ID Date Author Typeup Category Subject
  3121   Fri Jun 25 15:22:45 2010 JenneOmnistructureSAFETYNo entry to the 40m LVEA until further notice!

                                                                                                                                                                                                                                                                               

The 40m corner station crane is out of order, and it's stuck in a way that prohibits entry to the 40m LVEA / IFO room for safety.  The crane has been locked out / tagged out. 

Until further notice, absolutely no one may enter the 40m LVEA.  Work is permitted in the desk / control room areas.

Signs have been posted on all doors into the LVEA.  Please consider those doors locked out / tagged out.

                                                                                                                                                                                                                                                                               

  3251   Tue Jul 20 15:06:48 2010 josephb, bobOmnistructureGeneralNew speakers in ceiling in control room

After the crane training, Bob attached speakers to the ceiling right next to the projector, for use with presentations.

  3419   Fri Aug 13 09:41:00 2010 nancyOmnistructureComputersCharger for dell laptop

 I have taken the charger for the dark gray dell laptop from its station, and have labelled the information there too.

Will keep it back tonight.

  3476   Fri Aug 27 11:24:13 2010 JenneOmnistructureComputersop540m dead

I think op540m has finally bitten the dust.  I noticed that both of its screens were black, so I assumed that it had crashed due to known graphics card issues or something.  But upon closer inspection, it is way more dead than that.  I checked that it does have power (at least the power cable is securely plugged in at both ends, and the power strip its on is successfully powering several other computers), but I can't make any lights or anything come on by pressing the power button on the front of the computer tower.

Immediate consequences of op540 not being operational are the lack of DMT, and the lack of Alarms. 

Joe is doing an autopsy right now to see if its really dead, or only 'mostly dead'.

EDIT: Joe says maybe it's the power supply for the computer.  But he can't turn it on either.

  3571   Tue Sep 14 00:21:51 2010 ranaOmnistructureEnvironmentOffice area temperature change

I changed the setpoint for the HVAC control (next to Steve) from 73F to 72F. This is to handle the temperature increase in the control room with the AC unit there turned off.

We know that the control setpoint is not linear, but I hope that it settles down after several hours. Lets wait until Tuesday evening before making another change.

  3671   Thu Oct 7 16:21:02 2010 KojiOmnistructureCDSBig 3

Both Rolf and Alex (at least his elbow) together visited the 40m to talk with Joe for the CDS.

40m is the true front line of the CDS development!!!

Attachment 1: IMG_3642.jpg
IMG_3642.jpg
  3683   Sun Oct 10 16:44:59 2010 KojiOmnistructurePhotosKepco Tube HV supply
Attachment 1: IMG_3637.jpg
IMG_3637.jpg
Attachment 2: IMG_3640.jpg
IMG_3640.jpg
  3684   Sun Oct 10 16:59:20 2010 KojiOmnistructureCOCPRM phase map measurement at Downs SB 014

[Kiwamu, Yuta, Koji]

We went to the new metrology lab at Downs subbasement (Rm014) in order to measure the phase map of the delivered PRMs.

It's brand-new. So we had to measure the reference phase map, calibration as well as the phase map of our mirrors (3 PRMs and 1 spare SRM). It took a whole day...

Attachment 1: IMG_3646.jpg
IMG_3646.jpg
Attachment 2: IMG_3647.jpg
IMG_3647.jpg
  3740   Tue Oct 19 00:24:07 2010 DmassOmnistructureElectronicsMassive restocking of the 40m

I had a number of delinquent items on the sign out list from the 40m. I returned about half, and ordered replacements for most of the other half.

I put the photodiodes on the SP table, and the 560 on the electronics  bench.

  3745   Wed Oct 20 16:41:41 2010 steveOmnistructureGeneral laser chiller leaving for MIT
Attachment 1: P1060929.JPG
P1060929.JPG
  4235   Tue Feb 1 15:09:41 2011 KojiOmnistructureGeneralProjector - fixed

The projector in the controls room has been fixed the orange blinking of the status LED.

