Entry  Fri May 21 16:27:45 2010, Alberto, Omnistructure, Environment, The control room is molding... 
... not just because we haven't locked the interferometer for quite some time. I mean, it literally stinks. The chiller's chiller is molding. Its' dripping
water and there's mold all under it (Jo just confirmed: "yeah, it's mold").
Someone from Caltech maintenance just crossed the door. Hopefully he'll help us fix it.
Entry  Wed May 26 17:10:09 2010, Alberto, Update, 40m Upgrading, RF Generation box Visio-frequencyGenerationBox_wiringSchematic.png
This is how the RF generation box might soon look like:
Entry  Wed May 26 22:22:03 2010, Alberto, Configuration, 40m Upgrading, Arm cavity length reflRFpowerVsArmLength_3658m.pngreflRFpowerVsArmLength_3750m.png
The second sideband is resonant in the arms for a cavity length of 37.9299m.
The nearest antiresonant arm lengths for f2 (55MHz) are 36.5753m and 39.2845m.
If we don't touch the ITMs, and we use the room we still have now on the end tables, we can get to 37.5m.
Entry  Thu May 27 12:52:02 2010, Alberto, Update, 40m Upgrading, Arm lengths 

For both sidebands to be antiresonant in the arms, the first modulation frequency has to be:
Entry  Fri May 28 07:13:05 2010, Alberto, Frogs, Green Locking, SR785 found abandoned next to the workbenches 
A poor lonely SR785 was found this morning roaming around in the lab in evident violation of  the fundamental rule which requires all the equipment on
carts to be brought back inside the lab right after use.
The people and the professors related to the case should take immediate action to repair for their misdeed.
Entry  Fri May 28 21:32:32 2010, Alberto, Update, 40m Upgrading, MC alignment 
[Alberto, Kiwamu, Kevin, Rana]
Today we tried to measured the beam shape after the MC MMT1 that Jenne installed on the BS table.
The beam scan showed a clipped spot. We tracked it down to the Farady and the MCT pickoff mirror.
Entry  Sun May 30 15:33:21 2010, Alberto, Configuration, IOO, mode cleaner and air conditioning 
The mode cleaner is locked and the air conditioning is full on. So the the air conditioning doesn't seem to be so important for the lock to hold.
Entry  Sun May 30 15:36:22 2010, Alberto, Configuration, PSL, IMC periscope shutter 
Two days ago I opened the PSL shutter by switching the switch on the shutter driver. That caused the shutter's switch on the medm screen to work in reversed
mode: open meant closed and closed meant open.
I fixed that. Now the medm screen switch state is correct.
Entry  Tue Jun 1 16:29:51 2010, Alberto, Update, IOO, MC transmitted beam aligned to the Faraday; next things to do 
We moved the MC-trans pick-off mirror (= the beam splitter between the input of the Faraday and the steering mirror located right after MC3). Now the
beam goes through the Farady without getting clipped.
This is the list of the things that have to be done next:
    Reply  Mon Jun 7 07:39:38 2010, Alberto, Omnistructure, Electronics, Capacitor Bridge Test 


    
        
            Quote:
        
        
            
            To get a feel for the Capacitive Bridge problems, we setup a simple bridge using fixed (1 nF) caps on a breadboard.
    Reply  Thu Jun 10 07:53:14 2010, Alberto, Update, PEM, LaTeXlabs 


    
        
            Quote:
        
        
            
            BTW, latex launched this new thing for writing pdfs. doesnot require any installations. 
    Reply  Thu Jun 10 11:10:21 2010, Alberto, Update, General, LaTeXlabs 


    
        
            Quote:
        
        
            
            I could not dare to share my google doc with this site...
Entry  Sat Jun 12 19:41:04 2010, Alberto, Update, Locking, 40m Upgrade Optickle Model optickleIFOworkingpoint.pdf
I wrote down the settings according to which I tuned the optickle model of the 40m Upgrade.
Basically I set it so that:

    PRC alone anti-resonant for the carrier and resonant for both sidebands
    SRC alone resonant for the carrier and resonant
Entry  Sat Jun 12 19:43:19 2010, Alberto, Update, WIKI-40M Update, IFO modeling Wiki Page updated 
Today I started writing the IFO modeling wiki page.
The idea is to make it a reference place where to share our modeling tools for the 40m.
    Reply  Wed Jun 16 18:44:07 2010, Alberto, Configuration, Computers, 40MARS 


    
        
            Quote:
        
        
            
            i added my laptop's mac address to teh martian at port 13 today.
Entry  Thu Jun 17 17:09:44 2010, Alberto, Update, LSC, Short Cavity Length Adjustments 
I calculated the phase shifts that the sidebands would pick up in the arms in the case we changed the arm length to 38.4m as proposed. I obtained
the following values (in degrees):
phi(-f2) = 0.66; phi(-f1) = -0.71; phi(f1) = 0.71; phi(+f2) = -0.66
    Reply  Fri Jun 18 15:07:26 2010, Alberto, Update, LSC, Short Cavity Length Adjustments 


