Mon Nov 9 13:22:08 2009, josephb,alex, Update, Computers, Megatron update
|
Mon Nov 9 14:59:34 2009, josephb, alex, Update, Computers, The saga of Megatron continues
|
Mon Nov 9 13:26:19 2009, Alberto, Omnistructure, Environment, Tidying up BNC cables rack around the lab
|
Mon Nov 9 14:53:47 2009, Alberto, Omnistructure, Environment, Tidying up BNC cables rack around the lab
|
Mon Nov 9 15:08:29 2009, Koji, Omnistructure, Environment, Tidying up BNC cables rack around the lab
|
Fri Nov 6 00:40:29 2009, Alberto, Update, LSC, Everything put back as it was
|
Mon Nov 9 15:11:02 2009, Alberto, Update, LSC, Everything put back as it was
|
Thu Nov 5 16:24:40 2009, Jenne, Update, General, Drill Press is down for the count
|
Mon Nov 9 15:21:37 2009, Jenne, Update, General, Drill Press is down for the count
|
Mon Nov 9 16:32:36 2009, Alberto, Frogs, Environment, Shot of the white board yesterday before erasing 
|
Mon Nov 9 18:27:30 2009, Alberto, Frogs, Computers, OMC DCPD Interface Box Disconnected from the power Supply
|
Mon Nov 9 18:32:38 2009, rob, Update, Computers, OMC FE hosed
|
Mon Nov 9 19:04:23 2009, rob, Update, Computers, OMC FE hosed
|
Mon Nov 9 19:44:38 2009, rob, rana, Update, Computers, OMC FE hosed
|
Tue Nov 10 10:51:00 2009, josephb, alex, Update, Computers, Megatron on, powercycled c1omc, and burt restored from 3am snapshot
|
Thu Nov 5 23:09:34 2009, Alberto, Update, LSC, Y Arm Cavity Transfer Function
|
Fri Nov 6 00:24:06 2009, Alberto, Update, LSC, Y Arm Cavity Transfer Function
|
Tue Nov 10 13:02:36 2009, Alberto, Update, LSC, X and Y Arm Cavity Poles Measurement 
|
Tue Nov 10 17:01:33 2009, Alberto, Configuration, IOO, c1ioovme and c1iool0 rebooted
|
Tue Nov 10 19:19:57 2009, Alberto, Update, ABSL, Rotated polarizer on the PSL table, along the MC input pick off beam
|
Tue Nov 10 19:21:53 2009, Alberto, Update, ABSL, PLL Alignment
|
Tue Nov 10 17:49:20 2009, Alberto, Metaphysics, Computers, Test Point Number Mapping
|
Tue Nov 10 21:46:31 2009, rana, Summary, Computers, Test Point Number Mapping
|
Wed Nov 11 00:55:47 2009, Jenne, Update, Adaptive Filtering, Terms put on some ADC inputs
|
Wed Nov 11 01:33:52 2009, pete, Update, CDS, RCG ETMY code update
|
Wed Nov 11 09:48:04 2009, steve, Update, IOO, where is IOO-RFAMPD_DCMON ?
|
Wed Nov 11 12:29:44 2009, Alberto, Frogs, PSL, MC Locked on the wrong mode?
