40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 3 of 349  Not logged in ELOG logo
Entry  Fri Jan 23 16:33:27 2009, pete, Update, oplevs, x-arm oplev calibrations 
    Reply  Thu Jan 29 17:24:41 2009, Kakeru, Update, oplevs, arm cavity oplev calibration 
Entry  Mon Mar 9 17:11:38 2009, Alberto, Configuration, oplevs, optical levers centering 
    Reply  Sat Mar 14 22:53:12 2009, Kakeru, Update, oplevs, arm cavity oplev calibration oplev.pdf
    Reply  Fri Mar 20 15:37:58 2009, Kakeru, Update, oplevs, arm cavity oplev calibration 
    Reply  Thu Mar 26 09:08:18 2009, Kakeru, Update, oplevs, arm cavity oplev calibration 
Entry  Fri May 8 04:46:01 2009, rana, yoichi, Summary, oplevs, BS/PRM/SRM table bad! a.png
Entry  Tue May 12 17:26:56 2009, pete, Update, oplevs, etmy oplev quad was bad bad_oplev_quad.pdf
    Reply  Wed May 13 03:05:13 2009, pete, Update, oplevs, etmy oplev quad was bad 
Entry  Tue Jun 2 23:55:45 2009, Alberto, Update, oplevs, oplevs centerd 
Entry  Tue Jun 9 11:29:07 2009, Jenne, Update, oplevs, Measured ETMY oplev beam size...put everything back 
Entry  Fri Jul 24 17:20:48 2009, Jenne, Update, oplevs, ETMY oplev is iffy 
Entry  Mon Jul 27 17:48:44 2009, Jenne, Update, oplevs, ETMY oplev is still down for the count 
Entry  Fri Dec 4 21:48:01 2009, Jenne, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered Oplev_IPang_screenshot_4Dec2009.png
    Reply  Fri Dec 4 23:17:55 2009, rob, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered 
    Reply  Sat Dec 5 01:40:11 2009, Koji, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered 
    Reply  Sat Dec 5 18:23:48 2009, Koji, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered Screenshot_091205_1830.png
Entry  Fri Feb 19 02:38:32 2010, Koji, Configuration, oplevs, Intsant green oplevs for ITMs shooting from the ends 
Entry  Tue Apr 22 22:19:02 2008, rob, Metaphysics, lore, jiggling sliders 
Entry  Sun Nov 2 20:21:58 2008, rana, Configuration, lore, HP 5550dtn (Grazia) set up on allegra 
    Reply  Thu Jan 8 16:49:37 2009, rana, Configuration, lore, HP 5550dtn (Grazia) set up on allegra 
Entry  Wed May 13 02:53:12 2009, rob, Summary, lore, Channel Hopping: That ancient enemy (MC problems) 
    Reply  Wed May 13 14:43:29 2009, rob, Summary, lore, Channel Hopping: That ancient enemy (MC problems) MC3sidemon.png
Entry  Fri Oct 23 15:02:00 2009, rob, Update, lore, marconi phase 
    Reply  Sat Oct 24 04:57:33 2009, rana, Update, lore, marconi phase 
Entry  Mon Dec 14 15:18:18 2009, Jenne, Update, lore, armLoss script ran....results confidential 
    Reply  Wed Feb 3 09:01:42 2010, rob, Update, lore, IFO isn't playing nice tonight 
Entry  Fri Feb 12 14:19:28 2010, rana, steve, HowTo, lore, International Fax 
Entry  Wed Oct 6 14:49:54 2010, rana, Summary, lore, Steve on the sea jacques.jpg
Entry  Mon Jul 11 14:03:37 2011, steve, HowTo, lore, how to visit your old lab P1080069.JPG
Entry  Sun May 27 17:19:27 2012, rana, Summary, lore, Strawberries 20120527_145826.jpg
Entry  Mon Jul 22 03:10:41 2013, rana, Summary, lore, Angel of the Y End Table? asdasd.jpg
    Reply  Mon Jul 22 06:58:17 2013, Lisa, Summary, lore, Angel of the Y End Table? image.jpg
Entry  Fri May 16 20:55:18 2014, Jamie, Frogs, lore, un-full-screening Ubuntu windows with F11 
Entry  Wed Mar 29 09:24:28 2017, Steve, Update, lore, summery pages 
    Reply  Tue May 21 17:03:45 2013, Steve, Update, endtable upgrade, enclosure tops are sealed  ETMYoptable.jpgsurgtubclamps.jpgquickrelease.jpgreinforcbridge.jpg
    Reply  Thu May 23 12:02:48 2013, Steve, Update, endtable upgrade, ETMY - oplev ETMYopl.jpg
    Reply  Thu May 30 11:10:00 2013, Steve, Update, endtable upgrade, ETMY - oplev ETMYoplev.jpg
    Reply  Thu May 30 20:45:53 2013, Annalisa, Update, endtable upgrade, ETMY - oplev 
    Reply  Fri May 31 11:15:01 2013, Annalisa, Update, endtable upgrade, ETMY - Mode Matching for green - new calculation 
Entry  Tue Jun 4 10:44:13 2013, Steve, Update, endtable upgrade, PI pzt holders are ready PIpztholders.jpg
    Reply  Thu Jun 6 09:58:13 2013, Steve, Update, endtable upgrade, enclosure to chamber connection thinwallconnector.jpg06061301.PDF
Entry  Tue Jun 25 19:18:07 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation 
    Reply  Wed Jul 3 21:19:04 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation DAC_bank.pngASC_schematic.pdf
    Reply  Mon Jul 8 13:45:19 2013, gautam, Configuration, endtable upgrade, Driver board verification 
    Reply  Wed Jul 10 22:41:06 2013, gautam, Configuration, endtable upgrade, PZT Driver Board HV_Amplifier.pdf
Entry  Thu Jul 11 09:15:10 2013, Steve, Update, endtable upgrade, ETMY optable grounded 
    Reply  Mon Jul 15 11:51:18 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum max_amp.JPGmax_amp_all_channels.JPGDACOffPowerSpec.pdfDACOnPowerSpec.pdfDAC2kPowerSpectrum.pdf
    Reply  Mon Jul 15 13:51:17 2013, Koji, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum 
    Reply  Mon Jul 15 15:54:20 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units DACOffPSD.pdfDAC500PSD.pdfDAC2000PSD.pdf
ELOG V3.1.3-