    
        
            Quote:
        
        
            
            You should have been in my lecture yesterday!
    Reply  Fri Jun 18 22:12:29 2010, Alberto, Update, IOO, Mode Profile after Mode Matching Telescope (Round 2) 
GJ
Entry  Wed Jul 7 17:18:57 2010, Alberto, Configuration, Electronics, Stochmon and LSC AM Stabilizer Decomissioned 
Today I disconnected and removed the Stochmon box from the 1Y2 rack.
I also removed the amplifiers that were sitting on the PSL table,
next to the RF AM PD, that were connected to the Stochmon. I pulled back the RG cable and the power cables that went from the PSL table to the 1Y1 and
1Y2 racks.
The power cable, all rolled up, is now sitting on the floor, inside the 1Y1 rack and one of its end is still connected to the power
Entry  Thu Jul 15 12:21:08 2010, Alberto, Configuration, LSC, PRC and SRC length adjustements 8x
Lately I've been trying to calculate the corrections to the recycling cavity lengths that would compensate for the phase that the sidebands will pick
up from the arms in the upgraded interferometer.
    Reply  Thu Jul 15 16:16:51 2010, Alberto, Configuration, LSC, PRC and SRC length adjustements 


    
        
            Quote:
        
        
            
            Tell me whether it is correct or not. Otherwise I won't be able to sleep tonight.
Entry  Fri Jul 16 16:12:31 2010, Alberto, Configuration, Computers, c1susvme1/2 rebooted 
Today I noticed that the FE SYNC counters of c1susvme1/2 on the RFM network screen were stuck at 16384. I tried to reboot the machines to fix the problem
but it didn't work.
The BS watchdog tripped off when I did that, because I had forgotten to disable it. I had to wait for a few minutes before it settled down again.
    Reply  Thu Jul 22 07:19:56 2010, Alberto, Update, Treasure, Monsters, LNVR, and Phase noise 


    
        
            Quote:
        
        
            
            On Picasa
    Reply  Thu Jul 22 15:59:29 2010, Alberto, Update, PSL, PSL front end machine 


    
        
            Quote:
        
        
            
            It looks like something wrong happened around the PSL front end.  One
    Reply  Thu Jul 22 18:18:54 2010, Alberto, Update, PSL, Problem Solved 


    
        
            Quote:
        
        
            
            
            
  
Entry  Sat Jul 24 14:03:19 2010, Alberto, Update, Electronics, FSS Oscilaltor Phase Noise Measurement FSScrystalPhaseNoiseHigherGain.pdf
[Rana, Alberto]
Today we measured the phase noise of the oscillator used for the FSS.
The source is a Wenzel crystal at about 21.5MHz that Peter Kalmus built some time ago.
Entry  Sun Jul 25 18:47:23 2010, Alberto, Update, SVN, Optickle 40mUpgrade model updated to include short cavity length corrections 
I uploaded an updated optickle model of the upgrade to the SVN directory with the optickle models (here).
Entry  Thu Jul 29 22:08:32 2010, Alberto, Update, SUS, More optics installed on the BS table 
[Koji, Steve, Kiwamu, Alberto]
- This afternoon we installed a few new optics on the BS table: GR_PBS, GRY_SM2, GRY_SM1.
- We pulled up the cables so that we had more freedom to move one of the cable towers farther South.
Entry  Tue Aug 17 09:06:08 2010, Alberto, Update, elog, elog was down 
I just restarted the elog after I found it down a few minutes ago.
Entry  Fri Aug 20 16:41:43 2010, Alberto, Update, Electronics, Frequency Generation Box Assembly Completed 7x
I finished assembling the frequency generation unit for the upgrade. I tested it through to check that the power levels are as expected at the various
connection (see attached png, showing in black the design power values, and in red the measured ones).
Because of some modifications made on the design along the construction, I have to recalculate the SNR along the lines.
Entry  Tue Aug 31 17:58:38 2010, Alberto, Update, Electronics, FSS Frequency Generation Box - Phase Noise 2010-08-31_FSSPhaseNoise04modified.png
A few weeks ago, on Jul 24, Rana and I measured the phase noise of the FSS frequency box (aka the 'Kalmus Box'). See elog entry 3286.
That time, for some reason, we measured a phase noise higher than we expected; higher than that of the Marconi.
I repeated the measurement today using the SR785 spectrum analyzer. Here is the result:
Entry  Wed Sep 1 07:52:27 2010, Alberto, Configuration, Electronics, PMC board unplugged, turned on Sorensen switches on 1Y1 rack 
Today I put the FSS frequency box back into the 1Y1 rack.
To power it on, I turned on the 24V and 15V Sorensen switches in the same rack.
The PMC crystal board in the same rack should not be affected (it runs with 10V), but, to make sure it was not powered, I disconnected it from
    Reply  Wed Sep 1 08:40:28 2010, Alberto, Configuration, Electronics, PMC board unplugged, turned on Sorensen switches on 1Y1 rack 


    
        
            Quote:
        
        
            
