   +  Reply  Wed Jul 9 16:33:05 2014, manasa, Update, PSL, PMC ringdown setup 
Entry  Wed Jul 9 12:01:43 2014, Akhil, Configuration, Electronics, Setup Plan for placing the Frequency Counter inside the lab setup.pngSetupFC.png
Entry  Wed Jul 9 08:50:30 2014, Akhil, Update, General, Weekly Update 
Entry  Tue Jul 8 23:59:49 2014, Harry, Update, General, Weekly Plan (7.8.14) 
   +  Reply  Tue Jul 8 22:53:02 2014, Jenne, Rana, Update, Electronics, Transmon QPD / whitening 
   +  Reply  Tue Jul 8 18:20:15 2014, jamie, Omnistructure, Electronics, Jamie 1811 power supply fixed! 
Entry  Tue Jul 8 16:45:15 2014, Nichin, Update, General, Weekly plan 
Entry  Tue Jul 8 15:07:24 2014, Nichin, HowTo, Electronics, RF Multiplexer in rack 1Y1 RF_Multiplexers.png
Entry  Tue Jul 8 09:02:02 2014, Akhil, Update, Electronics, PSD Plots for different sampling times of the Frequency Counter 7x
Entry  Tue Jul 8 01:55:21 2014, Jenne, Update, SUS, ETMX glitching 
   +  Reply  Mon Jul 7 18:11:04 2014, Koji, Update, General, Beam Waists 
   +  Reply  Mon Jul 7 16:39:26 2014, Steve, Update, PEM, ants on the PSL table 
   +  Reply  Mon Jul 7 13:56:13 2014, Akhil, Configuration, Electronics, Setup Used for Characterization of Frequency Counter FreqVsTime.pngMissing_Data.png
Entry  Mon Jul 7 13:55:26 2014, Jenne, Update, LSC, c1cal model restarted 
   +  Reply  Mon Jul 7 13:44:21 2014, Jenne, Update, CDS, c1sus - bad fb connection 
   +  Reply  Mon Jul 7 11:02:22 2014, manasa, Configuration, General, IFO status post earthquake 
Entry  Mon Jul 7 08:13:41 2014, steve, Update, General, yes,there was firework 8days.png
Entry  Sat Jul 5 04:18:45 2014, Andres, Update, 40m Xend Table upgrade, Adding Two Lenses After the Second Steering Mirror in Order Two Increase the Gouy Phase Difference Between the Sterring Mirrors 7x
   +  Reply  Wed Jul 2 22:58:11 2014, Jenne, Update, LSC, Little Bo-Peep has found her phase 
   +  Reply  Wed Jul 2 16:18:32 2014, Jenne, Update, ASC, IFO aligned, PRMI + 2 arms achieved 
Entry  Wed Jul 2 16:16:45 2014, Nichin, Update, General, LAN wire added 
   +  Reply  Wed Jul 2 11:47:26 2014, Steve, Update, VAC, broken changeover regulator of N2 supply 
   +  Reply  Tue Jul 1 21:20:37 2014, Akhil, Update, Electronics, Gain plots of UFC-6000 for 0.1s Sampling Rate  gain.pnggain.pdf
Entry  Tue Jul 1 18:06:13 2014, nichin, Update, Computer Scripts / Programs, Network Analyzer NWAG4395A data acquisition LPF2_01-07-2014_175443.pdf
Entry  Tue Jul 1 13:57:33 2014, ericq, Update, Computer Scripts / Programs, MC Autolocker on Megatron 
   +  Reply  Mon Jun 30 22:40:21 2014, Manasa, Update, PSL, AOM ringdown AOM_ringSample1.pdf
   +  Reply  Mon Jun 30 00:18:15 2014, Nichin, Update, Computer Scripts / Programs, Updated script for acquiring data from Agilent 4395A network analyzer 
Entry  Fri Jun 27 20:52:30 2014, Koji, Update, CDS, OTTAVIA was not on network 
Entry  Fri Jun 27 10:09:10 2014, Harry, Update, General, Beam Waist Measurement BeamWaist.zip
Entry  Wed Jun 25 20:45:04 2014, Nichin, Update, Electronics, AS55 Bodeplot AS55_06-25-2014.zipAS55_bodeplot.pdf
Entry  Wed Jun 25 19:29:19 2014, Akhil, Update, Electronics, Analog-to-Digital Converter IMG_1496.png
Entry  Wed Jun 25 17:49:36 2014, Harry, Update, General, Razorblade Analysis Pt. 2 RazorbladeSetup.pdf
Entry  Wed Jun 25 17:13:10 2014, Nichin, Update, Electronics, Laser power check - PDFR system 
Entry  Wed Jun 25 14:52:22 2014, Andres Medina, Update, elog, Placing a lens between the steering mirrors and another lens between the second steering mirror and the cavity SchematicForXendGreenGoingToTheCavity.pdf
Entry  Wed Jun 25 09:30:44 2014, Harry, Update, General, Weekly Update Weekly_Update—June_25_thru_July_1.pdf
   +  Reply  Wed Jun 25 09:17:33 2014, Harry, Manasa, Update, General, Razorblade Beam Analysis Setup 
Entry  Wed Jun 25 09:16:52 2014, Harry, Update, General, Razorblade Measurements 40m.zip
Entry  Wed Jun 25 02:01:21 2014, Nichin, Summary, General, Weekly Report Nichin_Week4_update.pdf
Entry  Wed Jun 25 01:18:24 2014, Akhil, Update, elog, Weekly Update 
   +  Reply  Tue Jun 24 22:46:15 2014, ericq, Update, Computer Scripts / Programs, op340m crons 
   +  Reply  Tue Jun 24 18:35:53 2014, Jenne, Update, LSC, Still no beam going to IFO 
   +  Reply  Tue Jun 24 16:52:43 2014, Nichin, Update, Electronics, An RF cable re-installed 
   +  Reply  Mon Jun 23 21:16:14 2014, Nichin, Update, Electronics, Transimpedence measurement-BBPD BBPD_transimpedence_06-23-2014.pdfBBPD_readings_06-23-2014.zip
   +  Reply  Sat Jun 21 01:46:28 2014, Nichin, Update, Electronics, BBPD Transimepedence plot BBPD_06-18-2014.pdfBBPD_readings_06-18-2014.zip
Entry  Sat Jun 21 01:25:12 2014, Nichin, HowTo, Electronics, PD Trasimpedence measurement theory Transimpedence_Calculation_.pdf
Entry  Fri Jun 20 14:42:57 2014, steve, Update, SUS, vac illuminators turned off 
Entry  Fri Jun 20 11:43:30 2014, ericq, Update, Computer Scripts / Programs, Restarting ELOG 
Entry  Thu Jun 19 17:28:19 2014, Steve, Update, PSL, window device is ready for test softW2.jpgsoftW2b.jpg
   +  Reply  Thu Jun 19 14:52:20 2014, not ericq, Update, Computer Scripts / Programs, control room bashrc change 
   +  Reply  Thu Jun 19 14:12:45 2014, steve, Update, safety, optical table scans 