40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 36 of 169  Not logged in ELOG logo
Entry  Wed Nov 4 16:12:07 2015, ericq, Update, CDS, OPTIMUS optimus.png
Entry  Thu Sep 17 08:36:14 2015, Steve, Update, PEM, earth quake Chilian_eq_8.3M.pngBS_UR_0.220V.pngLowSensingV_BS-UR.png
    Reply  Wed Nov 4 15:48:58 2015, Steve, Update, PEM, ETMX wirestadoff vs EQ 8.3mChili.png
Entry  Fri Oct 2 15:33:09 2015, Steve, Update, safety, safety training 
    Reply  Wed Nov 4 08:04:53 2015, Steve, Update, safety, safety training Yutaro.jpg
Entry  Fri Oct 30 17:49:27 2015, Steve, Update, SUS, ETMX kicked up ETMXkicking.pngETMXkickedbyOpPerror.pngETMXstillKicking.pngETMXkickingCond.png7hrsETMX-Y.png
    Reply  Tue Nov 3 18:49:41 2015, gautam, Update, SUS, ETMX kicked up 
Entry  Tue Oct 27 03:56:52 2015, ericq, Update, LSC, DRFPMI work 
    Reply  Thu Oct 29 03:25:49 2015, ericq, Update, LSC, DRFPMI work DRFPMI.pdfDRMIarms.pdf
       Reply  Tue Nov 3 03:12:46 2015, ericq, Update, LSC, DRFPMI work 
Entry  Mon Nov 2 17:39:01 2015, Koji, Frogs, General, DRFPMI celebration yatta.jpg
Entry  Fri Oct 30 16:56:04 2015, gautam, Update, CDS, is there a problem with the SCHMITTTRIGGER CDS library part? 3000Hz.pdf4628Hz.pdf3000Hz_software_SCHMITT.pdf4628Hz_software_SCHMITT.pdf
Entry  Wed Oct 28 17:06:30 2015, ericq, Update, ASC, New PRC Angular FF filters installed 
Entry  Wed Oct 28 14:07:44 2015, Koji, Update, IOO, MC WFS Offsets update 
Entry  Tue Oct 20 15:51:44 2015, ericq, Update, SUS, MC2 F2P tuned 
    Reply  Fri Oct 23 21:58:10 2015, rana, Update, SUS, MC2 F2P mis-tuned 
       Reply  Tue Oct 27 03:46:26 2015, ericq, Update, SUS, MC2 F2P mis-tuned 
Entry  Mon Oct 19 16:20:52 2015, ericq, Update, LSC, Green beatnote couplers installed 
    Reply  Mon Oct 26 18:59:25 2015, gautam, Update, LSC, Green beatnote couplers installed 
Entry  Wed Sep 9 11:00:49 2015, Ignacio, Update, IOO, Last Wiener MCL subtractions 11x
    Reply  Sun Sep 13 13:26:00 2015, rana, Update, IOO, Last Wiener MCL subtractions 
    Reply  Mon Oct 26 18:10:38 2015, Ignacio, Update, IOO, Last Wiener MCL subtractions code_TF.zip
Entry  Fri Oct 23 09:55:50 2015, Steve, Update, LSC, stable days stable4days.png
Entry  Thu Oct 15 03:08:57 2015, ericq, Update, LSC, DRFPMI Locked for 20 sec DRFPMI_locked.pdf
    Reply  Thu Oct 15 04:14:14 2015, ericq, Update, LSC, DRFPMI Locked for 20 sec 
    Reply  Thu Oct 15 10:59:12 2015, Koji, Update, LSC, DRFPMI Locked for 20 sec 
    Reply  Sat Oct 17 18:55:07 2015, rana, Update, LSC, DRFPMI Locked for 20 sec 
       Reply  Mon Oct 19 15:23:22 2015, ericq, Update, LSC, Longer DRFPMI lock second_DRFPMI_15Oct2015.png
          Reply  Tue Oct 20 11:24:29 2015, ericq, HowTo, LSC, How to DRFPMI 
Entry  Mon Oct 19 16:16:01 2015, ericq, Update, CDS, C1ALS crashes 
Entry  Wed Oct 14 16:53:22 2015, Koji, Update, General, Non inverting buffer for SR560 IMG_20151014_145608547.jpgIMG_20151014_145548751.jpg
Entry  Tue Oct 13 17:04:54 2015, ericq, Update, CDS, CDS things 
Entry  Fri Sep 18 13:33:17 2015, ericq, Update, LSC, Fast ALS troubles - Noise at 36kHz IRlock_noises.pdf
    Reply  Fri Sep 18 16:08:41 2015, ericq, Update, LSC, Fast ALS troubles - Noise at 36kHz PRMIlock_REFLspectra.pdfIMCspectrum.pdf