What we needed was to push "Volume -" and "Menu" for 5 sec.
This resets the timer of the lamp. When the timer reaches 2500 hours, it automatically start sabotaging.

We've got the spare lamp. It is in the top drawer of the computer cabinet on which the label makers are.

  4283   Mon Feb 14 01:40:14 2011 KojiOmnistructureCDSName of the green related channels

I propose to use C1:ALS-xxx_xxx for the names of the green related channels, instead of GCV, GCX, GCY, GFD...

Like C1:SUS or C1:LSC, we name the channels by the subsystems first, then probably we can specify the place.

We can keep the names of the processes as they are now.

  4297   Tue Feb 15 06:59:57 2011 Suresh, JenneOmnistructureGeneralX end enclosure left open

[Jenne, Suresh]

 Jenne found the X-end table enclosure had been left open.  She replaced the lid on it.

 

  4430   Wed Mar 23 09:54:46 2011 steveOmnistructurePhotosLSC visitors

The 40m lab was visited by  ~ 30 LSC members  the end of last week.

Attachment 1: P1070467.JPG
P1070467.JPG
Attachment 2: P1000414.jpg
P1000414.jpg
  4873   Thu Jun 23 23:54:29 2011 KojiOmnistructureEnvironmentWe are saved

Sonali, Ishwita, and another anonymous SURF saved the long-lasted water shortage of the 40m

Attachment 1: IMG_0023.jpg
IMG_0023.jpg
  4985   Mon Jul 18 21:06:32 2011 PSL Table GuardianOmnistructurePSLDon't leave the PSL table open, unattended!!!!!!!!!!!!11111

I found the PSL table left open, and unattended again. 

As far as I know, Jamie and Jenne (working on the LSC rack, so no lasers / optics work involved) have been the only ones in the IFO room for several hours now. 

I'm going to start taking laser keys, or finding other suitable punishments.  Like a day of lab cleanup chores or something.  Seriously, don't leave the PSL table open if you're not actively working on it.

  5090   Tue Aug 2 10:53:03 2011 JenneOmnistructureSAFETYRegular door out of service. Use Control Room Door only!!

The hazardous waste people are moving chemicals around outside our door, and have roped off our regular front door. 

Please go around, and use the control room door to enter and exit.  It is currently unlocked, although I'll lock up when I leave for LIGOX.

  5254   Wed Aug 17 12:14:27 2011 Josh SmithOmnistructureComputer Scripts / Programs40m summary page plans

Josh Smith, Fabian Magana-Sandoval, Jackie Lee (Fullerton)

Thanks to Jamie and Jenne for the tour and the input on the pages.

We had a look at the GEO summary pages and thought about how best to make a 40m summary page that would eventually become and aligo summary page. Here's a rough plan:

- First we'll check that we can access the 40m NDS2 server to get data from the 40m lab in Fullerton.

- We'll make a first draft of a 40m summary page in python, using pynds, and base the layout on the current geo summary pages.

- When this takes shape we'll iterate with Jamie, Jenne, Rana to get more ideas for measurements, layout.

Other suggestions: Jenne is working on an automated noisebudget and suggests having a placeholder for it on the page. We can also incorporate some of the features of Aidan's 40m overview medm screen that's in progress, possibly with different plots corresponding to different parts of the drawing, etc. Jenne also will email us the link of once per hour medm screenshots.

 

  5265   Thu Aug 18 22:24:08 2011 jamieOmnistructureVIDEOUpdated 'videoswitch' script

I have updated the 'videoswitch' program that controls the video MUX.  It now includes the ability to query the video mux for the channel mapping:

controls@pianosa:~ 0$ /opt/rtcds/caltech/c1/scripts/general/videoswitch -h
Usage:
videoswitch [options] [OUT]      List current output/input mapping [for OUT]
videoswitch [options] OUT IN     Set output OUT to be input IN

Options:
  -h, --help            show this help message and exit
  -i, --inputs          List input channels and exit
  -o, --outputs         List output channels and exit
  -l, --list            List all input and output channels and exit
  -H HOST, --host=HOST  IP address/Host name
controls@pianosa:~ 0$

  6081   Wed Dec 7 09:56:14 2011 rana imitation of steveOmnistructureEnvironmentTelephone Map

 This is the fone storree 

we should turn off 3977,3979 and 2351 has no function

 

Edit, JD:  x8925 is at the Visitor desk, and isn't on the map.