|
Wed Nov 11 18:43:57 2009, rana, koji, HowTo, Photos, Illuminated Paintbrush Technique 
|
Wed Nov 11 20:46:07 2009, pete, Update, CDS, RCG ETMY phase I update
|
Wed Nov 11 20:57:06 2009, kiwamu, Update, Electronics, Multi-resonant EOM --- LC tank circuit --- 
|
Wed Nov 11 21:30:20 2009, Haixing, Update, General, magnetic levitation modelling files uploaded to svn
|
Thu Nov 12 01:18:34 2009, haixing, Update, SUS, open-loop transfer function of mag levi system (comparison between simulink and measurement)  
|
Thu Nov 12 02:02:18 2009, rana, Summary, LSC, Arm Locking with no feedback to the ETM or ITM
|
Thu Nov 12 09:43:29 2009, steve, Update, PEM, construction has started at CES  
|
Thu Nov 12 10:45:02 2009, Alberto, Update, PSL, Abandoned Frequency Generator
|
Thu Nov 12 11:19:10 2009, Koji, Update, PSL, Abandoned Frequency Generator
|
Thu Nov 12 12:50:35 2009, Alberto, Update, Computers, StochMon calibrated channels added to the data trend
|
Thu Nov 12 10:45:36 2009, Alberto, Update, ABSL, Working on the AP table
|
Thu Nov 12 12:51:45 2009, Alberto, Update, ABSL, Working on the AP table
|
Thu Nov 12 15:40:27 2009, josephb, koji, peter, Update, Computers, ETMY and Megatron test take 1
|
Wed Nov 11 15:04:52 2009, Alberto, Update, ABSL, Working on the AP table
|
Wed Nov 11 16:18:57 2009, Alberto, Update, ABSL, Working on the AP table
|
Wed Nov 11 17:10:51 2009, Jenne, Update, ABSL, Working on the AP table
|
Wed Nov 11 17:33:54 2009, Koji, Update, ABSL, Working on the AP table
|
Thu Nov 12 11:34:38 2009, Alberto, Update, ABSL, Working on the AP table
|
Thu Nov 12 16:53:59 2009, Alberto, Update, ABSL, Working on the AP table
|
Thu Nov 12 17:24:29 2009, Koji, Joe, Peter, Configuration, CDS, ETMY CDS test started
|
Thu Nov 12 16:13:05 2009, Alberto, Update, PSL, MC Trans Offset
|
Thu Nov 12 17:15:43 2009, Koji, Update, PSL, MC Trans Offset
|
Thu Nov 12 17:42:04 2009, Koji, Update, PSL, MC Trans Offset
|
Thu Nov 12 18:10:27 2009, Alberto, Update, ABSL, PLL Locked
|
Fri Nov 13 03:38:47 2009, kiwamu, Update, Electronics, multi-resonant EOM --- impedance of LC tank circuit ---- 
|
Fri Nov 13 05:03:09 2009, kiwamu, Update, Electronics, multi-resonant EOM --- input impedance of LC tank ---- 
|
Fri Nov 13 09:47:18 2009, josephb, Update, Computers, Megatron status lights lit
|
Fri Nov 13 09:54:14 2009, josephb, Configuration, Computers, Megatron switched to tcsh
|
Fri Nov 13 10:28:03 2009, josephb, alex, Update, Computers, Megatron is back to its old self
|
Sun Nov 15 18:42:10 2009, Alberto, Update, Locking, Interferometer fully locked for 3331 seconds
|
Mon Nov 16 09:37:41 2009, steve, Update, PEM, construction is getting noisier  
|
Mon Nov 16 15:13:25 2009, josephb, Update, Computers, ezcaread updated to Yoichi style ezcawrite
|
Mon Nov 16 15:18:10 2009, haixing, Update, SUS, Stable magnetic levitation without eddy-current damping 
|
Mon Nov 16 15:58:02 2009, josephb, Configuration, General, Added Gige camera to AP table, added some screens
|
Mon Nov 16 17:24:28 2009, josephb, Configuration, Computers, Camera medm functionality improved
|
Mon Nov 16 17:35:59 2009, kiwamu, Update, LSC, OMC-LSC timing get synchronized !
|
Fri Nov 13 14:04:27 2009, josephb, koji, Update, Computers, Updated wiki with RCG instructions/tips
|
Fri Nov 13 15:01:07 2009, Jenne, Update, Computers, Updated wiki with RCG instructions/tips
|
Fri Nov 13 22:01:54 2009, Koji, Update, Computers, Updated wiki with RCG instructions/tips
|
Sat Nov 14 06:46:48 2009, Koji, Update, Computers, Updated wiki with RCG instructions/tips
|
Tue Nov 17 00:42:12 2009, Koji, Update, Computers, Updated wiki with RCG instructions/tips
|
Tue Nov 17 10:09:57 2009, josephb, Update, Environment, Fumes
|
Tue Nov 17 15:54:34 2009, rana, Summary, PEM, 40 days of weather
|
Tue Nov 17 21:09:17 2009, Jenne, rana, Update, General, Little Thorlabs Photodiode
|
Tue Nov 17 21:21:30 2009, rob, Update, SUS, ETMY UL OSEM
|
|