Tue Aug 24 06:34:01 2010, Alastair, Update, General, Elog...
|
Tue Aug 24 11:23:32 2010, steve, Update, PEM, tripod leg installation completed 7x
|
Tue Aug 24 14:29:18 2010, josephb, Update, elog, Elog down for 1 minute
|
Tue Aug 24 17:57:57 2010, Zach, Update, elog, restarted
|
Tue Aug 24 22:26:16 2010, Zach, Update, elog, restarted
|
Wed Aug 25 12:40:28 2010, josephb, Update, elog, Reverted back to 2.7.5 until further testing is done
|
Tue Aug 24 12:03:57 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 
|
Wed Aug 25 15:32:52 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 
|
Wed Aug 25 15:42:01 2010, Jenne, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC
|
Wed Aug 25 15:55:33 2010, josephb, Update, elog, Staying with 2.7.5 until passwords sorted out
|
Wed Aug 25 16:13:32 2010, steve, Summary, PEM, PSL optical table is back into operation at 32.75" level    
|
Fri Aug 27 07:21:13 2010, Alastair, Update, General, elog...
|
Fri Aug 27 11:24:13 2010, Jenne, Omnistructure, Computers, op540m dead
|
Fri Aug 27 11:27:33 2010, steve, Update, PEM, crane safety document
|
Fri Aug 27 13:41:02 2010, kiwamu, Update, SUS, fix watchdogs
|
Fri Aug 27 22:09:37 2010, Jenne, Update, PSL, The beginnings of the new PSL
|
Sat Aug 28 01:02:31 2010, rana, Update, PSL, The beginnings of the new PSL
|
Sat Aug 28 08:17:51 2010, Aberto, Update, Electronics, FSS Frequency Generation Box under test
|
Sun Aug 29 21:18:00 2010, rana, Update, Computers, kallo -> rossa
|
Mon Aug 30 11:41:34 2010, kiwamu, Update, Computers, disable sendmail and isdn
|
Mon Aug 30 13:57:25 2010, Koji, Summary, PSL, PSL table vibrational performance after the upgrade 
|
Mon Aug 30 18:22:00 2010, rana, Summary, PSL, PSL Enclosure is UNSTABLE
|
Mon Aug 30 18:35:22 2010, Jenne, Update, WienerFiltering, Secret Hiding Place for Raw Data
|
Thu Aug 26 13:08:03 2010, josephb, Update, CDS, Watch dogs for Vertex optics turned off
|
Thu Aug 26 17:10:26 2010, kiwamu, Update, CDS, new CDS test
|
Fri Aug 27 17:27:41 2010, kiwamu, Update, CDS, new CDS test
|
Fri Aug 27 19:30:31 2010, rana, Update, CDS, SLOW controls
|
Mon Aug 30 22:45:49 2010, kiwamu, Update, CDS, binary outputs for the new CDS
|
Fri Aug 27 14:03:43 2010, kiwamu, Update, CDS, Watch dogs for Vertex optics turned off
|
Tue Aug 31 02:50:45 2010, kiwamu, Update, CDS, vertex suspensions controlled by the new CDS
|
Tue Aug 31 10:44:17 2010, steve, Update, PEM, concrete sealed
|
Tue Aug 31 11:50:14 2010, kiwamu, Update, CDS, maximum number of BIOs
|
Tue Aug 31 14:47:53 2010, steve, Configuration, PEM, toilet upgrade
|
Tue Aug 31 13:31:00 2010, steve, Update, PEM, room temp lowered
|
Tue Aug 31 15:26:46 2010, rana, Update, PEM, room temp lowered
|
Tue Aug 31 16:42:26 2010, josephb, Update, CDS, Temporarily reverting to CDS revision 2005
|
Tue Aug 31 17:58:38 2010, Alberto, Update, Electronics, FSS Frequency Generation Box - Phase Noise
|
Mon Aug 30 23:21:36 2010, rana, HowTo, PSL, 2W NPRO Mount designed with emachineshop.com software
|
Tue Aug 31 19:46:00 2010, rana, Update, PSL, PSL upgrade update
|
Wed Sep 1 08:28:43 2010, Koji, Update, PSL, PSL upgrade update
|