       Reply  Fri Sep 18 19:15:35 2015, rana, Update, LSC, Fast ALS troubles - Noise at 36kHz 
    Reply  Tue Sep 29 16:52:49 2015, ericq, Update, LSC, Fast ALS troubles - unknown zero OLG_fastALS.pdf
       Reply  Tue Sep 29 18:03:11 2015, rana, Update, LSC, use LISO Screen_Shot_2015-09-29_at_5.55.34_PM.png
          Reply  Wed Sep 30 10:00:02 2015, ericq, Update, LSC, used LISO 
       Reply  Fri Oct 2 03:29:16 2015, ericq, Update, LSC, Fast ALS progress - AO path crossed over, but no high BW crossedover.pdf
          Reply  Fri Oct 9 13:31:21 2015, ericq, Update, LSC, ALS plant shape xarm_plantTFs.pdf
             Reply  Fri Oct 9 14:50:18 2015, Koji, Update, LSC, ALS plant shape 
                Reply  Fri Oct 9 16:23:25 2015, ericq, Update, LSC, ALS plant shape 
                   Reply  Tue Oct 13 16:28:21 2015, ericq, Update, LSC, Fast ALS pomona liso_lp.zip2LPfit.pdf
Entry  Tue Oct 13 05:48:39 2015, ericq, Update, LSC, :/ 
Entry  Fri Oct 9 16:43:50 2015, ericq, Update, IOO, Weird IMC behavior IMC_oddity.png
Entry  Tue Oct 6 03:30:17 2015, ericq, Update, LSC, DRFPMI Progress 
    Reply  Thu Oct 8 04:48:50 2015, ericq, Update, LSC, DRFPMI Progress 
       Reply  Thu Oct 8 13:13:20 2015, Koji, Update, LSC, DRFPMI Progress 
          Reply  Thu Oct 8 14:14:50 2015, ericq, Update, LSC, DRFPMI Progress 
             Reply  Thu Oct 8 16:48:23 2015, Koji, Update, LSC, DRFPMI Progress 
             Reply  Thu Oct 8 21:35:49 2015, rana, Update, LSC, DRFPMI Progress 
                Reply  Fri Oct 9 09:22:38 2015, ericq, Update, LSC, DRFPMI Progress oct8_allRF.pdf
                   Reply  Fri Oct 9 11:24:06 2015, Jenne, Update, LSC, DRFPMI Progress 
Entry  Tue Sep 29 19:38:09 2015, gautam, Update, General, FOL fiber box revamp IMG_0017.JPGFOL_schematic.pdfIMG_0018.JPGIMG_0016.JPG
    Reply  Wed Sep 30 13:07:13 2015, gautam, Update, General, FOL fiber box revamp FOL_schematic.pdf
       Reply  Tue Oct 6 16:56:40 2015, gautam, Update, General, FOL fiber box revamp 20151006_Xbeat_psd.pdf20151006_Xbeat_coherence.pdf
Entry  Mon Oct 5 11:25:21 2015, ericq, Update, SUS, ETMY OL laser dead ETMY-OLSUM.png
    Reply  Mon Oct 5 16:41:22 2015, Steve, Update, SUS, ETMY OL laser replaced 
Entry  Mon Oct 6 10:04:58 2014, manasa, Update, General, Unexpected power shutdown 
    Reply  Mon Oct 6 10:23:43 2014, Steve, Update, VAC, Unexpected power shutdown 
       Reply  Tue Oct 7 16:55:16 2014, Steve, Update, VAC, Unexpected sweaty valves sweatyV5.jpgsweatyV5f.jpg
          Reply  Wed Oct 8 08:46:57 2014, Steve, Update, VAC, VAT valves actuator lubricant 
             Reply  Mon Oct 13 14:44:52 2014, Steve, Update, VAC, RGA scan pd78 -day 13 RGAscan13Oct2014.png
                Reply  Mon Dec 1 17:13:57 2014, Steve, Update, VAC, RGA scan pd78 -day 63 RGAscanD63.png
                   Reply  Tue Mar 31 09:03:32 2015, Steve, Update, VAC, RGA scan pd78 day 182 RGApd78d182.png
                      Reply  Wed Jul 1 10:01:25 2015, Steve, Update, VAC, RGA scan pd78 day 275 rga275d.png
                         Reply  Mon Oct 5 10:11:35 2015, Steve, Update, VAC, RGA scan pd78 day 386 RGA_background.png
       Reply  Tue Dec 23 14:33:24 2014, Steve, Update, VAC, Chiara gets UPS prepUP.png
