Entry  Wed Dec 15 16:04:49 2010, steve, Configuration, VAC, vacuum valves found in default condition 
This condition is created when we run out of nitrogen that holds the valves in set positions. The Maglev and other turbos are still running in this configuration
so one has to pay attention that the foreline valves are open.
Reset  error message on vacuum screen and opened V4 & V5 at 3pm today.
Entry  Fri May 28 13:32:01 2010, alberto, kiwamu, Update, VAC, vacuum work 
We started a vacuum work in this morning. And still it's going on.
 
Although the last night the green team replaced a steering mirror by an 80% reflector on the PLS table, the beam axis to the MC looks fine.
    Reply  Fri May 28 13:51:51 2010, Jenne, Update, VAC, vacuum work 


    
        
            Quote:
        
        
            
            We started a vacuum work in this morning.
    Reply  Fri May 28 14:24:30 2010, Jenne, Update, VAC, vacuum work 
I just got off the phone with Alberto and Kiwamu, and I'm going to try to recalculate things based on their measurements of the distances between MC3
and SM1.  It sounds like the CAD drawings we have aren't totally correct.    I know that when we opened doors just before Christmas we measured the distances between the BS table and the ITM tables, but I don't think
Entry  Thu Feb 18 15:39:16 2010, Koji and Steve, Configuration, VAC, valve condition: ALL OFF 
As preparation for the upcoming planned power outage we turned turbos, RGA off and closed valves.
IFO chamber is not pumped now. Small leaks and out gassing will push the pressure up slowly. At 3 mTorr of P1 the PSL output shutter
will be closed by the interlock.
Entry  Wed Aug 3 09:40:13 2011, steve, Update, VAC, vent pzt2011Aug3.png
The vacuum system is coming up to atm. The vent was started with slow N2 flow. The PSL output is blocked 2 places on the table.
Entry  Thu Nov 1 09:17:27 2007, steve, Routine, VAC, vent 64 vent64.jpg
Yesterday before vent I could not lock  MC, therfore I could not measure the 
transmitted power at MC2 
The vent went well. We had lots of help.
    Reply  Thu Oct 2 09:23:23 2014, Steve, Update, VAC, vent 77 vent77SRMmoved.png


    
        
            Quote:
        
        
            

            
    Reply  Fri Jul 1 09:20:44 2016, Steve, Update, VAC, vent 78 vent78.pngvent78at250T.png
  VENT OBJECTIVES:

1, Fix ETMX sus "jump issue"

2, First Contact clean the arms
    Reply  Wed Jul 20 11:39:07 2016, Steve, Update, VAC, vent 78 day 20 vent78-d20.png
RGA background scan




Quote:



Vacuum Status: Chamber
    Reply  Mon Aug 8 10:35:12 2016, Steve, Update, PEM, vent 78 day 38 Vent38days.pngvent78d40RgaBg.png
 




Quote:



RGA background scan
    Reply  Wed Jul 6 10:58:07 2016, Steve, Update, VAC, vent 78 valve configuration CamberOpen.png
Vacuum Status: Chamber Open

All chamber annuloses are vented.  Vac Monitor screen is not communicating with gauges. The valve position indicator are working.

RGA is pumped by Maglev through VM2
    Reply  Fri Jul 1 15:48:10 2016, Steve, Update, VAC, vent 78 at 710 Torr pd78at710T.png
I just disconnected the 6th instrument grade air cylinder from the vacuum envelope at 720 Torr. Now it will reach equilibrium through a filter as it
sucks in lab air.

This is the sure way not to over pressurize the chamber.
    Reply  Thu Oct 13 16:48:34 2016, Steve, Update, VAC, vent 79 is completed vent_79.png
IFO is at atmosphere. The MC can be locked in air now.

The doors will be coming off tomorrow 8am sharp.

