14294
|
Wed Nov 14 14:35:38 2018 |
Steve | Update | ALARM | emergency calling list for 40m Lab |
It is posted at the 40m wiki with Gautam' help. Printed copies posted around doors also. |
3591
|
Mon Sep 20 17:10:10 2010 |
steve | Configuration | PSL | enclosure beam guides to IFO are installed |
The PSL out 2" OD beam guide tube was cut 1.5" shorter to 13.5"
The 10" OD 0.25" wall Al tube was replaced by a lighter, not anodized and thinner wall 0.094" tube of 15.5" lenght, that is 0.75" shorter.
The new position of the PSL table made these cuts necessary. |
12930
|
Thu Apr 6 15:35:44 2017 |
Steve | Update | PEM | envioirmental noise |
Building: Central Engineering Services
Date: Monday, 04/10/17
Time: 7:00 AM TO 9:00 AM
Notification: Crane Activity
Contact: Ben Smith, X-4190 Brad Nielsen, X-8751
Contractors will be removing the large vaporizer located on the South
side of CES. Vehicle access will be restricted due to crane placement
and operation, but there will be a single traffic lane available. This
work may create minor noise and vibrations. |
7999
|
Tue Feb 5 09:08:11 2013 |
Steve | Update | PEM | exterier doors to be painted |
Quote: |
The wood exteier walls, gutters and doors were painted at CES-Annex building #69
|
The east and south end of the 40m emergency exit doors are sealed- tapped off temporarily. They will be painted on the out side only. This job will be done by tomorrow noon
Do not open chamber if you smell the paint ! |
9623
|
Tue Feb 11 16:49:36 2014 |
Steve | Update | PEM | floor cleaning |
Keven, Steve
The floor was cleaned under the east arm tube with hand held wet towel. We moved staff around and mopped. I did at the bottom of rack 1Y1, 2 and 3.
Last week we did the south arm tube floor.
Next week we 'd like to clean under rack 1X1,2,3, 4, 5, 6 and 7 |
9643
|
Tue Feb 18 10:10:07 2014 |
Steve | Update | PEM | floor cleaning under racks |
Quote: |
Keven, Steve
The floor was cleaned under the east arm tube with hand held wet towel. We moved staff around and mopped. I did at the bottom of rack 1Y1, 2 and 3.
Last week we did the south arm tube floor.
Next week we 'd like to clean under rack 1X1,2,3, 4, 5, 6 and 7
|
Keven, Steve
1Y4, 1X1,2,3,4 & 5 instrument racks floor space were cleaned. |
9689
|
Tue Mar 4 17:07:27 2014 |
Steve | Update | PEM | floor cleaning under racks |
Quote: |
Quote: |
Keven, Steve
The floor was cleaned under the east arm tube with hand held wet towel. We moved staff around and mopped. I did at the bottom of rack 1Y1, 2 and 3.
Last week we did the south arm tube floor.
Next week we 'd like to clean under rack 1X1,2,3, 4, 5, 6 and 7
|
Keven, Steve
1Y4, 1X1,2,3,4 & 5 instrument racks floor space were cleaned.
|
Keven, Steve
1X6, 1X7 and 1X9 instrument racks floor space were cleaned today |
12227
|
Wed Jun 29 14:32:22 2016 |
Steve | Update | SUS | how to remove epoxy from optics |
Hi Steve -
I found the doc I was looking for:
https://dcc.ligo.org/LIGO-E1200821
Specifically, you might find guidance in Section 5 and the pictures at the end of the doc. This should work for Vacseal as well.
Good luck - it will take some time (hours to day or 2)...
I'll be interested to know how it goes.
GariLynn helped us develop this procedure so you could also ask her to cast an eye over the setup if you are worried.
-Betsy
ps: there is no existing fixture to hold SOS optic while soaking it
|
12231
|
Thu Jun 30 10:03:16 2016 |
Steve | Update | SUS | how to remove epoxy from optics |
Proposed Acetone soak dish for SOS epoxy softening.
