ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
1991
|
Fri Sep 18 14:25:00 2009 |
rob | Omnistructure | PSL | water under the laser chiller | rob, koji, steve
We noticed some water (about a cup)
on the floor under the NESLAB chiller today. |
|
1992
|
Fri Sep 18 16:05:08 2009 |
Jenne | Omnistructure | PSL | water under the laser chiller |
|
|
2015
|
Mon Sep 28 23:44:18 2009 |
Koji | Omnistructure | SAFETY | Crappy power outlet | Jenne, Koji
Tonight we found that the wireless
for Martian network was down. |
|
2059
|
Tue Oct 6 20:09:50 2009 |
Jenne | Omnistructure | Environment | RF area is clean! | I spent part of the afternoon cleaning
up the area next to the Mode Cleaner where
we keep all of our RF stuff: Attenuators, |
|
2060
|
Tue Oct 6 23:39:54 2009 |
Koji | Omnistructure | Environment | RF area is clean! | Awesome.
I propose that anyone who tries to
do this kind of thoroughgoing cleaning should |
|
2191
|
Fri Nov 6 09:17:53 2009 |
steve | Omnistructure | PEM | PSL HEPAs turned on | The PSL enclosure HEPAs turned on at 30% |
|
2210
|
Mon Nov 9 12:09:10 2009 |
Alberto | Omnistructure | Environment | BNC Cable Laid Down from South End to East VErtex | I laid down the floor a BNC cable from
the Y End table to the BNC Chamber. The cable
runs next to the east wall. |
|
2213
|
Mon Nov 9 13:26:19 2009 |
Alberto | Omnistructure | Environment | Tidying up BNC cables rack around the lab | We have thousands of miles of BNC cables
in the lab but we still don't find one when
we need it. I decided to solve the problem. |
|
2214
|
Mon Nov 9 14:53:47 2009 |
Alberto | Omnistructure | Environment | Tidying up BNC cables rack around the lab | This would be a good trial once you put
the label "BNC only" on
the wall. |
|
2216
|
Mon Nov 9 15:08:29 2009 |
Koji | Omnistructure | Environment | Tidying up BNC cables rack around the lab |
|
|
2308
|
Fri Nov 20 13:54:45 2009 |
Alberto | Omnistructure | Environment | New Paper and Cardboard Recycling Bins Introduced to the 40m | The 40m produces a large amount of paper
and cardboard waste. It would be worth it
if we disposed those kind of garbages for |
 |
2408
|
Mon Dec 14 00:37:28 2009 |
Koji | Omnistructure | Environment | Ants in the coffee maker | I made a short stop at the 40m on Sunday
night and found that hundreds ants are in |
|
2409
|
Mon Dec 14 11:21:23 2009 |
steve | Omnistructure | Environment | Ants in the coffee maker |
We still had some ants visiting
the sink area this morning. These ants seem |
|
2428
|
Thu Dec 17 17:13:50 2009 |
Alberto | Omnistructure | Environment | STACIS stuff | One of the electronics benches is currently
occupied by the STACIS equipment.
We
need that table If no one is working on the |
|
2443
|
Tue Dec 22 10:04:41 2009 |
steve | Omnistructure | PEM | miracle in the 40m | We have been waiting for this for 20 some
years. Arrowhead water with cooler. AWESOME
THANKS Alan |
|
2445
|
Tue Dec 22 13:14:37 2009 |
Alan | Omnistructure | PEM | miracle in the 40m |
|
|
2476
|
Tue Jan 5 09:18:38 2010 |
Alberto | Omnistructure | Electronics | Universal PDH Box Stored in the RF Cabinet | FYI: I stored the Universal PDH boxes in
the RF cabiner in the Y arm. |
|
2477
|
Tue Jan 5 10:26:32 2010 |
Alberto, Steve | Omnistructure | Environment | Added new wall cable-racks | we hung two new WALL cable racks.
One is on the pillar next to the Sp table,
the other is next to the PSL computer rack. |
 |
2478
|
Tue Jan 5 11:00:04 2010 |
rana | Omnistructure | Environment | Added new wall cable-racks |
|
|
2479
|
Tue Jan 5 13:23:45 2010 |
Alberto | Omnistructure | Environment | turning page | In the lab there are lots of old posters
with outdated autocad drawings, or printouts
with schematics of old electronics hanging |
|
2485
|
Fri Jan 8 10:03:04 2010 |
Alberto | Omnistructure | LSC | SPOB shutter was closed | This morning I found that there was no
light on the SPOB PD. I went looking at the
photodetector and I found that the shutter |
|
2496
|
Sun Jan 10 16:05:51 2010 |
Alberto | Omnistructure | Environment | Lab Thermostats Temperature Lowered by 1 deg F | Rana noticed that recently the temperature
inside the lab has been a little bit too
high. That might be causing some 'unease' |
|
2501
|
Mon Jan 11 10:01:06 2010 |
Alberto | Omnistructure | Environment | Lab Thermostats Temperature Lowered by 1 deg F |
|
|
2520
|
Mon Jan 18 09:44:36 2010 |
Alberto, Bob | Omnistructure | Environment | No rain water infiltrations so far | It has rained continuously for the last
24 hours. Bob walked through the lab looking
for possible water infiltrations. The floor |
|
2768
|
Mon Apr 5 10:33:12 2010 |
Alberto | Omnistructure | Electronics | soldering iron broken | This morning the pencil soldering iron
of our Weller WD2000M Soldering Station suddenly
stopped working and got cold after I turned |
|
2770
|
Mon Apr 5 13:07:36 2010 |
Jenne | Omnistructure | Electronics | soldering iron broken |
|
|
2771
|
Mon Apr 5 13:20:16 2010 |
Koji | Omnistructure | Electronics | soldering iron broken | Albeto and Koji
We took the tip replacement from
the blue tower. |
|
2786
|
Sun Apr 11 13:51:04 2010 |
Alberto | Omnistructure | Computers | Where are the laptops? | I can't find the DELL laptop anywhere in
the lab. Does anyone know where it is?
