ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
16084
|
Sun Apr 25 21:21:02 2021 |
rana | Update | CDS | SUS simPlant model |
I suggest not naming this the LSC
model, since it has no LSC stuff.
Also
remove all the diagnostic stuff in the plant |
|
16083
|
Fri Apr 23 19:26:58 2021 |
Koji | Update | PSL | HEPA speed lowered | I believe that there is an internal setting
for the minimum flow, so the flow is not
linear ("0%" is not zero), but |
|
16082
|
Fri Apr 23 18:00:02 2021 |
gautam | Update | PSL | HEPA speed lowered | I will upload some plots later - but in
summary, I set the HEPA speed to ~40%. I
used (i)IMC transmission RIN, (ii) Arm cavity |
|
16081
|
Fri Apr 23 15:52:19 2021 |
Ian MacMillan | Update | CDS | 40m LSC simPlant model | I have attached the framework that I am
using for the full system. Plantframework.pdf
has the important aspects that I will be |
  |
16080
|
Thu Apr 22 17:28:34 2021 |
Yehonathan | Update | PSL | Laser amplifier | According to the aLIGO
70W amplifier interlock concept the flow
rate of the chiller should be between 5 and |
  |
16079
|
Thu Apr 22 17:04:17 2021 |
gautam | Update | SUS | Settings restored | Indeed, you can make your own snapshot
by specifying the channels to snap in a .req
file. But what I meant was, we should confirm |
|
16078
|
Thu Apr 22 15:36:54 2021 |
Anchal | Update | SUS | Settings restored | The mix up was my fault I think. I restored
the channels manually instead of using burt
restore. Your message suggests that we can |
|
16077
|
Thu Apr 22 15:34:54 2021 |
Anchal | Update | PSL | PMC transmission | Koji mentioned that the mode of the laser
is different for lower diode currents. So
that might be the reason why we got less |
|
16076
|
Thu Apr 22 15:15:26 2021 |
gautam | Update | PSL | PMC transmission | I was a bit surprised by these numbers
suggesting the PMC transmission is only 50-60%.
I went to the table today and confirmed that |
|
16075
|
Thu Apr 22 14:49:08 2021 |
gautam | Update | Computer Scripts / Programs | rossa added to RTS authorized keys | This is to facilitate running of scripts
like the CDS reboot script, mx_stream restart,
etc, from rossa, without being pwd prompted |
|
16074
|
Thu Apr 22 14:41:55 2021 |
Chub | Update | PSL | New HEPA speed control | When adjusting the blower speed, give the
blower at least 30 seconds to speed up or
slow down to the set speed. The flywheel |
|
16073
|
Thu Apr 22 14:22:39 2021 |
gautam | Update | SUS | Settings restored | The MC / WFS stability seemed off to me.
Trending some channels at random, I saw that
the MC3 PIT/YAW gains were restored mixed |
|
16072
|
Thu Apr 22 12:17:23 2021 |
Anchal, Paco | Update | SUS | MC1 and MC3 Suspension Optimization Summary | |
|
16071
|
Thu Apr 22 08:50:21 2021 |
Anchal | Update | SUS | MC2 Suspension Optimization summary | Yes, during the AC balancing, POS column
was set to all 1. This table shows the final
values after all the steps. The first 3 columns |
|
16070
|
Thu Apr 22 01:42:38 2021 |
Koji | Summary | Electronics | HV Supply Comparison | New HV power supply from Company 'M'
has been delivered. So I decided to compare
the noise levels of some HV supplies in the |
   |
16069
|
Wed Apr 21 19:43:20 2021 |
Koji | Update | PSL | New HEPA speed control | The new HEPA speed controllers are attached
at the middle of the HEPA unit (not at the
edge of the unit)... (Attachment |
 |
16068
|
Wed Apr 21 19:28:03 2021 |
Anchal | Update | PSL | PSL/IFO recovery | [Anchal, Koji]
Removed the top sheet
Opened
first from the door side so that any dust |
|
16067
|
Wed Apr 21 18:49:29 2021 |
rana | Update | SUS | MC2 Suspension Optimization summary | the
POS column should be all 1 for the AC balancing. |
|
16066
|
Wed Apr 21 15:50:01 2021 |
Anchal, Paco | Update | SUS | MC2 Suspension Optimization summary |
MC2
Coil Balancing DC and AC Gains
|
|
16065
|
Wed Apr 21 13:10:12 2021 |
Koji | Update | General | PSL HEPA Maintenance | It's probably too late to say but there
are/were two boxes. (just for record)
|
|
16064
|
Wed Apr 21 12:56:00 2021 |
Jordan | Update | VAC | Empty N2 Tanks | Installed T2 today, and leaked checked
the entire line. No issues found. It could
have been a bad valve on the tank itself. |
|
16063
|
Wed Apr 21 11:38:27 2021 |
Anchal, Paco | Update | SUS | MC2 Damping Gains Optimized | We did a step response test with MC2 Suspensoin
Damping Gains and optimized them to get <5
oscillations in ringdown. |
 |
16062
|
Wed Apr 21 11:09:57 2021 |
yehonathan | Update | PSL | Laser amplifier | I went to the TCS lab to take a look at
the chillers lying around. I spotted two
chillers: |
    |
16061
|
Wed Apr 21 11:01:37 2021 |
Rana | Update | CDS | 40m LSC simPlant model | The controller would be in the c1sus model,
and connects to the c1sup plant model. So
the controller doesn't go in the plant |
|
16060
|
Wed Apr 21 10:59:07 2021 |
rana | Summary | Cameras | note on new GigE cam @ 1064 | Note
from Stephen on more sensitive Baslers. |
|
16059
|
Wed Apr 21 10:03:01 2021 |
Ian MacMillan | Update | CDS | 40m LSC simPlant model | So I am stuck on how to add the control
block to my model. I am trying to make it
as simple as possible with just a simple |
|
16058
|
Wed Apr 21 05:48:47 2021 |
Chub | Update | General | PSL HEPA Maintenance | Yikes! That's ONE filter.