    Reply  Mon Oct 6 10:28:18 2014, manasa, Update, General, Unexpected power shutdown 
       Reply  Mon Oct 6 11:09:52 2014, Jenne, Update, General, Unexpected power shutdown: slow computers 
       Reply  Mon Oct 6 17:04:51 2014, ericq, Update, General, Unexpected power shutdown 
          Reply  Mon Oct 6 17:36:17 2014, ericq, Update, General, Unexpected power shutdown 
          Reply  Mon Oct 6 18:15:12 2014, manasa, Update, General, Unexpected power shutdown: end green alignment 
    Reply  Tue Oct 7 16:17:15 2014, Steve, Update, General, reason for 8 sec power outage 
Entry  Sun Oct 4 12:07:11 2015, jamie, Configuration, CDS, CSD network tests in progress 
    Reply  Sun Oct 4 14:23:42 2015, jamie, Configuration, CDS, CSD network test complete 
       Reply  Sun Oct 4 14:32:49 2015, jamie, Configuration, CDS, CSD network test complete 45.png
Entry  Tue Sep 22 17:30:55 2015, jamie, Update, DAQ, attempts at getting new fb working 
    Reply  Wed Sep 30 13:59:49 2015, jamie, Update, DAQ, attempts at getting new fb working 
       Reply  Thu Oct 1 20:26:21 2015, jamie, Update, DAQ, Swapping between fb and fb1 
    Reply  Thu Oct 1 19:49:52 2015, jamie, Update, DAQ, more failed attempts at getting new fb working 
       Reply  Thu Oct 1 20:24:02 2015, jamie, Update, DAQ, more failed attempts at getting new fb working 
       Reply  Sun Oct 4 14:28:03 2015, jamie, Update, DAQ, more failed attempts at getting new fb working 
Entry  Sun Oct 4 13:53:30 2015, jamie, Update, LSC, SENSMAT oscillator used for EPICS tests 
Entry  Fri Oct 2 15:11:08 2015, Steve, Update, PEM, cable squashed 
Entry  Wed Sep 30 15:44:06 2015, Steve, Update, General, Sun Fire X4600 
Entry  Wed Jan 7 14:35:44 2015, diego, Update, SUS, SUS Drift Monitor 150107_SUS_DRIFTMON_screen.png
    Reply  Thu Jan 8 23:02:30 2015, diego, Update, SUS, SUS Drift Monitor 150108_SUS_DRIFTMON_screen.png
       Reply  Tue Jan 20 19:32:06 2015, Jenne, Update, SUS, SUS Drift restore scripts 
          Reply  Fri Jan 23 10:07:15 2015, Steve, Update, SUS, SUS Drift ETMX vs ETMY SUSdrift30d.png
             Reply  Mon Mar 2 18:34:12 2015, Jenne, Update, SUS, ETMX moving during single arm lock ETMX_moving.pngETMXmoving_ALSlock.pngStartsMoving_stopsItself_ranASS.png80mHz.pngIndependFromFSStemp.png
                Reply  Tue Mar 3 09:42:40 2015, Steve, Update, SUS, ETMX is drifting ETMXdrifting.pngETMXvsTemp.png
             Reply  Fri Sep 25 14:52:08 2015, Steve, Update, SUS, ETMX is not drifting ETMXstoppedDrifting.png25daysArmsT.png
                Reply  Fri Sep 25 19:06:13 2015, rana, Update, SUS, ETMX IS drifting 
Entry  Fri Sep 25 17:51:11 2015, jamie, Update, DAQ, fb replacement work update 
Entry  Tue Jul 23 22:55:13 2013, Jenne, Update, VAC, BS, ITMY doors to be opened in the morning 
    Reply  Wed Jul 24 10:35:41 2013, Steve, Update, VAC, BS, ITMY doors are removed beforeDoorsOff.pngparticlecount10d.png
       Reply  Mon Jul 29 16:04:40 2013, Steve, Update, VAC, AC removed acout.pngAlAcACa.jpgAlAcACb.jpg
          Reply  Mon Jul 29 16:15:13 2013, Koji, Update, VAC, AC removed 
          Reply  Mon Aug 5 10:50:48 2013, Steve, Update, VAC, RGA background v75bgMd12.png