It has good acces through 5" top ID. The set up is stable and teflon lined.
Materials: glass jar with SS cover, teflon bricks, 0.008" teflon wrapped "high density Drever bricks" and aluminum
Drever brick: I beleive it is a Tungsten alloy. We used it as vac-bat savor at the coffe can. It has high density, heavy and hard, it was never identified.
I will soak one brick to see if it has any reaction ability with acetone.
NO means that only Glass and Teflon can be used for this fixture in Acetone. We can not take a chance on the coating!
I guess the small surface area Aluminum dumbbell, guide rod and-or wire standoff, magnet and epoxy does not degrade the acetone such way that it effects our coating.
Not ot mention, that only the very edge of the coating would in this solution.
|
12241
|
Tue Jul 5 09:25:31 2016 |
Steve | Update | SUS | how to remove epoxy from optics |
Glass soaking dish with teflon guides.
Quote: |
Proposed Acetone soak dish for SOS epoxy softening.
It has good acces through 5" top ID. The set up is stable and teflon lined.
Materials: glass jar with SS cover, teflon bricks, 0.008" teflon wrapped "high density Drever bricks" and aluminum
Drever brick: I beleive it is a Tungsten alloy. We used it as vac-bat savor at the coffe can. It has high density, heavy and hard, it was never identified.
I will soak one brick to see if it has any reaction ability with acetone.
NO means that only Glass and Teflon can be used for this fixture in Acetone. We can not take a chance on the coating!
I guess the small surface area Aluminum dumbbell, guide rod and-or wire standoff, magnet and epoxy does not degrade the acetone such way that it effects our coating.
Not ot mention, that only the very edge of the coating would in this solution.
|
|
3745
|
Wed Oct 20 16:41:41 2010 |
steve | Omnistructure | General | laser chiller leaving for MIT |
|
3288
|
Mon Jul 26 08:51:31 2010 |
steve | Update | PEM | lowering AC setpoint by 2F makes PSL happy |
Quote: |
The control room temp is warmer than usual. The heat exchanger Office Pro 18 set point was lowered from 70 to 68F yesterday.
The MOPA headtemp is higher also. The Neslab chiller bath temp peaks around 21.6 C daily. This should be rock solid 20.00 C
It did not have any effect.
Now, I have just lowered the thermostat setting of room 101 from 73 to71F I hope Koji can take this.
|
Little change in the AC set temp can make wonders. Neslab chiller bath temp 19.99C is back to normal and daily variation of PSL are much better. |
3505
|
Wed Sep 1 10:54:15 2010 |
steve | Update | PEM | more crane balancing |
Crane balancing at the south end is continuing today. |
8822
|
Wed Jul 10 14:49:00 2013 |
Steve | Update | Green Locking | more fiber protective tubing layed |
Quote: |
Craig, Gautam and Steve,
Single mode fiber 50m long is layed out into cable tray that is attached to the beam tube of the Y arm.
It goes from ETMY to PSL enclosure. It is protected at both ends with " clear- nylon slit corrugated loom tubing " 1.5" ID
The fiber is not protected between 1Y1 and 1Y4
|
Installed 0.5" ID 10 ft long protective tubing at the PSL end of the ETMY fiber this morning. Here I had to cable tie a bunch of cables at the east side of the PSL enclosure.
They were hanging off the table blocking space were the sliding doors move.
At the ETMX end of the X-arm fiber received the same protective tubing. |
3422
|
Fri Aug 13 18:32:48 2010 |
steve | Update | PEM | new legs attached to optical table |
Koji, Rana and Steve
The floor preparation continued today. The really messy part of drilling and jack-hammering the concrete were done in controlled manner.
Particle counts peaked at 106K of 0.3 micron and 13 K of 1.0 micron particles/ cfmin at the top of SP table.
Legs were installed with the help of Koji and strongman Rana. Professor Rana was very useful lifting the 85 lbs legs.