  6463   Wed Mar 28 21:15:53 2012 ranaOmnistructureComputersWireless router for GC

I installed a NETGEAR Wireless Router (WPN824N) today on the 131 network. The admin password for it as well as the wireless access password are in the usual places.

The SSID is 40EARTH. I have set it to allow WPA as well as WPA2 access, so the speed is only 54 Mbps for now. In a year or so, we can turn off the WPA support and up the speed.

  6465   Thu Mar 29 13:23:05 2012 JenneOmnistructureComputersWireless router for GC

Quote:

I installed a NETGEAR Wireless Router (WPN824N) today on the 131 network. The admin password for it as well as the wireless access password are in the usual places.

The SSID is 40EARTH. I have set it to allow WPA as well as WPA2 access, so the speed is only 54 Mbps for now. In a year or so, we can turn off the WPA support and up the speed.

 This router was confiscated by the GC guys this morning around ~10am.  They barged in and said that someone at the 40m had connected a new router, and we had magically taken down half of the GC network.  The cable was plugged in to the wrong port on the back of the router. 

Junaid / Christian said that they would "secure" the router, and then reinstall it.  Apparently just having a password didn't satisfy them.  This was the compromise, versus them just taking the router and never bringing it back.

 

Attachment 1: IMG_0079.JPG
IMG_0079.JPG
  6467   Thu Mar 29 19:13:56 2012 JamieOmnistructureComputersWireless router for GC

I retrieved the newly "secured" router from Junaid.  It had apparently been hooked up to the GC network via it's LAN port, but it's LAN services had no been shut off.  It was therefore offering a competing DHCP server, which will totally hose a network.  A definite NONO.

The new SSID is "40mWiFi", it's WPA2, and the password is pasted to the bottom of the unit (the unit is back in it's original spot on the office computer rack.

  6535   Sat Apr 14 00:19:35 2012 SureshOmnistructureLSCOptical Fibers for insitu RFPD characterisation

   I have worked out the fibers we need to get for the following distribution scheme:

1) We have a laser placed at the 1Y1 rack.  A part of the power is split off for monitoring the laser output and sent to a broadband PD also placed in the same rack.  The RF excitation applied to the laser is split and sent to LSC rack (1Y2) and used to calibrate the full PD+Demod board system for each RFPD.

2) A single fiber goes from the laser to a 11+ way switch located in the OMC electronics cabinet next to the AP table.  From here the fibers branch out to three different tables.

Table / Rack   RF PDs on the table Number of PDs Fiber Length from OMC
The AP table AS11,AS55,AS165,REFL11,REFL33,REFL55,REFL165 7 6 m
The ITMY table POY11 1 12 m
The ITMX table POX11, POP22/110 and POP55 3 20 m

 

Cable for the laser source to the OMC table:

The 1Y1 Rack to OMC rack AM Laser Source to Switch 25 m

We also require a cable going from PSL table to the ETMY table:   This is not a part of the RFPD characterisation.  It is a part of the PSL to Y-end Aux laser lock  which is a part of the green locking scheme.  But it is  fiber we need and might as well order it now along with the rest.

PSL Table to ETMY Table PSL to ETMY Aux laser 75m

 

If you would like to add anything to this layout / scheme, please comment.  On Monday Eric is going to take a look at this and place orders for the fibers.

(I have included the lengths required for routing the fibers and added another 20% to that ) 

 

  6733   Thu May 31 17:47:25 2012 SureshOmnistructureGeneral40m Wireless Network

Mike Pedraza came by today to install a new wireless network router configured for the 40m lab network.  It has a 'secret' SSID i.e. not meant for public use outside the lab.  You can look up the password and network name on the rack.  Pictures below show the location of the labels.