             Reply  Tue Aug 6 10:06:29 2013, Steve, Update, VAC, Pumpdown is at 500Torr befPd.png
                Reply  Tue Aug 6 16:45:31 2013, Steve, Update, VAC, Pumpdown is completed 8hrPd76.png1mT.png
                   Reply  Wed Aug 7 10:51:49 2013, Steve, Update, VAC, Pumpdown at 26hrs 26hr.png14datm.png
                      Reply  Wed Aug 7 15:36:29 2013, Steve, Update, VAC, TP2 drypump replaced forelinesPs.jpg
                         Reply  Thu Aug 8 07:57:23 2013, Steve, Update, VAC, pumpdown at 48 hrs 48hrsPd76.png
                            Reply  Thu Aug 8 10:31:28 2013, Steve, Update, VAC, few reminders of this vent GROUND!.jpgbad_Folding.jpgtoomuchred.jpgBETTERholder.jpg
                               Reply  Wed Aug 28 11:23:41 2013, Steve, Update, VAC, crane repair sheduled 
                               Reply  Thu Sep 5 10:47:58 2013, Steve, Update, VAC, vertex crane folding issue 5mmLess.jpg
                                  Reply  Mon Sep 9 15:33:06 2013, Steve, Update, VAC, vertex crane repair is scheduled 
                                  Reply  Wed Sep 18 14:57:12 2013, Steve, Update, VAC, vertex crane folding arm removed manPower.jpgrotatingHinge.jpgsupportingHinge.jpggullingPin.jpg
                                     Reply  Fri Sep 20 16:37:30 2013, Steve, Update, VAC, vertex crane folding arm is back on bushingBottom.jpgfoldingI.jpgnoLoadGap.jpgtrollyway.jpgtrollySee.jpg
                                        Reply  Mon Sep 30 08:53:22 2013, Steve, Update, VAC, vertex crane repair schedule has changed 
                                        Reply  Wed Oct 2 14:25:39 2013, Steve, Update, VAC, vertex crane is still out of order grindingIbeam.jpgcableMoved.jpg500lbs@end.jpg
                                           Reply  Thu Nov 7 11:19:04 2013, Steve, Update, VAC, crane work POSTPONED to Monday 
                                           Reply  Wed Nov 13 08:46:03 2013, Steve, Update, VAC, vertex crane repair completed 
                            Reply  Wed Aug 14 08:24:20 2013, Steve, Update, VAC, pumpdown at day 8 pd76md8.png
                               Reply  Mon Aug 19 11:12:54 2013, Steve, Update, VAC, RGA scan at day 13 rgaScan13d.png
                                  Reply  Wed Aug 28 15:41:42 2013, Steve, Update, VAC, RGA scan at day 23 pd75md23.png
                                     Reply  Fri Sep 6 09:27:10 2013, Steve, Update, VAC, 31 days after pumpdown day31vac.png
                                        Reply  Tue Sep 10 09:18:22 2013, Steve, Update, VAC, dry pump is getting loud 
                                           Reply  Tue Sep 10 15:43:01 2013, Steve, Update, VAC, TP3' dry pump is replaced 
                                     Reply  Mon Sep 16 10:57:11 2013, Steve, Update, VAC, RGA scan at day 41 pd76m41dRGA.pngpd76m41d.png
                                        Reply  Wed Oct 9 11:48:10 2013, Steve, Update, VAC, RGA scan at day 65 scanRGApd76m65d.pngpd76m65d.png
                                           Reply  Fri Nov 22 16:32:08 2013, Steve, Update, VAC, RGA scan at day 108 RGAscanVacNormal108d.pngday108.pngpd76m110d.png
                         Reply  Tue Apr 29 16:42:29 2014, Steve, Update, VAC, TP2 drypump replaced dryforepumpreplaced.png