I'll get another from storage. |
|
16057
|
Wed Apr 21 01:14:03 2021 |
Koji | Update | PSL | PSL Table (sort of) covered / HEPA "chimney" | I also located the (possible) HEPA filters
in the lab. (Attachments 1~3)
Oh! This is NO-NO! We can't |
  |
16056
|
Wed Apr 21 00:08:15 2021 |
Koji | Update | PSL | PSL Table (sort of) covered / HEPA "chimney" | Shutdown Procedure:
PSL Shutter closed / MC Autolocker
disabled / PSL mechanical shutter closed |
   |
16055
|
Tue Apr 20 18:19:30 2021 |
Anchal | Update | SUS | MC2 coil balanced at DC | Following up from morning's work, I
balanced the coils at DC as well. Attachment
1 is screenshot of striptool in which blue |
  |
16054
|
Tue Apr 20 10:52:49 2021 |
Anchal, Paco | Update | SUS | AC gain coil output balancing for IMC | [Paco, Anchal]
We adopted the following
procedure to balance the coil output gains |
   |
16052
|
Mon Apr 19 21:54:55 2021 |
Yehonathan | Update | CDS | Updated c1auxey wiring plan | Except for the feed-throughs that require
a DB9-M connector I finished wiring and labeling
the Acromag, following Jon's updated |
|
16051
|
Mon Apr 19 19:40:54 2021 |
Yehonathan | Update | General | Glue Freezer completely frozen | {Paco, Yehonathan}
We broke the last chunk of ice
and cleaned the fridge. We move the fridge |
|
16050
|
Mon Apr 19 13:15:20 2021 |
Ian MacMillan | Update | CDS | 40m LSC simPlant model | The x1SUSsim model on the docker was made
in a more recent version of Simulink so I
updated Matlab (see |
|
16049
|
Mon Apr 19 12:18:19 2021 |
Anchal, Paco | Update | SUS | Tested proposed filters for POS colum in MC2 output matrix | The filters were somewhat successful, how
much we can see in attachment 1. The tip
about difference between eigenmode basis |
  |
16048
|
Mon Apr 19 10:52:27 2021 |
Yehonathan | Update | General | Glue Freezer completely frozen | {Anchal, Paco, Yehonathan}
We took the glue fridge outside. |
|
16047
|
Mon Apr 19 09:17:51 2021 |
Jordan | Update | VAC | Empty N2 Tanks | When I came into the lab this morning,
I noticed that both N2 tanks were empty.
I had swapped one on Friday (4-16-21) before |
|
16046
|
Sun Apr 18 21:29:55 2021 |
rana | Update | PSL | Laser amplifier |
Ideally, we put the chiller outside
of the interferometer area. The PSL chiller
used to be in the control room near the door |
|
16045
|
Fri Apr 16 19:07:31 2021 |
Yehonathan | Update | General | Glue Freezer completely frozen | There is still a huge chunk of unmelted
ice in the fridge. I moved the content of
that fridge in the main fridge and put "do |
|
16044
|
Fri Apr 16 18:21:36 2021 |
Yehonathan | Update | PSL | Laser amplifier | I surveyed a bit the 1X1/2 area to plan
for the installation of the laser amplifier.
There is a vacancy at the bottom |
   |
16043
|
Fri Apr 16 15:47:58 2021 |
rana | Update | SUS | Tested proposed filters for POS colum in MC2 output matrix | Looks mostly right, but you
used the OSEM sensors as readbacks. |
|
16042
|
Fri Apr 16 11:36:36 2021 |
Anchal, Paco | Update | SUS | Tested proposed filters for POS colum in MC2 output matrix | We tried two sets of filters on the output
matrix POS column in MC2. Both versions failed.
Following are some details. |
    |
16041
|
Fri Apr 16 11:31:00 2021 |
rana | Update | elog | elog stuck ~10 AM today | found it unresponsive. Restarted fine using
procedure documented in wiki |
|
16040
|
Fri Apr 16 10:58:16 2021 |
Yehonathan | Update | General | Glue Freezer completely frozen | {Paco, Anchal, Yehonathan}
We emptied the fridge and moved
the amplifier equipment on top of the amplifier |
|
16039
|
Fri Apr 16 00:21:52 2021 |
Koji | Update | General | Glue Freezer completely frozen | I was looking at the laser head/amp and
somehow decided to open the glue freezer.
And it was stuck. I've managed to open |
 |
16038
|
Thu Apr 15 18:33:39 2021 |
Koji | Update | CDS | More 16bit ADC adapter boards | We received 10x 16bit ADC adapter boards
from Todd. S2100687~S2100696
The number of soldered resistors |
|
16037
|
Thu Apr 15 17:24:08 2021 |
Jon | Update | CDS | Updated c1auxey wiring plan | I've updated the c1auxey wiring
plan for compatibility with the new suspension
electronics. Specifically it is based on |
|
16036
|
Thu Apr 15 15:54:46 2021 |
gautam | Update | IOO | Waveplate commissioning - hardware installed | [jordan,
gautam] |
|
16035
|
Thu Apr 15 11:41:43 2021 |
Anchal | Update | SUS | Proposed filters for output matrix aka F2A aka F2P | Here' s aquick update before we leave
for lunch. We have managed to calculate some
filter that would go on the POS column in |
|
16034
|
Thu Apr 15 09:46:24 2021 |
Yehonathan | Update | PSL | Laser amplifier | Some more relevant documents provided by
Matt:
Phase |
|