40m_Wifi.png

  6741   Fri Jun 1 10:00:03 2012 steveOmnistructureGeneral40m Wireless Network

Quote:

Mike Pedraza came by today to install a new wireless network router configured for the 40m lab network.  It has a 'secret' SSID i.e. not meant for public use outside the lab.  You can look up the password and network name on the rack.  Pictures below show the location of the labels.

40m_Wifi.png

 Mike P swapped in a new network router Linksys E1000

  6758   Tue Jun 5 22:03:22 2012 JenneOmnistructureGreen LockingIR beat signal at PSL

Yuta is going to bring this up at the 40m meeting so it can be argued over, but we (I) want a permanent IR beat setup at the PSL table.  This isn't a novel idea or anything, I just think it will save us time if we can quickly re-acquire the beat signal, so I'm bringing it up again.  Eventually, as Koji suggested to me, we can make the IR beat part of a servo, so that the green beat is always within the bandwidth of the green beat PD.  But for Phase 1, it's enough to just see the Ir beat on a ~1GHz PD.  Suresh tells me most of the bits and pieces are around, we just have to gather them all in one place.

  6857   Fri Jun 22 20:00:14 2012 JamieOmnistructureElectronicstwo RG-405 cables ran from 1X2 rack to control room

[Yaakov, Eric, Jenne, Yuta]

Two of our surfs, Yaakov and Eric, pulled two unused RG-405/SMA cables that had been running from 1X2 to (mysteriously) 1Y2 racks.  They left the 1X2 end where it was and pulled the 1Y2 end and rerouted it to the control room.  We labeled both ends appropriately.

The end at 1X2 is now plugged into a splitter that is combining the RF input monitor outputs for the X and Y beatbox channels, so that we can watch the beat signals with the HP8591 in the control room.

  7013   Mon Jul 23 20:34:38 2012 JamieOmnistructureComputersCHECK IN YOUR CHANGES TO THE SVN

I'm seeing LOTS OF STUFF NOT CHECKED INTO THE SVN!!!  both modified things that haven't been updated, and things that looked like they haven't been checked in at all.

Please check in your stuff to the SVN!  We need the record!

Look through EVERYTHING that you think you might have touched, or even care about, and make sure it's checked in.

  7342   Tue Sep 4 20:25:22 2012 jamieOmnistructureVACbetter in-air "lite" access connector needed

We really need something better to replace the access connector when we're at air.  This tin foil tunnel crap is dumb.  We can't do any locking in the evening after we've put on the light doors.  We need something that we can put in place of the access connector that allows us access to the OMC and IOO tables, while still allowing IMC locking, and can be left in place at night.

  7343   Wed Sep 5 09:50:25 2012 SteveOmnistructureVACbetter in-air "lite" access connector needed

Quote:

We really need something better to replace the access connector when we're at air.  This tin foil tunnel crap is dumb.  We can't do any locking in the evening after we've put on the light doors.  We need something that we can put in place of the access connector that allows us access to the OMC and IOO tables, while still allowing IMC locking, and can be left in place at night.

 It is in the shop. It will be ready for the next vent. Koji's dream comes through.

Attachment 1: IMG_1612.JPG
IMG_1612.JPG
  7344   Wed Sep 5 10:50:15 2012 jamieOmnistructureVACbetter in-air "lite" access connector needed

Quote:

Quote:

We really need something better to replace the access connector when we're at air.  This tin foil tunnel crap is dumb.  We can't do any locking in the evening after we've put on the light doors.  We need something that we can put in place of the access connector that allows us access to the OMC and IOO tables, while still allowing IMC locking, and can be left in place at night.

 It is in the shop. It will be ready for the next vent. Koji's dream comes through.

 Can we see the full design?  If we can't lock the mode cleaner with this thing on then it's really of no use.  We want it to be equivalent to the light doors, but allow us to keep the mode cleaner locked.  That's the most important aspect.

  7345   Wed Sep 5 13:11:43 2012 jamieOmnistructureVACbetter in-air "lite" access connector needed

Quote:

Quote:

Quote:

We really need something better to replace the access connector when we're at air.  This tin foil tunnel crap is dumb.  We can't do any locking in the evening after we've put on the light doors.  We need something that we can put in place of the access connector that allows us access to the OMC and IOO tables, while still allowing IMC locking, and can be left in place at night.

