    Reply  Tue Sep 3 14:23:21 2013, Steve, Update, PEM, earthquakes EQm6&5.png
 ~Vancuver, Canada earthquakes: magnitude 6,  5  and more shaking
 
Entry  Wed Nov 14 14:35:38 2018, Steve, Update, ALARM, emergency calling list for 40m Lab  
It is posted at the 40m wiki with Gautam' help. Printed copies posted around doors
also.
Entry  Mon Sep 20 17:10:10 2010, steve, Configuration, PSL, enclosure beam guides to IFO are installed  
The PSL out  2" OD beam guide tube was cut  1.5" shorter to 13.5"
The 10" OD  0.25" wall Al tube was replaced by a  lighter, not anodized and thinner  wall 0.094" tube of 15.5"
lenght, that is 0.75" shorter.
Entry  Thu Apr 6 15:35:44 2017, Steve, Update, PEM, envioirmental noise 
Building:         Central Engineering Services

     

Date:             Monday, 04/10/17          
    Reply  Tue Feb 5 09:08:11 2013, Steve, Update, PEM, exterier doors to be painted IMG_0055.JPG


    
        
            Quote:
        
        
            

           The wood exteier walls, gutters and doors were painted at CES-Annex building #69
Entry  Tue Feb 11 16:49:36 2014, Steve, Update, PEM, floor cleaning 
 Keven, Steve
 
The floor was cleaned under the east arm tube with hand held wet towel. We moved staff around and mopped. I did at the bottom of rack  1Y1,
    Reply  Tue Feb 18 10:10:07 2014, Steve, Update, PEM, floor cleaning under racks 


    
        
            Quote:
        
        
            

            Keven, Steve
    Reply  Tue Mar 4 17:07:27 2014, Steve, Update, PEM, floor cleaning under racks 


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Wed Jun 29 14:32:22 2016, Steve, Update, SUS, how to remove epoxy from optics 
 

Hi Steve -
    Reply  Thu Jun 30 10:03:16 2016, Steve, Update, SUS, how to remove epoxy from optics SOSsoakDish.jpgSOSsoakDish_tv.jpg
Proposed Acetone soak dish for SOS epoxy softening.

It has good acces through 5" top ID. The set up is stable and teflon lined.

Materials: glass jar with SS cover, teflon bricks, 0.008" teflon wrapped "high density Drever bricks" and aluminum
    Reply  Tue Jul 5 09:25:31 2016, Steve, Update, SUS, how to remove epoxy from optics SOSsoakingDish.jpgSOSsoakingD.jpg
Glass soaking dish with teflon guides.




Quote:



Proposed Acetone soak
Entry  Wed Oct 20 16:41:41 2010, steve, Omnistructure, General, laser chiller leaving for MIT P1060929.JPG
 
    Reply  Mon Jul 26 08:51:31 2010, steve, Update, PEM, lowering AC setpoint by 2F makes PSL happy htempRTemp.jpg


    
        
            Quote:
        
        
            
            The control room temp is warmer than usual. The heat exchanger Office Pro 18 set point was lowered from 70 to 68F
Entry  Wed Sep 1 10:54:15 2010, steve, Update, PEM, more crane balancing  
Crane balancing at the south end is continuing today.
    Reply  Wed Jul 10 14:49:00 2013, Steve, Update, Green Locking, more fiber protective tubing layed  fibreETMXprotectedendOnly.jpg


    
        
            Quote:
        
        
            

           Craig, Gautam and Steve,
Entry  Fri Aug 13 18:32:48 2010, steve, Update, PEM, new legs attached to optical table P1060612.JPGP1060626.JPGP1060631.JPGP1060636.JPG
Koji, Rana and Steve
 
The floor preparation continued today. The really messy part of drilling and jack-hammering the concrete were done in controlled manner.
Entry  Fri Sep 19 11:48:14 2008, steve, Update, Computers, old hubs can make one happy P1020934.jpg
Joseph finds a XIX century bottle neck hub: CentreCOM 3624TR 10Base-T 
and happily replaces it with Netgear GS724T 1000Base-T 
    Reply  Thu Feb 23 10:53:54 2012, steve, Update, SUS, oplev PIT transfer functions oplPITtrans.pdf
 Oplev transfer functions PIT UGF were optimized to be at 2-3 Hz with 60 degree minimum phase margin by adjuting oplev gains.
Additional Notes by KI:

    The PRM oplev has a tailored 3.3 Hz resonant gain in order to calm down a wobble during the
    Reply  Mon Feb 27 14:35:22 2012, steve, Update, SUS, oplev YAW transfer functions oplYAWtransf.pdf
 The BS and the PRM have 3.3 Hz resonant gain filters that kill the phase margins.
 