Also one of the two netbooks is missing. |
|
2787
|
Sun Apr 11 19:05:34 2010 |
Koji | Omnistructure | Computers | Where are the laptops? | One dell is in the clean room for the suspension
work.
|
|
2831
|
Thu Apr 22 09:03:54 2010 |
steve | Omnistructure | PEM | aircondition can not be turned off | Koji and I wanted to turn off the IFO-room
AC so the wind would not blow on MC1-3. We
could not. The switches were probably bypassed |
|
2842
|
Mon Apr 26 11:13:28 2010 |
steve | Omnistructure | PEM | AC on/off is working |
|
|
2887
|
Thu May 6 17:47:01 2010 |
Alberto, kiwamu, Jc The 3rd (aka The Drigg) | Omnistructure | TMI | Minutes from the Lab Organization Commitee meeting | Today we met and we finally come up with
a lot of cool, clever, brilliant, outstanding
ideas to organize the lab. |
|
2888
|
Thu May 6 17:54:44 2010 |
Zach Korth -- Committee Oversight (Fun Division) | Omnistructure | TMI | Minutes from the Lab Organization Commitee meeting | Where are we going to put the tiki bar?
The ice cream machine? I am disappointed
in the details that appear to have been glossed |
|
2969
|
Fri May 21 16:27:45 2010 |
Alberto | Omnistructure | Environment | The control room is molding... | ... not just because we haven't locked
the interferometer for quite some time. I
mean, it literally stinks. The chiller's |
|
3053
|
Mon Jun 7 07:39:38 2010 |
Alberto | Omnistructure | Electronics | Capacitor Bridge Test |
|
|
3121
|
Fri Jun 25 15:22:45 2010 |
Jenne | Omnistructure | SAFETY | No entry to the 40m LVEA until further notice! |
|
|
3251
|
Tue Jul 20 15:06:48 2010 |
josephb, bob | Omnistructure | General | New speakers in ceiling in control room | After the crane training, Bob attached
speakers to the ceiling right next to the
projector, for use with presentations. |
|
3419
|
Fri Aug 13 09:41:00 2010 |
nancy | Omnistructure | Computers | Charger for dell laptop | I have taken the charger for the
dark gray dell laptop from its station, and
have labelled the information there too. |
|
3476
|
Fri Aug 27 11:24:13 2010 |
Jenne | Omnistructure | Computers | op540m dead | I think op540m
has finally bitten the dust. |
|
3571
|
Tue Sep 14 00:21:51 2010 |
rana | Omnistructure | Environment | Office area temperature change | I changed the setpoint for the HVAC control
(next to Steve) from 73F to 72F. This is
to handle the temperature increase in the |
|
3671
|
Thu Oct 7 16:21:02 2010 |
Koji | Omnistructure | CDS | Big 3 | Both Rolf and Alex (at least his elbow)
together visited the 40m to talk with Joe
for the CDS. |
|
3683
|
Sun Oct 10 16:44:59 2010 |
Koji | Omnistructure | Photos | Kepco Tube HV supply | |
 |
3684
|
Sun Oct 10 16:59:20 2010 |
Koji | Omnistructure | COC | PRM phase map measurement at Downs SB 014 | [Kiwamu, Yuta, Koji]
We went to the new metrology lab
at Downs subbasement (Rm014) in order to |
 |
3740
|
Tue Oct 19 00:24:07 2010 |
Dmass | Omnistructure | Electronics | Massive restocking of the 40m | I had a number of delinquent items on the
sign out list from the 40m. I returned about
half, and ordered replacements for most of |
|
3745
|
Wed Oct 20 16:41:41 2010 |
steve | Omnistructure | General | laser chiller leaving for MIT | |
|
4235
|
Tue Feb 1 15:09:41 2011 |
Koji | Omnistructure | General | Projector - fixed | The projector in the controls room has
been fixed the orange blinking of the status
LED. |
|
4283
|
Mon Feb 14 01:40:14 2011 |
Koji | Omnistructure | CDS | Name of the green related channels | I propose to use C1:ALS-xxx_xxx for the
names of the green related channels, instead
of GCV, GCX, GCY, GFD... |
|
4297
|
Tue Feb 15 06:59:57 2011 |
Suresh, Jenne | Omnistructure | General | X end enclosure left open | [Jenne, Suresh]
Jenne found the X-end table
enclosure had been left open. She replaced |
|
4430
|
Wed Mar 23 09:54:46 2011 |
steve | Omnistructure | Photos | LSC visitors | The 40m lab was visited by ~ 30 LSC
members the end of last week. |
 |
4873
|
Thu Jun 23 23:54:29 2011 |
Koji | Omnistructure | Environment | We are saved | Sonali, Ishwita, and another anonymous
SURF saved the long-lasted water shortage
of the 40m |
|