Atm1, Drilling holes for ribbed bar reinforcement of concrete
Atm2, Koji and Rana are playing hide and seek while installing legs
Atm3-4, 6 Rigid tripod legs attached by 6x3 of 1/4-20x 7/8 screws. The top plates of the legs were torqued to 108 ft/lbs by Rana |
974
|
Fri Sep 19 11:48:14 2008 |
steve | Update | Computers | old hubs can make one happy |
Joseph finds a XIX century bottle neck hub: CentreCOM 3624TR 10Base-T
and happily replaces it with Netgear GS724T 1000Base-T |
6309
|
Thu Feb 23 10:53:54 2012 |
steve | Update | SUS | oplev PIT transfer functions |
Oplev transfer functions PIT UGF were optimized to be at 2-3 Hz with 60 degree minimum phase margin by adjuting oplev gains.
Additional Notes by KI:
- The PRM oplev has a tailored 3.3 Hz resonant gain in order to calm down a wobble during the lock acquisitions.
- Also in the PRM oplev a 35 Hz elliptic cut-off filter wasn't activated at the time when Steve measured it.
- In both ITMs, elliptic cut-off filters seem to have higher corner frequencies compered with the others.
- I guess these settings are from the old days.
- ETMs and ITMs have whitening filters while the rest of the suspensions don't.
- Without the whitening filters, normally the signals above 30 Hz are covered by some electrical noises or perhaps He-Ne laser intensity noise (#5630).
- This is why we usually use the 35 Hz elliptic filters to roll off the control noises.
- Since the ETMs and ITMs have whitening filters they potentially can have slightly higher corner frequencies in the elliptic filters.
- Of course the corner frequencies need to be re-designed in terms of the amount of noise injection to the longitudinal motion.
|
6323
|
Mon Feb 27 14:35:22 2012 |
steve | Update | SUS | oplev YAW transfer functions |
The BS and the PRM have 3.3 Hz resonant gain filters that kill the phase margins.
|
9952
|
Wed May 14 10:04:06 2014 |
Steve | Summary | SUS | oplev laser and temperature |
ETMX oplev qpd gain has to be increased.
|
9254
|
Fri Oct 18 15:18:49 2013 |
Steve | Update | PEM | particle count peak or ... |
Sunday evening fireworks. Manasa heard it. |
9374
|
Wed Nov 13 11:30:07 2013 |
Steve | Update | PEM | particle counter MOVED |
Particle counter moved from the top of IOOC to the east wall |
7595
|
Tue Oct 23 09:37:33 2012 |
Steve | Update | SUS | passive TT adjustment correction |
Quote: |
Tip Tilt pitch adjustment on existing-in vacuum suspension. This can be added by a simple installation of a 1.25" long 2-56 threaded rod with nuts.
|
We should check that their sus wire diameter are 0.0017" All 2-56 hardware are in and Bob is cleaning them. |
11915
|
Wed Jan 6 10:58:03 2016 |
Steve | Update | General | projector light bulb is out |
Projector light bulb ordered
Quote: |
[ Manasa, Ericq and Steve ]
Vivitek D952HD with 186 hours installed.
|
|
12596
|
Thu Nov 3 12:40:10 2016 |
gautam | Update | General | projector light bulb is out |
The projector failed just now with a pretty loud 'pop' sound - I've never been present when the lamp goes out, so I don't know if this is usual. I have left the power cable unplugged for now...
Replacement is ordered Nov 4 |
12626
|
Fri Nov 18 15:10:06 2016 |
Steve | Update | General | projector shipped out for repair |
Vivitek D952HD sn2160130 was send out for warranty repair. It's hard to believe that it has a 5 year warranty...... RMA - WR16004483.....expected to be back by Friday, Dec 2
Quote: |
The projector failed just now with a pretty loud 'pop' sound - I've never been present when the lamp goes out, so I don't know if this is usual. I have left the power cable unplugged for now...
