Entry  Mon Dec 9 11:44:08 2013, Steve, Update, endtable upgrade, ETMY optable got new beam dump ETMYoptBefore.jpgETMYoptAfter.jpg
Aluminum shield replaced by razor beam dump.
    Reply  Mon May 12 14:42:25 2014, steve, Update, endtable upgrade, optical table enclosure wall proposal and table at ETMY Hilite70.jpgETMY-ISCT.jpgRoscoThermashield.pdf


    
        
            Quote:
        
        
            

            Sanwiched wall as shown: 1" clear acrylic, 2 layers of 0.004" thick "window tint", 1 layer of  0.007"
    Reply  Fri Sep 11 10:56:47 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough ETMY-Nfeedt.jpg
The ETMY enclosure feedthrough - north is installed. The sealing material is hard to work with.

The upper empty blocks will be replaced by something soft to make changing cables easy.

 
    Reply  Tue Sep 15 16:49:08 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough ETMYsFeedt.jpg
ETMY optical table enclosure feedthrough- south is in. Now it is time to see how air tightness increases performance.




Quote:



The ETMY enclosure feedthrough
    Reply  Thu Sep 17 02:22:53 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough 
I doubt we'll see any effect until we carefully seal the holes. If there's 1 hole in your boat it still sinks.




Quote:



ETMY optical table enclosure
    Reply  Tue Dec 22 16:39:42 2015, Steve, Update, endtable upgrade, ETMY optical table enclosure IMG_0028.JPGIMG_0027.JPGETMY-ISCT_EISOL.jpg
I think there should be a scientifically based aveluation of the ETMY enclosure so we can make the ETMX better.

Meanwhile I'm counting pieces to move on with the south end table cover.

 
Entry  Thu Mar 10 16:29:32 2016, gautam, Update, endtable upgrade, Inventory check Inventory_check.pdfDoubler_comparison.pdf
I did a quick sweep of the lab to find out what hardware has already been acquired for the X-end table upgrade. The attached PDF is an inventory check
in the spirit of this elog.

Some things we have to decide:
    Reply  Thu Mar 10 16:32:45 2016, rana, Update, endtable upgrade, Inventory check 
Its not a good idea to use green mounts with green lasers. Steve should be able to get another copy of the EY doubler mount made up if we really don't
have another one sitting in the Manasa end table box which Koji mentioned.
    Reply  Mon Mar 14 22:42:23 2016, gautam, Update, endtable upgrade, Inventory check 



Quote:



Steve should be able
to get another copy of the EY doubler mount made up if we really don't have another one sitting in the Manasa end table box which Koji mentioned.
    Reply  Mon Mar 28 10:43:18 2016, Steve, Update, endtable upgrade, ETMX 4'x2' optical table pictures ETMX4x2Layout.jpgETMX_4x2.JPGETMXopt_4x2.JPG
 

 
    Reply  Wed Mar 30 17:38:52 2016, gautam, Update, endtable upgrade, X end table proposed layout  ETMX_3x2.JPGlayout_details_20160328.pdfETMX_proposed_layout.pdf
Attachment 1: This is a photo of the current X end table optical layout with the beampaths of the various sub-systems
overlaid. For the labels, see Attachment #2.

Attachment 2: This is a summary of all the optical components that are currently being used. I've noted some
    Reply  Thu Mar 31 09:38:41 2016, Steve, Update, endtable upgrade, Y end 4x3 existing layout ETMY4x3layout.jpg
Beam colors: 1064 nm red, 514 nm green and 633 nm yellow.

There should be room for lens in front of the pd at red3 and a mirror for alignment in the new layout.

This picture may help you how to improve the new ETMX 4' x 3' optical layout.
    Reply  Thu Mar 31 19:49:31 2016, gautam, Update, endtable upgrade, proposed layout v2 ETMX_proposed_layout_v2.pdf
The major changes from the previous layout:


I've depicted the Green reflected beam path more accurately - I approximately measured the angle of the rejected beam from the
faraday from the Y-end setup. This looks like a workable solution, and is similar to what we have currently at the Y-end
I've added some
    Reply  Mon Apr 4 10:59:12 2016, gautam, Update, endtable upgrade, proposed layout v3 ETMX_proposed_layout_v3.pdfIR_modematch.pdfGreen_modematch.pdfXendALaMode.zipETMX_proposed_layout_dimensions.dwg
I realized I had overlooked an important constraint in the layout, which is that the enclosure will have two supports that occupy some region of the
table - these are denoted in blue in v3 of the layout (Attachment #1). I measured the dimensions for these from the existing Y-endtable. The main subsystem
this has affected is the IR transmission monitors, but I've been able to move the photodiodes a little to accommodate this constraint.
    Reply  Mon Apr 4 15:04:14 2016, gautam, Update, endtable upgrade, COMPONENT REMOVAL 