                            Reply  Tue Dec 23 15:37:32 2014, Steve, Update, VAC, TP3 drypump replaced 
                               Reply  Mon Sep 14 10:41:03 2015, Steve, Update, VAC, TP2 dry pump replaced TP2_dry_pump_replaced.png
                                  Reply  Mon Sep 21 11:12:14 2015, Steve, Update, VAC, cold cathode is flaky cc4jumps.png
                                     Reply  Tue Sep 22 08:58:38 2015, Steve, Update, VAC, cold cathode is flaky 4and80days.png
                                        Reply  Fri Sep 25 17:00:38 2015, Steve, Update, VAC, cold cathode is flaky flakyCC4.png
Entry  Thu Sep 24 17:06:14 2015, ericq, Update, Calibration-Repair, C1CAL Lockins 
Entry  Thu Sep 24 17:01:37 2015, ericq, Update, Computer Scripts / Programs, Freeing up some space on /cvs/cds 
Entry  Wed Sep 23 03:08:50 2015, ericq, Update, LSC, DRMI + ALS Arms DRMIarms.pdf
    Reply  Wed Sep 23 10:31:49 2015, ericq, Update, LSC, DRMI + ALS Arms 
    Reply  Wed Sep 23 12:51:03 2015, Jenne, Update, LSC, DRMI + ALS Arms 
Entry  Tue Sep 22 16:52:36 2015, ericq, Summary, General, Random Notes 
Entry  Tue Sep 22 16:42:39 2015, ericq, Update, IOO, Housekeeping 
Entry  Tue Sep 22 03:48:18 2015, ericq, Update, LSC, DRMI tweaked, briefly held with ALS arms 
Entry  Thu Sep 17 19:58:06 2015, gautam, Summary, Computer Scripts / Programs, Frequency counting algorithm 
    Reply  Mon Sep 21 18:31:06 2015, gautam, Summary, Computer Scripts / Programs, Frequency counting algorithm 6x
       Reply  Mon Sep 21 23:18:55 2015, ericq, Summary, Computer Scripts / Programs, Frequency counting algorithm 
          Reply  Tue Sep 22 02:11:17 2015, rana, Summary, Computer Scripts / Programs, Frequency counting algorithm 
Entry  Mon Sep 21 15:22:19 2015, jamie, Update, DAQ, working on new fb replacement 
Entry  Fri Sep 18 09:06:26 2015, rana, Frogs, Computer Scripts / Programs, remote data access: volume 1, Inferno 
    Reply  Fri Sep 18 19:19:49 2015, rana, Frogs, Computer Scripts / Programs, remote data access: volume 1, Inferno 
Entry  Thu Aug 27 02:09:14 2015, ericq, Update, LSC, AUX X Laser Current Changed 
    Reply  Fri Sep 18 11:59:08 2015, ericq, Update, LSC, AUX X Laser Current Reverted 
Entry  Wed Sep 16 03:44:18 2015, Koji, Update, LSC, RF micky mouse IMG_20150915_231038191.jpgIMG_20150915_234257144.jpg
    Reply  Thu Sep 17 17:27:01 2015, gautam, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed DIN_rail_terminal.jpg
       Reply  Thu Sep 17 19:42:43 2015, Koji, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed IMG_20150917_190635033.jpgIMG_20150917_192551919.jpg
       Reply  Fri Sep 18 08:03:53 2015, rana, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed 
       Reply  Fri Sep 18 08:04:09 2015, rana, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed 
Entry  Thu May 28 16:43:52 2015, Steve, Update, PEM, Guralps swapped GursSwapped.png
    Reply  Mon Jun 1 15:22:19 2015, Steve, Update, PEM, Guralps X- short cable is bad seismGur1-2.png
       Reply  Wed Jul 29 14:32:01 2015, Steve, Update, General, How not to solder coldSoldering.jpg