    Reply  Wed May 14 10:04:06 2014, Steve, Summary, SUS, oplev laser and temperature TempRules.png
 ETMX oplev qpd gain has to be increased.
 
Entry  Fri Oct 18 15:18:49 2013, Steve, Update, PEM, particle count peak or ... PEMcount?.pngPemCountPeak?No.png
Sunday evening fireworks. Manasa heard it.
    Reply  Wed Nov 13 11:30:07 2013, Steve, Update, PEM, particle counter MOVED Met1Moved.JPG
Particle counter moved from the top of IOOC to the east wall
    Reply  Tue Oct 23 09:37:33 2012, Steve, Update, SUS, passive TT adjustment correction IMG_1745.JPG


    
        
            Quote:
        
        
            

           Tip Tilt pitch adjustment on existing-in vacuum suspension. This can be added by a simple installation of a 1.25" long 2-56 threaded
    Reply  Wed Jan 6 10:58:03 2016, Steve, Update, General, projector light bulb is out 
Projector light bulb ordered




Quote:



 
    Reply  Thu Nov 3 12:40:10 2016, gautam, Update, General, projector light bulb is out 
The projector failed just now with a pretty loud 'pop' sound - I've never been present when the lamp goes out, so I don't know if this
is usual. I have left the power cable unplugged for now...

Replacement is ordered Nov 4
    Reply  Fri Nov 18 15:10:06 2016, Steve, Update, General, projector shipped out for repair 
Vivitek D952HD sn2160130 was send out for warranty repair. It's hard to believe that it has a 5 year warranty...... RMA - WR16004483.....expected
to be back by Friday, Dec 2




    Reply  Wed May 21 09:35:33 2014, Steve, Update, SUS, razor beam dumps ETMX_ISCT 9rbdETMY.jpg


    
        
            Quote:
        
        
            

           Anodized aluminum dumps replaced by 6 razor beam dumps.
    Reply  Mon Sep 24 17:47:05 2012, Steve, Update, VAC, ready to pump 
  The IFO will be at atmosphere  overnight. The annuloses are pumped down. The access connector jam nuts are tightened to 45 ft/lbs
Actual pumpdown will start
tomorrow morning.
    Reply  Tue Sep 18 14:02:37 2018, Steve, Update, safety, safety training 
Yuki Miyazaki received 40m specific basic safety training.

 
Entry  Thu Feb 24 16:47:26 2011, steve, Configuration, PSL, shutter is back on the PSL output P1070441.JPG
Uniblitz mechanical shutter was placed into the beam path of the PSL output with razor beam trap. The output power was 1.39W at 2.08A
It is working from the MEDM screen "old map" C1IOO_Mech_Shutter.adl
    Reply  Fri Nov 16 10:26:12 2018, Steve, Update, VAC, single viton O-rings Single-O-ring.png
The 40m vacuum envelope has one large single O-ring on the OOC west side. All other doors have double O-ring with annuloses.

There are 3  spacers to protect o-ring. They should not be removed!

 
Entry  Tue Mar 23 10:11:13 2010, steve, Update, PEM, small air cond unit failed yesterday 20datm.jpg
Old control room air condition failed yesterday around noon. It was blowing 80-85F hot air for about 2-3 hours at racks 1Y4-7 and the entry room 103
    Reply  Tue Oct 22 10:12:33 2013, Steve, Update, PEM, south arm AC intake duct checked PEM0.5micron60d.pngsouthArmIntakeNorth.jpgSouthArmMidIntakeWipe.jpg
  The 4th week of no wet mopping of the floor  and no wet wiping  the vacuum envelope.
 
We cleaned the intakes of the south arm IFO air condition. The bottom duct have quite a bit accumulation Atm1
    Reply  Tue Mar 26 16:36:24 2013, Steve, Update, 40m Upgrading, table leveling mounts go here  optabSTAND.PDFswivvelMountEE.jpg


    
        
            Quote:
        
        
            

           Steve's suggestion for how to level the end table using "swivel leveling mounts":
    Reply  Fri Mar 29 16:30:27 2013, Steve, Update, 40m Upgrading, table leveling mounts go here  


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Tue Jan 28 16:26:40 2014, Steve, Update, VAC, vacuum computers are back without safety c1vac1_vac2areback.png


    
        
            Quote:
        
        
            

           [Steve Koji]
    Reply  Wed Feb 5 08:14:59 2014, Steve, Update, VAC, vacuum computers are back without safety 


    
        
            Quote:
        
        
            

            
    Reply  Tue Jun 21 14:12:10 2016, Steve, Update, PEM, vacuum envelope wiped 60dPEM.png
I wiped down the cranes with wet towel and Mario our janitor did the chamber tops with the tubes.