I'm planning to start removing components from the X endtable tomorrow morning at ~10AM - if anyone
thinks I should hold off and do some further checks/planning, let me know before this so that I can do the needful.
    Reply  Tue Apr 5 11:42:17 2016, gaericqutam, Update, endtable upgrade, TABLE REMOVAL 
There is currently no table at the X end! 

We have moved the vast majority of the optics to a temporary storage breadbord, and moved the end table itself to the workbench at the end. 

Steve says Transportation is coming at 1PM to put the new table in.
    Reply  Wed Apr 6 17:52:21 2016, gautam, Update, endtable upgrade, First contact cleaning commenced 
I've begun cleaning the optics that will eventually go back onto the newly installed X-endtable. We decided that First Contact was the way to go
(as opposed to methanol drag wiping). Koji demonstrated the application of the (red) First Contact solution onto a 2" mirror - I then proceeded to
work on the rest of the optics. We are broadly following the procedure in E1000079 - first one coat of First Contact solution is applied, then a small
    Reply  Thu Apr 7 12:51:24 2016, gautam, Update, endtable upgrade, Beam height differences 
Steve has finished installing the enclosure on the new endtable. So Eric and I decided to try and lock the X arm and measure the beam height of the transmitted
IR beam relative to the endtable. We initially thought of using POX DC as a the LSC trigger but this did not work as there was no significant change in
it when the arm was flashing. Eric then tried misaligning the ITM and using AS110 as a trigger - this worked. We then recompiled the ASS model to take
    Reply  Thu Apr 7 14:30:58 2016, Steve, Update, endtable upgrade, ETMX table height ETMXbrs.pngETMX.jpgIMG_0618.JPGETMX.jpgETMXwc.jpg
 




Quote:



Steve has finished installing
    Reply  Fri Apr 8 09:13:20 2016, Steve, Update, endtable upgrade, ETMX-T beam height ETMXalignedT.pngETMXF.jpg
X arm resonating after alignment, beam height on ETMX optical table ~4.75"

 
Entry  Wed Apr 13 00:56:07 2016, gautam, Update, endtable upgrade, X endtable repopulation 
Over the last couple of days, I've been working on restoring the optical layout on the X-endtable. Some notes about the status as of today:

Lightwave NPRO output power

The output power from the lightwave NPRO is about 210mW (as measured with the calorimeter). This is significantly lower than the value of ~300mW
    Reply  Wed Apr 13 11:00:28 2016, Steve, Update, endtable upgrade, X endtable repopulation 
ETMX optical table is grounded to ETMX chamber through 1 Mohms

The doubling oven temp controller is installed to reach its cable.

 
    Reply  Wed Apr 13 18:25:07 2016, gautam, Update, endtable upgrade, Lightwave health check 
[Koji,gautam]

Lightwave NPRO information:

Model: 126-1064-700
    Reply  Fri Apr 15 18:38:12 2016, gautam, Update, endtable upgrade, Lightwave health check - NO IMPROVEMENT 
I re-measured the power levels today.

We have ~205mW out of the NPRO, and ~190mW after the Faraday. It doesn't look like the situation is going to improve dramatically. I'm
going to work on a revised layout with the Innolight as soon as I've profiled the beam from it, and hopefully, by Monday, we can decide that we are
    Reply  Tue Apr 19 18:37:29 2016, gautam, Update, endtable upgrade, Laser swap + optical layout IR_modematch_19April2016_2.pdf
Summary of work done over the last two days


Lightwave NPRO + controller moved to PSL table


​​The interlock is not connected
to the controller
Controller is not powered


Innolight NPRO + controller installed at endtable

​​​​Interlock
    Reply  Thu Apr 21 14:25:52 2016, gautam, Update, endtable upgrade, Green light recovered IMG_6567.JPGIMG_6568.JPGCVI_reflectivity.jpeg
I've made progress on the new layout up to the doubling oven. After doing the coarse alignment with the diode current to the NPRO at ~1A, I turned
it back up to the nominal 2A. I then rotated the HWP before the IR Faraday such that only ~470mW of IR
power is going into the doubler (the rest is being dumped on razor beam dumps). After tuning the alignment of the IR into the doubling oven using the steering
    Reply  Tue Apr 26 15:22:35 2016, Steve, Update, endtable upgrade, Cleaning ETMX vacuum dirty window ETMX-Tvp.jpgETMX-TvpDetail.jpg
Gautom is progressing with the layout nicely. The X-arm transmission window have not seen cleaning for decades. This should be the time to do it. Here
is picture of dirtiness.