Replacement is ordered Nov 4
|
|
9980
|
Wed May 21 09:35:33 2014 |
Steve | Update | SUS | razor beam dumps ETMX_ISCT |
Quote: |
Anodized aluminum dumps replaced by 6 razor beam dumps.
Two more razor beam dumps added this afternoon. The picture will updated tomorrow.
|
There are 9 razor beam dumps at ETMY-ISCT |
7434
|
Mon Sep 24 17:47:05 2012 |
Steve | Update | VAC | ready to pump |
The IFO will be at atmosphere overnight. The annuloses are pumped down. The access connector jam nuts are tightened to 45 ft/lbs
Actual pumpdown will start tomorrow morning. |
14199
|
Tue Sep 18 14:02:37 2018 |
Steve | Update | safety | safety training |
Yuki Miyazaki received 40m specific basic safety training.
|
4350
|
Thu Feb 24 16:47:26 2011 |
steve | Configuration | PSL | shutter is back on the PSL output |
Uniblitz mechanical shutter was placed into the beam path of the PSL output with razor beam trap. The output power was 1.39W at 2.08A
It is working from the MEDM screen "old map" C1IOO_Mech_Shutter.adl |
14299
|
Fri Nov 16 10:26:12 2018 |
Steve | Update | VAC | single viton O-rings |
The 40m vacuum envelope has one large single O-ring on the OOC west side. All other doors have double O-ring with annuloses.
There are 3 spacers to protect o-ring. They should not be removed!
The Cryo-pump static seal to VC1 also viton. All gate valves and right angle valve plates have single viton o-ring seal.
Small single viton o-rings on all optical quality viewports.
Helium will permiate through these fast. Leak checking time is limited to 5-10 minutes.
All other seals are copper gaskits. We have 2 manual right angle with METAL-dynamic seal [ VATRING ] as VV1 & RV1
|
2701
|
Tue Mar 23 10:11:13 2010 |
steve | Update | PEM | small air cond unit failed yesterday |
Old control room air condition failed yesterday around noon. It was blowing 80-85F hot air for about 2-3 hours at racks 1Y4-7 and the entry room 103 |
9257
|
Tue Oct 22 10:12:33 2013 |
Steve | Update | PEM | south arm AC intake duct checked |
The 4th week of no wet mopping of the floor and no wet wiping the vacuum envelope.
We cleaned the intakes of the south arm IFO air condition. The bottom duct have quite a bit accumulation Atm1
See wet wiped contrast on Atm2
We found 3 holes around pipes ( coming from CES ) on the east wall that has to be sealed.
After closer examination of these holes, they are sealed off well. |
8356
|
Tue Mar 26 16:36:24 2013 |
Steve | Update | 40m Upgrading | table leveling mounts go here |
Quote: |
Steve's suggestion for how to level the end table using "swivel leveling mounts":

|
1, level table with 4 swivels, lock nuts 3/16 -vertical alignment 2, lock this position with 4 x 1/4-20 (these are in place already) to hold table in horizontal direction
Adjustable mount is here to compensate for bad tilting floor <http://www.mcmaster.com/#6111K52>
See grouting plans of the past http://nodus.ligo.caltech.edu:8080/40m/7248 |
8372
|
Fri Mar 29 16:30:27 2013 |
Steve | Update | 40m Upgrading | table leveling mounts go here |
Quote: |
Quote: |
Steve's suggestion for how to level the end table using "swivel leveling mounts":

|
1, level table with 4 swivels, lock nuts 3/16 -vertical alignment 2, lock this position with 4 x 1/4-20 (these are in place already) to hold table in horizontal direction
Adjustable mount is here to compensate for bad tilting floor <http://www.mcmaster.com/#6111K52>
See grouting plans of the past http://nodus.ligo.caltech.edu:8080/40m/7248
|
|
9582
|
Tue Jan 28 16:26:40 2014 |
Steve | Update | VAC | vacuum computers are back without safety |
Quote: |
[Steve Koji]
We pushed the reset button of c1vac1 and c1vac2 and the vacuum screen is back.