Wed Sep 1 08:36:59 2010, Koji, HowTo, PSL, 2W NPRO Mount designed with emachineshop.com software
|
Wed Sep 1 07:52:27 2010, Alberto, Configuration, Electronics, PMC board unplugged, turned on Sorensen switches on 1Y1 rack
|
Wed Sep 1 08:40:28 2010, Alberto, Configuration, Electronics, PMC board unplugged, turned on Sorensen switches on 1Y1 rack
|
Wed Sep 1 10:54:15 2010, steve, Update, PEM, more crane balancing
|
Wed Sep 1 12:24:47 2010, josephb, Update, CDS, Trying to get up to date CDS code runnning
|
Wed Sep 1 11:34:39 2010, Alberto, Update, Electronics, FSS Box Phase Noise from DAQ 
|
Wed Sep 1 12:34:14 2010, rana, Update, Electronics, FSS Box Phase Noise from DAQ
|
Wed Sep 1 16:29:28 2010, Alberto, Update, Electronics, FSS Box Phase Noise from DAQ - Measurement setup modified  
|
Wed Sep 1 17:17:42 2010, rana, Update, Electronics, FSS Box Phase Noise from DAQ - Measurement setup modified
|
Thu Sep 2 01:48:23 2010, Jenne, Frogs, Treasure, Not cool....
|
Thu Sep 2 14:11:17 2010, steve, Summary, PEM, south end crane balancing is completed  
|
Thu Sep 2 16:41:32 2010, steve, Configuration, SAFETY, laser is ON: safety glasses required!
|
Thu Sep 2 16:45:48 2010, josephb, Update, CDS, Numbering scheme of the PCI bus
|
Thu Sep 2 17:43:30 2010, josephb, Update, CDS, One working BO output module, others not so much
|
Thu Sep 2 01:44:13 2010, Jenne, Update, PSL, PSL beam hitting the PMC!
|
Fri Sep 3 06:55:42 2010, rana, Update, PSL, PSL beam hitting the PMC!
|
Fri Sep 3 11:03:41 2010, Alberto, Frogs, Electronics, Cable cutting tools
|
Fri Sep 3 13:04:30 2010, Koji, Frogs, Electronics, Cable cutting tools
|
Fri Sep 3 23:42:34 2010, Jenne, Update, PSL, PSL update of the day
|
Mon Sep 6 01:46:58 2010, rana, Update, PSL, PSL update of the day
|
Mon Sep 6 20:38:58 2010, Koji, Update, CDS, Susension model reviewed
|
Mon Sep 6 21:08:44 2010, rana, Update, CDS, Susension model reviewed
|
Mon Sep 6 22:09:11 2010, Alberto, Update, Electronics, RF Frequency Generation Box heat sink installed and tested  
|
Tue Sep 7 08:56:00 2010, Alberto, Update, Electronics, Frequency Generation Box Assembly - Phase Noise Measurements 
|
Tue Sep 7 13:31:49 2010, Alberto, Update, Electronics, RF System - Frequency Distribution Box - Priority Plan 
|
Tue Sep 7 15:31:28 2010, josephb, alex, Update, CDS, Binary Output working/ IO chassis fixed
|
Tue Sep 7 15:57:07 2010, Alberto, Configuration, Computers, Nodus connection not working. Fixed
|
Tue Sep 7 20:44:54 2010, Yoichi, HowTo, COMSOL Tips, COMSOL example for calculating mechanical transfer functions
|
Tue Sep 7 22:21:17 2010, Alberto, Configuration, Computers, elog restarted
|
Tue Sep 7 14:42:02 2010, Dmass, Configuration, elog, elog restarted
|
Tue Sep 7 22:21:47 2010, Dmass, Configuration, elog, elog restarted
|
Tue Sep 7 23:34:15 2010, Kiwamu, Sanjit, Configuration, Computers, e-log
|
Tue Sep 7 23:49:08 2010, sanjit, Configuration, Computers, aldabella network configuration
|
Wed Sep 8 00:01:07 2010, rana, valera, Update, PSL, PMC update
|
Wed Sep 8 09:50:13 2010, rana, Update, PSL, PSL update
|
Wed Sep 8 11:46:53 2010, kiwamu, Update, PSL, update of the layout
|
|