          Reply  Thu Jul 30 10:38:18 2015, Steve, Update, PEM, Y sesimostation is back on Guralps_are_back_on.pngYstation.jpg
             Reply  Thu Jul 30 13:34:52 2015, Koji, Update, PEM, Y sesimostation is back on 
                Reply  Thu Jul 30 15:24:54 2015, Steve, Update, PEM, Y sesimostation is back on NewShortCable-Y-B-Gur2.pnginterfaceInputSwapped.pngsameasAtm2.png
                   Reply  Fri Jul 31 10:36:22 2015, Steve, Update, PEM, X seismo station short cable removed IMG_0009.JPG
                      Reply  Sat Aug 1 20:46:29 2015, Koji, Update, PEM, X seismo station short cable removed 
                   Reply  Wed Aug 12 11:44:13 2015, ericq, Update, PEM, Gur2 Channels still wonky gur2_centered.png
                      Reply  Fri Aug 14 09:07:45 2015, Steve, Update, PEM, Gur interface box is wonky Gur1&2.pnglongCablesSwapped.png
                         Reply  Fri Aug 14 12:10:08 2015, Koji, Update, PEM, Gur interface box is wonky 
                            Reply  Tue Aug 18 11:16:17 2015, Steve, Update, PEM, Gur interface box is wonky IMG_0009.JPG
                               Reply  Wed Aug 19 07:58:25 2015, Steve, Update, PEM, Gur interface box  GurADCbox.jpg
                                  Reply  Thu Aug 20 11:31:55 2015, Koji, Update, PEM, Gur interface box  IMG_1958.JPG
                                     Reply  Fri Aug 21 17:15:13 2015, Steve, Update, PEM, Gur interface box  
                                        Reply  Fri Aug 28 17:04:12 2015, Steve, Update, PEM, Gur interface box cable fixedNewLongCable.png
                                           Reply  Fri Aug 28 20:20:26 2015, rana, Update, PEM, Gur interface box cable 
                                              Reply  Tue Sep 1 10:36:06 2015, Steve, Update, PEM, Gurs swapped GurA@ETMY.png
                                                 Reply  Thu Sep 17 16:04:09 2015, Steve, Update, PEM, Gurs  
                         Reply  Fri Aug 14 17:20:01 2015, Jenne, Update, PEM, Gur interface box is wonky 
Entry  Tue Sep 15 15:10:48 2015, gautam, ericq, rana, Summary, LSC, PRFPMI lock & various to-do's powerSpec0915.pdf
    Reply  Tue Sep 15 18:35:21 2015, ericq, Summary, LSC, some further notes 
       Reply  Tue Sep 15 20:44:13 2015, gautam, Summary, LSC, Checking the delay line phase shifter DS050339 IMG_20150915_193100.jpgCalibration.pdf
       Reply  Thu Sep 17 03:48:10 2015, ericq, Summary, LSC, some further notes 
          Reply  Thu Sep 17 13:06:05 2015, ericq, Summary, LSC, Low input impedance on CM board 
Entry  Wed Sep 16 23:07:06 2015, rana, Update, Electronics, LSC Whitening board: LP filters added, pictures taken 20150916_221210.jpgout.pdf
Entry  Tue Sep 15 01:14:10 2015, rana, Summary, LSC, need to check LSC Whitening switch logic ... again 
    Reply  Wed Sep 16 15:04:33 2015, ericq, Summary, LSC, DC PD Whitening Board Fixed 
Entry  Wed Sep 16 03:37:06 2015, Koji, Summary, Green Locking, Workable delay line setup prepared 6x
Entry  Tue Sep 15 15:01:23 2015, rana, Summary, LSC, disabling the LSC AA filters + mod to whitening 
Entry  Mon Sep 14 23:12:49 2015, ericq, Update, LSC, 55MHz modulation phase effect on PRMI PRMI_CAR_0ns.pdfPRMI_CAR_4ns.pdfdelaySweep_nominal.pdf55delay_PRMI_REFL33.pdf
ELOG V3.1.3-