First, we pushed the reset button of c1vac1 and pushed the one on c1vac2.
This did not bring c1vac2 up. We pushed the reset of c1vac2 again and now everything of the vacuum screen is back.
|
1, Reset works
2, Default values are lost. They actually reversed into open and turn on everything when power recycle c1vac1, c1vac2 or 24V dc power supply. This can vent the IFO in an event of power failure!
It's may be the time to go back to an isolated, vacuum controller only computer.
The present valve configuration at Atm1
a, all annuloses are vented
b, valve cables disconnected at: VC1 and 4 IP gate valves
c, the RGA is off and it is pumped by the Maglev through VM2
d, cryo pump is being roughed with TP3 It's outgassing rate was 25 mTorr / min
e, Roughing hose is disconnected |
9599
|
Wed Feb 5 08:14:59 2014 |
Steve | Update | VAC | vacuum computers are back without safety |
Quote: |
1, Reset works
2, Default values are lost. They actually reversed into open and turn on everything when power recycle c1vac1, c1vac2 or 24V dc power supply. This can vent the IFO in an event of power failure!
It's may be the time to go back to an isolated, vacuum controller only computer.
The present valve configuration at Atm1
a, all annuloses are vented
b, valve cables disconnected at: VC1 and 4 IP gate valves
c, the RGA is off and it is pumped by the Maglev through VM2
d, cryo pump is being roughed with TP3 It's outgassing rate was 25 mTorr / min
e, Roughing hose is disconnected
|
Vacuum checks before pump down:
1, check intermittent contact issue in black relay box
2, reconnect cable to ion pumps and vent them to atm before pump down
3, repeat power shutdown-reboot at atmosphere |
12209
|
Tue Jun 21 14:12:10 2016 |
Steve | Update | PEM | vacuum envelope wiped |
I wiped down the cranes with wet towel and Mario our janitor did the chamber tops with the tubes.
The optical tabels were not touched.
The outside temp peaked at 44 C yesterday
|
9514
|
Thu Jan 2 10:50:24 2014 |
Steve | Update | VAC | vacuum monitor is still blank |
The date is correct on this monitor.
Last stored RGA scan data Dec 20, 2013
IFO pressure at CC1 5.8e-6 Torr
Valve configuration: Vacuum Normal, confirmable only by manual checking of position indicators and pressure gauge controllers readouts
|
9515
|
Thu Jan 2 13:35:06 2014 |
Koji | Update | VAC | vacuum monitor is still blank |
We probably need to restart the machine, but I didn't want to touch c1vac1 and c1vac2. |
9581
|
Tue Jan 28 11:13:50 2014 |
Koji | Update | VAC | vacuum monitor is still blank |
[Steve Koji]
We pushed the reset button of c1vac1 and c1vac2 and the vacuum screen is back.
First, we pushed the reset button of c1vac1 and pushed the one on c1vac2.
This did not bring c1vac2 up. We pushed the reset of c1vac2 again and now everything of the vacuum screen is back. |
11695
|
Fri Oct 16 18:27:52 2015 |
Steve | Update | VAC | vacuum normal condition |
Vacuum normal configuration with VM1-closed, VM2-open valve positions. Power load normal 24V 0.2A
Maglev rotation 560 Hz at room temp body temp.
"NO COMM" error message on medm screen. Gauge controller pressures are read able.
All vac comp LEDs are green. We have to reboot on Monday to enable communication.
|
14028
|
Thu Jun 28 08:09:51 2018 |
Steve | Update | CDS | vacuum pneumatic N2 pressure |
The fardest I can go back on channel C1: Vac_N2pres is 320 days
C1:Vac-CC1_Hornet Presuure gauge started logging Feb. 23, 2018
Did you update the " low N2 message" email addresses?