Do we want to install the ITM baffles?
    Reply  Thu Oct 13 09:30:38 2016, Steve, Update, General, vent 79 is happening vent79precond.pngventing.png



Quote:



I have completed the
following non-Steve portions of the pre-vent checklist [wiki-40m.ligo.caltech.edu]
    Reply  Thu Sep 25 08:21:15 2014, Steve, Update, VAC, vent day 1 ventDay1.png


    
        
            Quote:
        
        
            

           [Steve, EricQ, Jenne]
Entry  Fri Sep 26 09:13:17 2014, Steve, Update, SUS, vent day 2 ventDay2.pngITMY.png
 ITMY in vac table needs leveling.
    Reply  Tue Oct 23 08:45:00 2012, Steve, Update, VAC, vent day 3 ventd4.pngIMG_1743.JPG


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Mon Sep 29 09:11:25 2014, Steve, Update, VAC, vent day 5 RGA scan v77_bg-mag-d5.png
 
 
Entry  Tue Feb 23 19:00:45 2010, kiwamu, Configuration, VAC, vent finished 
The vent has been finished.
Now the pressure inside the chamber is 760 torr, and it's getting equilibrium with the atmospheric pressure.
Therefore we are ready and can open the door of the chamber tomorrow.
    Reply  Wed Jul 21 12:41:31 2010, kiwamu, Update, VAC, vent finished 
The vent has been finished successfully in this morning.
The vent was finished successfully this morning.
    Reply  Thu Jul 22 08:07:27 2010, steve, Update, VAC, vent finished 30hvent.jpg


    
        
            Quote:
        
        
            
            The vent has been finished successfully in
    Reply  Thu Jun 28 20:59:28 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW! 
Koji, Jamie and I talked together and I decided to VENT TOMORROW MORNING.
Main purpose of this vent is to see if PRM is flipped or not.
    Reply  Thu Jun 28 22:08:57 2012, Jenne, Bureaucracy, Locking, vent for PRC check, TOMORROW! 


    
        
            Quote:
        
        
            

           Check List:
    Reply  Fri Jun 29 01:49:36 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW! 


    
        
            Quote:
        
        
            

            What do you mean by PR2, PR3 flipping?  They are (supposed to be) flat mirrors, so obviously they should be installed correctly,
    Reply  Tue Dec 18 10:43:20 2012, Steve, Update, VAC, vent has completed vent74.pngbvent.pngbefVent.png
 The 40m vacuum envelope is at atm    It took 4.5 hours at ~3 Torr/min speed. Atm1
 
What I did:
    Reply  Fri Oct 19 16:45:39 2012, Steve, Update, VAC, vent has started 


    
        
            Quote:
        
        
            

            
    Reply  Fri Oct 19 19:26:42 2012, Jenne, Update, VAC, vent has started 


    
        
            Quote:
        
        
            

           
            
                
           
Entry  Wed Aug 3 16:18:30 2011, steve, Update, VAC, vent is almost finished vent8h.jpg
P1 at 750 Torr,  Vent valve VV1 is left open to atm. It will reach equilibrium in an hour. The PSL power is not turned down yet. The beam path is
blocked at two places inside the enclosure.
The low power 20 mW  input  MC can be locked tonight.
    Reply  Tue Feb 23 19:07:43 2010, kiwamu and steve, Configuration, VAC, vent is completed vent2010feb23.jpg


    
        
            Quote:
        
        
            
            Kiwamu and Steve have started venting the 40m vacuum envelope.
Entry  Wed Sep 24 13:28:48 2014, Steve, Update, VAC, vent is completed ventiscompleted.pngatAtm.png
 The vent is completed. ITMX was kicked up accidentally. Valve configuration: chamber open, RGA is pumped through VM2  Maglev
    Reply  Wed Sep 24 16:02:58 2014, Jenne, Update, VAC, vent is completed 
[Steve, EricQ, Jenne]
ITMY and BS heavy doors are off, light doors are on.  Q is aligning the IFO.
Entry  Wed Oct 19 14:03:41 2011, kiwamu, Update, General, vent prep : dichroic mirrors 
Status update on dichroic mirror:
 I got the specification sheet of an aLIGO 2" dichroic mirror from Lisa.
https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=25232
Entry  Wed Aug 22 15:47:34 2012, jamie, Summary, General, vent prepartion for fast-track vent 
We are discussing venting first thing next week, with the goal of
diagnosing what's going on in the PRC.
    Reply  Thu Aug 23 10:38:12 2012, Steve, Update, General, vent prepartion for fast-track vent 


    
        
            Quote:
        
        
            