 It is in the shop. It will be ready for the next vent. Koji's dream comes through.

 Can we see the full design?  If we can't lock the mode cleaner with this thing on then it's really of no use.  We want it to be equivalent to the light doors, but allow us to keep the mode cleaner locked.  That's the most important aspect.

 It also needs to be wide enough that the MMT beam can go through, so that we can not only lock the MC, but also work on the rest of the IFO.

  7407   Wed Sep 19 09:24:01 2012 SteveOmnistructureIOOaccess connector at athmoshere

Quote:

Quote:

We really need something better to replace the access connector when we're at air.  This tin foil tunnel crap is dumb.  We can't do any locking in the evening after we've put on the light doors.  We need something that we can put in place of the access connector that allows us access to the OMC and IOO tables, while still allowing IMC locking, and can be left in place at night.

 It is in the shop. It will be ready for the next vent. Koji's dream comes through.

 24" diameter clear acetate access connector is in place. The 0.01" thick plastic is wrapped around twice to insure air and bug tight barrier for the MC to lock overnight. The acetate transmission for 1064 nm is 90 % This was measured at 150 mW   2.5 mm beam size.

 

Attachment 1: IMG_1641.JPG
IMG_1641.JPG
Attachment 2: IMG_1642.JPG
IMG_1642.JPG
Attachment 3: acetateAC.png
acetateAC.png
  7431   Mon Sep 24 10:27:50 2012 SteveOmnistructureGeneraldo not leave stuff on optical table tops

The SP table was found open this morning. Please, do not make optics dirty!

I cleaned up the tops of the SP table.

Stop storing your junk, boxes, laptops, etc. on the optical tables. This includes the big SP table. Please move all of that junk into racks or shelves, etc.

  7518   Wed Oct 10 10:55:56 2012 SteveOmnistructureIOOaccess connector at athmoshere

Quote:

Quote:

Quote:

We really need something better to replace the access connector when we're at air.  This tin foil tunnel crap is dumb.  We can't do any locking in the evening after we've put on the light doors.  We need something that we can put in place of the access connector that allows us access to the OMC and IOO tables, while still allowing IMC locking, and can be left in place at night.

 It is in the shop. It will be ready for the next vent. Koji's dream comes through.

 24" diameter clear acetate access connector is in place. The 0.01" thick plastic is wrapped around twice to insure air and bug tight barrier for the MC to lock overnight. The acetate transmission for 1064 nm is 90 % This was measured at 150 mW   2.5 mm beam size.

 

 Aluminum sheet as shown will replace the acetate. Side entries for your arms and "window" on the top will be covered with acetate using double- sided removable-no residue tape 3M 9425

Attachment 1: 10101202.PDF
10101202.PDF
  7620   Thu Oct 25 09:32:17 2012 SteveOmnistructureIOOusing access connector

Quote:

Quote:

Quote:

Quote:

We really need something better to replace the access connector when we're at air.  This tin foil tunnel crap is dumb.  We can't do any locking in the evening after we've put on the light doors.  We need something that we can put in place of the access connector that allows us access to the OMC and IOO tables, while still allowing IMC locking, and can be left in place at night.

 It is in the shop. It will be ready for the next vent. Koji's dream comes through.

 24" diameter clear acetate access connector is in place. The 0.01" thick plastic is wrapped around twice to insure air and bug tight barrier for the MC to lock overnight. The acetate transmission for 1064 nm is 90 % This was measured at 150 mW   2.5 mm beam size.

 

 Aluminum sheet as shown will replace the acetate. Side entries for your arms and "window" on the top will be covered with acetate using double- sided removable-no residue tape 3M 9425

 The second loop of the bungee cord should be on the top of the acrylic  and still on the supporting aluminum tube as shown.