Quote: |
I moved the N2 check script and the disk usage checking script from the (sudo) crontab of nodus to the controls user crontab on megatron .
|
|
14029
|
Thu Jun 28 10:28:27 2018 |
rana | Update | CDS | vacuum pneumatic N2 pressure |
we disabled logging the N2 Pressure to a text file, since it was filling up disk space. Now it just sends an email to our 40m mailing list, so we'll all get a warning.
The crontab uses the 'bash' version of output redirection '2>&1', which redirects stdout and stderr, but probably we just want stderr, since stdout contains messages without issues and will just fill up again. |
1459
|
Wed Apr 8 09:36:20 2009 |
steve | Configuration | VAC | valve condition changed to BG to calibrate the RGA |
Vacuum normal valve condition was changed to accommodate SRS-RGA calibration.
The annulus valves were closed to free TP3 to pump on the RGA
VM1 was closed to isolate the RGA from the IFO.
VM3 opened to TP3.
This condition is called back ground (BG) mode. It is where we can calibrate and see the RGA background without the IFO. |
9443
|
Thu Dec 5 11:06:43 2013 |
Steve | Update | Cameras | viewport video ccd cameras are all covered |
Quote: |
Quote: |
Can't we somehow hook up this camera to the MUX with the movie mode?
I think both the MUX and the sensoray are compatible with the color video signal.
Only the old CRT is B/W.
|
Watek 902H ccd with Tamron M118FM50 lens is hooked up to MUX Please be careful! In this set up the lens is close to the view port glass window!
|
PRM-BS & Faraday video ccd cameras covered as shown. These thin wall metalized ducts are perfect for blocking light in both direction.
They are very light and give you easy access to adjustment. |
10076
|
Thu Jun 19 17:28:19 2014 |
Steve | Update | PSL | window device is ready for test |
The window is at the north west corner of the PSL enclosure.
The 1 mm thick BK7 window is AR coated both side R <0.08%, W2-PW1-1004-1064-0
The PZT stack is 0.75" OD, 0.25" thick with ~ 6 mm ID, motion range 2.5 micron at 200V
Soft silicon rubber isolation.
RXA: This is the opto-mechanical phase shifter that Steve has built for diagnosing scattered light problems. We put it into the reflected light path of any of the cavities and see if it can move the scattering noise from DC up to a higher frequency. e.g.:
The paper on this from GEO |
12346
|
Thu Jul 28 08:42:36 2016 |
Steve | Update | SUS | wire clamp |
The clamp is in the machine for milling off the grooves. It's condition is normal. The edges needs some 800 sand paper so it is not sharp anywhere.
How did those nicks get on the edge? Fortunatelly they did not aligned with the wire.
|
12144
|
Wed Jun 1 15:01:56 2016 |
Steve | Update | SUS | wire standoffs update |
There are some issues with 5 mm sapphire prism Atm5. It will cause interference between one of the prisms and the Side OSEM.
Here are some drawings to see the issues with larger wire standoff.
The 2 mm prism will work.with a 1 mm longer dumbell.
Quotes requested from http://photomachining.com/laser-micromachining-photomachining-contact.html and http://www.optocity.com/
|
12146
|
Thu Jun 2 16:35:44 2016 |
Koji | Update | SUS | wire standoffs update |
Gap of the prism from the mirror
Sag: s = R(1-Cos[ArcSin[d/2/R]])
- Mirror curvature sag for 2mm prism (R=37.75mm): s=13um
- Minimum gap: 20um => s=33um => R=15mm
- Nominal gap: 35um => s=48um => R=10mm
- Maximum gap: 50um => s=63um => R=8mm
The second figure shows somewhat realistic arrangement of the pieces |
12454
|
Tue Aug 30 15:44:28 2016 |
Steve | Update | SUS | wire standoffs update |
100 Sapphire prisms ordered. Delivery date 9-30-2016
~60 deg. prisms,
Size A=B=C=2 mm, length 5 mm
Material: sapphire
Surface quality: 5 micron RMS
Tolerances: +- 0.1 mm
This prism will be used as a mechanical component
No crystal orientation required
|