewed 
Entry  Mon Sep 6 22:09:11 2010, Alberto, Update, Electronics, RF Frequency Generation Box heat sink installed and tested DSC_2467.JPG2010-09-06_FreqBoxAmplifierTemperatureTrend.pngDSC_2433.JPG
Entry  Tue Sep 7 08:56:00 2010, Alberto, Update, Electronics, Frequency Generation Box Assembly - Phase Noise Measurements 2010-09-03_FreqBoxPhaseNoise_AllOutputsComparison_smooth.png2010-09-03_FreqBoxPhaseNoise_AllOutputsComparison_smooth.pdf
Entry  Tue Sep 7 13:31:49 2010, Alberto, Update, Electronics, RF System - Frequency Distribution Box - Priority Plan Visio-RFsystem_plan_distributiont.pngRFsystem_plant_distribution_priority.png
Entry  Tue Sep 7 15:31:28 2010, josephb, alex, Update, CDS, Binary Output working/ IO chassis fixed 
Entry  Tue Sep 7 15:57:07 2010, Alberto, Configuration, Computers, Nodus connection not working. Fixed 
Entry  Tue Sep 7 20:44:54 2010, Yoichi, HowTo, COMSOL Tips, COMSOL example for calculating mechanical transfer functions 
Entry  Tue Sep 7 22:21:17 2010, Alberto, Configuration, Computers, elog restarted 
Entry  Tue Sep 7 14:42:02 2010, Dmass, Configuration, elog, elog restarted 
    Reply  Tue Sep 7 22:21:47 2010, Dmass, Configuration, elog, elog restarted 
Entry  Tue Sep 7 23:34:15 2010, Kiwamu, Sanjit, Configuration, Computers, e-log 
Entry  Tue Sep 7 23:49:08 2010, sanjit, Configuration, Computers, aldabella network configuration 
Entry  Wed Sep 8 00:01:07 2010, rana, valera, Update, PSL, PMC update 
    Reply  Wed Sep 8 09:50:13 2010, rana, Update, PSL, PSL update 
       Reply  Wed Sep 8 11:46:53 2010, kiwamu, Update, PSL, update of the layout 40mPSL.png
ELOG V3.1.3-