           We are discussing venting first thing next week, with the goal of
Entry  Tue Oct 16 16:46:20 2012, Vent Czar and Czarina, Summary, General, vent stuff 
We're discussing the plan for the next vent.  Now that we have all the tip-tilt stuff in hand, we should get ready for the big TT installation vent
ASAP.  The question is what remains to be done, and when can we be ready
Stuff that needs doing:
    Reply  Tue Oct 16 17:13:23 2012, Czarina, Summary, General, vent stuff - 4 paths 
I see 4+ possible paths for us to take, in terms of a possible vent in the next few weeks:
No Vent - Just do FPPRMI, using AS55
Mini Vent - Fix REFL path, nothing else.  ~1 day at atmosphere
Entry  Tue Nov 6 09:45:22 2007, steve, Summary, SUS, vent sus trend  ventsustrend.jpg
The mc optics dragwippings were done by locking optics by eq stops and rotating-moving
cages so access were good. This technic worked well with mc1 & mc2
MC3 osems were reoriented only.
Entry  Tue Feb 23 13:37:04 2010, kiwamu and steve, Configuration, VAC, venting the 40m vac envelope 
Kiwamu and Steve have started venting the 40m vacuum envelope.
Preparation:
centered oplevs at resonating cavities,
Entry  Tue Sep 28 14:12:14 2010, steve, Update, General, vertex crane drive is out of order 
The vertex crane drive is overheating, it stopped functioning. Service man will be here tomorrow morning.
I crane was just turned  on for for may be  about 5 minutes. The vertical drive was fine for a while, but the horizontal did not worked
at all.
    Reply  Fri Sep 20 16:37:30 2013, Steve, Update, VAC, vertex crane folding arm is back on bushingBottom.jpgfoldingI.jpgnoLoadGap.jpgtrollyway.jpgtrollySee.jpg


    
        
            Quote:
        
        
            

            The folding beam removed as shown. Two man supporting it while I hammering it out. Pin was dry and it gulled into supporting hinges.
    Reply  Wed Sep 18 14:57:12 2013, Steve, Update, VAC, vertex crane folding arm removed manPower.jpgrotatingHinge.jpgsupportingHinge.jpggullingPin.jpg
 The folding beam removed as shown. Two man supporting it while I hammering it out. Pin was dry and it gulled into supporting hinges.
The rotating hinge will be machined and bushing will be added with Zerk fitting or similar. This will allow lubrication in the future.
 see elog #9111
    Reply  Thu Sep 5 10:47:58 2013, Steve, Update, VAC, vertex crane folding issue 5mmLess.jpg
 
 [Fred Goldbar, Mike Gerfen, Dennis Coyne and Steve]
We inspected the hinge, 1.25" cross pin and I-beams. It is hard to explain what is  causing the folding I-beam corner to jam against
    Reply  Wed Oct 2 14:25:39 2013, Steve, Update, VAC, vertex crane is still out of order grindingIbeam.jpgcableMoved.jpg500lbs@end.jpg
 
The smoke alarms were turned off and surrounding areas were covered with plastic.
The folding I-beam was ground down to be in level with the main beam.
    Reply  Wed Nov 13 08:46:03 2013, Steve, Update, VAC, vertex crane repair completed 


    
        
            nullQuote:
        
        
            
             
    Reply  Mon Sep 9 15:33:06 2013, Steve, Update, VAC, vertex crane repair is scheduled 


    
        
            Quote:
        
        
            

            
    Reply  Mon Sep 30 08:53:22 2013, Steve, Update, VAC, vertex crane repair schedule has changed 


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Thu Sep 30 09:34:58 2010, steve, Update, General, vertex crane trolly drive fixed P1060891.JPGP1060887.JPGP1060889.JPGP1060893.JPG


    
        
            Quote:
        
        
            
            The vertex crane drive is overheating, it stopped functioning. Service man will be here tomorrow morning.
Entry  Tue Jan 18 10:25:23 2011, steve, Update, PEM, vertex crane work this week 
The crane people are here. The Vertex chambers are covered with plastic. The PSL HEPAs will be running on high during the day.
It is going to be disturbingly noisy and dirty during the day. Please try start working in the evening if it can not wait till next week.
Entry  Tue Aug 31 02:50:45 2010, kiwamu, Update, CDS, vertex suspensions controlled by the new CDS 
I plugged the new CDS to the vertex suspensions. 
Now PRM, SRM, ITMs, MCs and BS are under the control of the