It is not that simple... How much effort should we put in it? The hole table with 1W inno laser plus... set up now about ~500 lbs  We can
    Reply  Tue Apr 26 23:19:42 2016, gautam, Update, endtable upgrade, Green aligned to arm - high order mode flashes seen IMG_2219.JPGIMG_2220.JPG
Attachment #1

Layout as of today. Most of the green path is done. The Green REFL PD + PZT mirrors have not been hooked up to their respective power sources
yet (I wonder if it's okay to start laying cables through the feedthroughs on either end of the table already, or
    Reply  Wed Apr 27 15:04:47 2016, Steve, Update, endtable upgrade, Cleaning ETMX vacuum dirty window 1cETMX-Tcmp.jpg
It looks very promising.

 
    Reply  Thu Apr 28 00:41:08 2016, gautam, Update, endtable upgrade, more progress - Transmon PD installed 
The IR Transmon system is almost completely laid out, only the QPD remains to be installed. Some notes:


The "problem" with excessive green power reflected from the harmonic separator has been resolved. It is just very sensitive
to the angle of incidence. In the present configuration, there is ~10uW of green power reflected from either side, which shouldn't be too worrisome.
    Reply  Fri Apr 29 00:55:46 2016, gautam, Update, endtable upgrade, green PDH locked to Xarm 
Using the modulation frequency suggested here, I hooked up the PDH setup at the X-end and
succeeded in locking the green to the X arm. I then rotated the HWP after the green Faraday to maximize TRX output, which after a cursory alignment optimization
is ~0.2 (I believe we were used to seeing ~0.3 before the end laser went wonky). Obviously much optimization/characterization remains to be done. But for
    Reply  Fri Apr 29 16:05:23 2016, gautam, Update, endtable upgrade, Cleaning ETMX vacuum dirty window IMG_0755.JPG
After a second round of F.C. application, I think the window is clean enough and there are no residual F.C. pieces anywhere near the central parts of
the window (indeed I think we got most of it off). So I am going to go ahead and install the Oplev. 




    Reply  Mon May 2 19:14:18 2016, gautam, Update, endtable upgrade, Optical layout almost complete ETMX_wedge.pdf
With Steve's help, I installed the Oplev earlier today. I adjusted the positions of the two lenses until I deemed the spot size on the QPD satisfactory
by eye. As a quick check, I verified using the DTT template that the UGF is ~5Hz for both pitch and yaw. There is ~300uW of power incident on the QPD (out
of ~2mW from the HeNe). In terms of ADC counts, this is ~13,000 counts which is about what we had prior to taking the endtable apart. There are a couple
    Reply  Thu May 5 03:05:37 2016, gautam, Update, endtable upgrade, ALS status update ALS_noiseSpec_5May2016_2.pdfCoherence_5May2016.pdfimage.jpeg
[ericQ, gautam]

Today we spent some time looking into the PDH situation at the X end. A summary of our findings.


There is something that I don't understand with regards to the modulation signal being sent to the laser PZT via the sum+HPF pomona
    Reply  Thu May 5 14:05:01 2016, rana, Update, endtable upgrade, ALS status update 
All seems very fishy. Its not good to put attenuators and filters in nilly-willy.


Once the post-PD bandpass has been designed and constructed, you should be able to use whatever PD gain setting gives you the best SNR.
There's no need to use more PD gain than necessary; it just reduces the PD bandwidth. What is the input referred current noise of the PD at the different
    Reply  Thu May 5 21:28:44 2016, gautam, Update, endtable upgrade, Innolight PZT capacitance 
I suggested in an earlier elog that after the repair of the NPRO, the PZT capacitance
may have changed dramatically. This seems unlikely - I measured the PZT capacitance with the BK Precision LCR meter and found it to be 2.62
nF, which is in excellent agreement with the numbers from elogs 
    Reply  Thu May 19 16:29:20 2016, Steve, Update, endtable upgrade, Optical layout almost complete ETMX_4x3_closed.jpgsealedETMXenclosure.jpg
 