Attachment 1: acclosing.jpg
acclosing.jpg
  7749   Tue Nov 27 00:26:00 2012 jamieOmnistructureComputersUbuntu update seems to have broken html input to elog on firefox

 After some system updates this evening, firefox can no longer handle the html input encoding for the elog.  I'm not sure what happened.  You can still use the "ELCode" or "plain" input encodings, but "HTML" won't work.  The problem seems to be firefox 17.  ottavia and rosalba were upgraded, while rossa and pianosa have not yet been.

I've installed chromium-browser (debranded chrome) on all the machines as a backup.  Hopefully the problem will clear itself up with the next update.  In the mean time I'll try to figure out what happened.

To use chromium: Appliations -> Internet -> Chromium

  7757   Wed Nov 28 17:40:28 2012 jamieOmnistructureComputerselog working again on firefox 17

Koji and I figured out what the problem is.  Apparently firefox 17.0 (specifically it's user-agent string) breaks fckeditor, which is the javascript toolbox the elog uses for the wysiwyg text editor.  See https://support.mozilla.org/en-US/questions/942438.

The suspect line was in elog/fckeditor/editor/js/fckeditorcode_gecko.js.  I hacked it up so that it stopped whatever crappy conditional user agent crap it was doing.  It seems to be working now.

Edit by Koji: In order to make this change work, I needed to clear the cache of firefox from Tool/Clear Recent History menu.

  7786   Tue Dec 4 20:38:51 2012 jamieOmnistructureComputersnew (beta) version of nds2 installed on control room machines

I've installed the new nds2 packages on the control room machines.

These new packages include some new and improved interfaces for python, matlab, and octave that were not previously available. See the documentation in:

  /usr/share/doc/nds2-client-doc/html/index.html

for details on how to use them.  They all work something like:

  conn = nds2.connection('fb', 8088)
  chans = conn.findChannels()
  buffers = conn.fetch(t1, t2, {c1,...})
  data = buffers(1).getData()

NOTE: the new interface for python is distinct from the one provided by pynds.  The old pynds interface should continue to work, though.

To use the new matlab interface, you have to first issue the following command:

   javaaddpath('/usr/lib/java')

I'll try to figure out a way to have that included automatically.

The old Matlab mex functions (NDS*_GetData, NDS*_GetChannel, etc.) are now provided by a new and improved package.  Those should now work "out of the box".

  7788   Tue Dec 4 23:08:46 2012 DenOmnistructureComputersnew (beta) version of nds2 installed on control room machines

Quote:

I've installed the new nds2 packages on the control room machines.

 I've tried new nds2 Java interface in Matlab. Using findChannels method of the connection class I see only slow, DQ and trend channels. I could even download data online using iterate method. When it will be possible to do the same with fast non-DQ channels?

>> conn = nds2.connection('fb', 8088);
>> conn.iterate({'C1:LSC-XARM_OUT'})
??? Java exception occurred:
java.lang.RuntimeException: No such channel.
    at nds2.nds2JNI.connection_iterate__SWIG_0(Native Method)
    at nds2.connection.iterate(connection.java:91)

  7791   Wed Dec 5 09:42:46 2012 ranaOmnistructureComputersnew (beta) version of NDS2 installed on control room machines

NDS2 is not designed for non DQ channels - it gets data from the frames, not through NDS1.

For getting the non-DQ stuff, I would just continue using our NDS1 compatible NDS mex files (this is what is used in mDV).

  7793   Wed Dec 5 16:54:29 2012 jamieOmnistructureComputersnew (beta) version of NDS2 installed on control room machines

Quote:

NDS2 is not designed for non DQ channels - it gets data from the frames, not through NDS1.

For getting the non-DQ stuff, I would just continue using our NDS1 compatible NDS mex files (this is what is used in mDV).

The NDS2 protocol is not for non-DQ, but the NDS2 client is capable of talking both the NDS1 and NDS2 protocols.

fb:8088 is an NDS1 server, so the client is talking NDS1 to fb.  It should therefore be capable of getting online data.

It doesn't seem to be seeing the online channels, though, so I'll work with Leo to figure out what's going on there.

The old mex functions, which like I said are now available, aren't capable of getting online data.