The optical tabels were not touched.

The outside temp peaked at 44 C yesterday
    Reply  Thu Jan 2 10:50:24 2014, Steve, Update, VAC, vacuum monitor is still blank Help.pngvacation.png20131220lastRGAscan.png
 The date is correct on this monitor.
Last stored RGA scan data Dec 20, 2013
IFO pressure at CC1 5.8e-6 Torr
    Reply  Thu Jan 2 13:35:06 2014, Koji, Update, VAC, vacuum monitor is still blank 
We probably need to restart the machine, but I didn't want to touch c1vac1 and c1vac2. 
    Reply  Tue Jan 28 11:13:50 2014, Koji, Update, VAC, vacuum monitor is still blank 
[Steve Koji]
We pushed the reset button of c1vac1 and c1vac2 and the vacuum screen is back.
First, we pushed the reset button of c1vac1 and pushed the one on c1vac2.
    Reply  Fri Oct 16 18:27:52 2015, Steve, Update, VAC, vacuum normal condition oct16Fpm2015.png
Vacuum normal configuration with VM1-closed, VM2-open valve positions. Power load normal 24V 0.2A

Maglev rotation 560 Hz at room temp body temp.

"NO COMM" error message on medm screen. Gauge controller pressures are read able.
    Reply  Thu Jun 28 08:09:51 2018, Steve, Update, CDS, vacuum pneumatic N2 pressure 320d_N2.png
The fardest I can go back on channel C1: Vac_N2pres is  320 days

C1:Vac-CC1_Hornet Presuure gauge started logging Feb. 23, 2018

Did you update the " low N2 message"  email addresses?
    Reply  Thu Jun 28 10:28:27 2018, rana, Update, CDS, vacuum pneumatic N2 pressure 
we disabled logging the N2 Pressure to a text file, since it was filling up disk space. Now it just sends an email to our 40m mailing list, so we'll
all get a warning.

The crontab uses the 'bash' version of output redirection '2>&1', which redirects stdout and stderr, but probably we just
Entry  Wed Apr 8 09:36:20 2009, steve, Configuration, VAC, valve condition changed to BG to calibrate the RGA 
Vacuum normal valve condition was changed to accommodate SRS-RGA calibration.

 
    Reply  Thu Dec 5 11:06:43 2013, Steve, Update, Cameras, viewport video ccd cameras are all covered PRMcamera.jpgPRMcameraCover.jpgFaradayCameraCover.jpg


    
        
            Quote:
        
        
            

           
            
                
           
Entry  Thu Jun 19 17:28:19 2014, Steve, Update, PSL, window device is ready for test softW2.jpgsoftW2b.jpg
The window is at the north west corner of the  PSL enclosure.
The 1 mm thick BK7 window is AR coated both side R <0.08%,  W2-PW1-1004-1064-0
The PZT stack is 0.75" OD, 0.25" thick with  ~ 6 mm ID,  motion
    Reply  Thu Jul 28 08:42:36 2016, Steve, Update, SUS, wire clamp e12342.jpg
The clamp is in the machine for milling off the grooves. It's condition is normal. The edges needs some 800 sand paper so it is not sharp anywhere.

How did those nicks get on the edge? Fortunatelly they did not aligned with the wire.

 
    Reply  Wed Jun 1 15:01:56 2016, Steve, Update, SUS, wire standoffs update 06011603.PDF06011602.PDFsapphire_stand_off_v2.pdfside_OSEM_ETMY.jpg5p2wsf.png
There are some issues with 5 mm sapphire prism Atm5. It will cause  interference between one of the prisms and the Side OSEM.

Here are some drawings to see the issues with larger wire standoff.

The 2 mm prism will work.with a 1 mm longer dumbell.
    Reply  Thu Jun 2 16:35:44 2016, Koji, Update, SUS, wire standoffs update sapphire_stand_off_v3.pdfarrangement-v3.pdf
Gap of the prism from the mirror

Sag: s = R(1-Cos[ArcSin[d/2/R]])

- Mirror curvature sag for 2mm prism (R=37.75mm): s=13um