 
    Reply  Fri Sep 30 19:53:07 2016, gautam, Update, endtable upgrade, X end IR pickoff fiber coupled 
[johannes, gautam]

Today we re-installed the fiber coupler on the X-endtable to couple some of the PSL light into a fiber that runs to the PSL table, where it is
combined with a similar PSL pickoff to make an IR beat between the EX AUX laser and the PSL. The main motivation behind this was to make the process of
    Reply  Wed Oct 5 16:28:10 2016, gautam, Update, endtable upgrade, EX laser power monitor PD installed 
I installed a 10% BS to pick off some of the light going to the IR fiber, and have added a Thorlabs PDA55 PD to the EX table setup. The idea is to be
able to monitor the power output of the EX NPRO over long time scales, and also to serve as an additional diagnostic tool for when ALS gets glitchy etc.
There is about 0.4mW of IR power incident on the PD (as measured with the Ophir power meter), which translates to ~2500 ADC counts (~1.67V as measured
Entry  Tue Apr 22 22:19:02 2008, rob, Metaphysics, lore, jiggling sliders 

In the interests of tacit communication of scientific knowledge, I here reveal a nugget of knowledge which may or may not prove useful to new LIGOites:
sometimes when front-end machines are rebooted, the hardware they control can wind up in a state which is not accurately represented by the EPICS values
Entry  Sun Nov 2 20:21:58 2008, rana, Configuration, lore, HP 5550dtn (Grazia) set up on allegra 
I set up printing to grazia from allegra. The CUPS interface was not as straightforward as Tobin had made it seem in the Wiki. I had to type in the IP address
and port number by hand.
    Reply  Thu Jan 8 16:49:37 2009, rana, Configuration, lore, HP 5550dtn (Grazia) set up on allegra 
[quote]I set up printing to grazia from allegra. The CUPS interface was not as straightforward as Tobin had made it seem in the Wiki. I had to type in the
IP address and port number by hand.
Entry  Wed May 13 02:53:12 2009, rob, Summary, lore, Channel Hopping: That ancient enemy (MC problems) 
We were stymied tonight by a problem which began late this afternoon.  The MC would periodically go angularly unstable, breaking lock and tripping
the MC2 watchdogs.  Suspicion fell naturally upon McWFS.
Eventually I traced the problem to the MC3 SIDE damping, which appeared to not work--it wouldn't actually damp, and the Vmon values did not correspond
    Reply  Wed May 13 14:43:29 2009, rob, Summary, lore, Channel Hopping: That ancient enemy (MC problems) MC3sidemon.png


    
        
            Quote:
        
        
            
            We were stymied tonight by a problem which began late this afternoon.  The MC would periodically go angularly
Entry  Fri Oct 23 15:02:00 2009, rob, Update, lore, marconi phase 
So, it appears that one doesn't even have to change the Marconi set frequency to alter the phase of the output signal.  It appears that other front
panel actions (turning external modulations on/off, changing the modulation type) can do it as well.  At least that's what I conclude from earlier
this morning, when after setting up the f2 Marconi (166MHz) for external AM, the double-demod handoff in the DRMI no longer worked.  Luckily this
    Reply  Sat Oct 24 04:57:33 2009, rana, Update, lore, marconi phase 


    
        
            Quote:
        
        
            
            So, it appears that one doesn't even have to change the Marconi set frequency to alter the phase of the output signal. 
Entry  Mon Dec 14 15:18:18 2009, Jenne, Update, lore, armLoss script ran....results confidential 
I ran the armLoss script for both Xarm and Yarm.  The results are confidential, pending the completion of Alberto's cavity pole/finesse measurement
due to the 'bet' as to what the new losses are after the drag wiping.
If you're the kind of person who likes to look at their Chrismas presents, the log files with the results are in the usual place for this script:
    Reply  Wed Feb 3 09:01:42 2010, rob, Update, lore, IFO isn't playing nice tonight 


    
        
            Quote:
        
        
            
            I checked the situation from my home and the problem was solved.
Entry  Fri Feb 12 14:19:28 2010, rana, steve, HowTo, lore, International Fax 
Steve showed me how to send an international fax today:

    Load paper.
    Dial:   011 - (country code) - number
    Press START (either the black or color
option)
    wait for the screaming fax noise
    Done

 
Entry  Wed Oct 6 14:49:54 2010, rana, Summary, lore, Steve on the sea jacques.jpg
 