  7805   Mon Dec 10 16:28:13 2012 jamieOmnistructureComputersprogressive retrieval of online data now possible with the new NDS2 client

Leo fixed an issue with the new nds2-client packages that was preventing it from retrieving online data.  It's working now from matlab, python, and octave.

Here's an example of a dataviewer-like script in python:

#!/usr/bin/python

import sys
import nds2
from pylab import *

# channels are command line arguments
channels = sys.argv[1:]

conn = nds2.connection('fb', 8088)

fig = figure()
fig.show()
for bufs in conn.iterate(channels):
    fig.clf()
    for buf in bufs:
        plot(buf.data)
    draw()

  7921   Sat Jan 19 16:02:28 2013 ranaOmnistructureElectronicsPS cleanup

During our 'Women in Physics' tours today, we were reminded that there are several bench power supplies being used as permanent inside.

Some are being used to power PZTs, AOMs, VCOs, RFPDs, etc. On Wednesday, after the meeting, we will all go inside and remove one and replace it with a fused, professional wiring to the rack power supplies. The temporary ones must be removed.

  8180   Wed Feb 27 02:52:40 2013 JenneOmnistructureSAFETYBack door unlocked

Did someone unlock the back door by the (unofficial) bike storage lately?  Out of habit, I checked the door behind me while about to leave, and it is unlocked. 

Please recall that if you leave through that door, it should automatically lock behind you (if it was locked already), however if you unlock and enter through the back door, it stays unlocked until someone locks it again.

(Obviously, I'm locking the door before I actually go).

  9335   Mon Nov 4 12:07:55 2013 DmassOmnistructureGeneralReplaced Broken Drill Bits

I broke a small bit while using the 40m drill press to vent some 1/4-20 screws for the cryo experiment.

I replaced it and refilled the small bit row in the bit index I was using; there were ~10 missing sizes

  9385   Thu Nov 14 14:27:51 2013 nicolasOmnistructureGeneralSR785 Analyzer CRT replaced

 The 785 analyzer in the 40 had a wonky hard to read screen. I was hoping that a new white CRT would fix all the problems. 

I installed a white CRT, which didn't fix the wonkyness, but I adjusted the CRT position, brightness, focus settings to make the screen somewhat more readable.

BEFORE:

IMG_20131114_125728.jpg

AFTER:

IMG_20131114_141425.jpg

If we want to send the thing in for service to fix the wonkyness, we should probably hold on to the old CRT because they will probably replace the whole screen assembly and we'll lose our white screen.

  10040   Sun Jun 15 14:26:30 2014 JamieOmnistructureCDScdsutils re-installed

Quote:

 CDSUTILS is also gone from the path on all the workstations, so we need Jamie to tell us by ELOG how to set it up, or else we have to use ezcaread / ezcawrite forever.

It's in the elog already: http://nodus.ligo.caltech.edu:8080/40m/9922

But it seems like things still haven't fully recovered, or have recovered to an old state?  Why is the cdsutils install I previously did in /ligo/apps now missing?  It seems like other directories are missing as well.

There's also a user:group issue with the /home/cds mounts.  Everything in those mount points is owned nobody:nogroup.

I also can't log into pianosa and rosalba.

  10041   Sun Jun 15 14:41:08 2014 JamieOmnistructureCDScdsutils re-installed

Quote:

Quote:

 CDSUTILS is also gone from the path on all the workstations, so we need Jamie to tell us by ELOG how to set it up, or else we have to use ezcaread / ezcawrite forever.

It's in the elog already: http://nodus.ligo.caltech.edu:8080/40m/9922

But it seems like things still haven't fully recovered, or have recovered to an old state?  Why is the cdsutils install I previously did in /ligo/apps now missing?  It seems like other directories are missing as well.

There's also a user:group issue with the /home/cds mounts.  Everything in those mount points is owned nobody:nogroup.

I also can't log into pianosa and rosalba.

 I also still think it's a bad idea for everything to be mounting /home/cds from an IP address.  Just make a new DNS entry for linux1 and leave everything as it was.