            Today I put the FSS frequency box back into the 1Y1 rack.
Entry  Wed Sep 1 11:34:39 2010, Alberto, Update, Electronics, FSS Box Phase Noise from DAQ 2010-09-01_FSSPhaseNoise.png2010-09-01_FSSphaseNoiseMeasurementSetup.png
I measured the phase noise of the LO output of the FSS box from the DAQ. I'm attaching the results.
As we expected, the measurement is limited by the internal phase noise of the Marconi.
    Reply  Wed Sep 1 16:29:28 2010, Alberto, Update, Electronics, FSS Box Phase Noise from DAQ - Measurement setup modified 2010-09-01_FSSPhaseNoise_DAQ_00-02_comparison.png2010-09-01_FSSPhaseNoise_DAQ_02.pngFSSphaseNoiseMeasurementSetup02.png


    
        
            Quote:
        
        
            
            The differences between this setup and the one used previously is the lack of the 50 Ohm terminator in the mixer output
Entry  Fri Sep 3 11:03:41 2010, Alberto, Frogs, Electronics, Cable cutting tools 
I found this very interesting German maker of cool cable cutting tools. It's called Jokari.
We should keep it as a reference for the future if we want to buy something like that, ie RF coax cable cutting knives.
http://www.jokari.de/en.htm
Entry  Mon Sep 6 10:08:10 2010, Alberto, Configuration, Computers, Netgear Network Switch fan broken. 
The Netgear Network Switch in the top shelf of Nodus' rack has a broken fan. It is the one interfaced to the Martian network.
The fan must have broken and it is has now started to produce a loud noise. It's like a truck was parked in the room with the engine running.
Also the other network switch, just below the Netgear, has one of its two fans broken. It is the one interfaced with the General Computer Side.
Entry  Mon Sep 6 22:09:11 2010, Alberto, Update, Electronics, RF Frequency Generation Box heat sink installed and tested DSC_2467.JPG2010-09-06_FreqBoxAmplifierTemperatureTrend.pngDSC_2433.JPG
Last week I noticed that the high power amplifiers in the Frequency Generation Box became hot after 2 hours of continuous operation with the lid of the
box closed. When I measured their temperature it was 57C, and it was still slowly increasing (~< 1K/hr).
According to the data sheet, their maximum recommended temperature is 65C. Above that their performances are not guaranteed anymore.
Entry  Tue Sep 7 08:56:00 2010, Alberto, Update, Electronics, Frequency Generation Box Assembly - Phase Noise Measurements 2010-09-03_FreqBoxPhaseNoise_AllOutputsComparison_smooth.png2010-09-03_FreqBoxPhaseNoise_AllOutputsComparison_smooth.pdf
Here are the results of my phase noise measurements on the 7 outputs of the Frequency Generation Box. (BIN=95L applied by DTT). See attached pdf for
a higher definition picture.
Entry  Tue Sep 7 13:31:49 2010, Alberto, Update, Electronics, RF System - Frequency Distribution Box - Priority Plan Visio-RFsystem_plan_distributiont.pngRFsystem_plant_distribution_priority.png
We need a distribution unit in the LSC rack to: 1) collect the demod signals coming from the Frequency Generation Box 2) adjust the power level 3) generate
2nd harmonics (for POP) 4) distribute the demod signals to the single demodulation boards.
The base line plan is the following:
Entry  Tue Sep 7 15:57:07 2010, Alberto, Configuration, Computers, Nodus connection not working. Fixed 
[Joe, Alberto]
The Nodus connection to the Martian network stopped working after someone switched cables on the Netgear router. Apparently that router doesn't
like to have the 23 and 24 ports connected at the same time.
Entry  Tue Sep 7 22:21:17 2010, Alberto, Configuration, Computers, elog restarted 
 
Entry  Thu Sep 9 12:02:03 2010, Alberto, Update, Electronics, Frequency Generation Box - Amplitude Noise Measurements FreqBoxAmplitudeNoiseMeasurementSetup.pngFreqBoxAmplitudeNoise_BusbyBox_AllChannels.png
I measured the amplitude noise of the source outputs and the EOM outputs of the Frequency Generation box.
the setup I used is shown in this diagram:
Entry  Thu Sep 9 18:53:56 2010, Alberto, Configuration, Electronics, Busby Box, Rai's Box, SR554 in the RF cabinet 
I stored the Busby Box, the Rai's Box and the SR554 preamp in the RF cabinet down the Y arm.
Entry  Mon Sep 13 11:40:50 2010, Alberto, Update, Electronics, Frequency Box Documentation Added to the SVN freqBoxSVNdierctoryStructure.png
I uploaded all the material about the RF frequency Generation Box  into the SVN under the path:
https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/RFsystem/frequencyGenerationBox/
I structured the directory as shown in this tree:
    Reply  Tue Sep 14 18:07:41 2010, Alberto, Update, Electronics, Frequency Box Documentation Added to the SVN 
I completed a LIGO document describing design, construction and characterization of the RF System for the 40m upgrade.
It is available on the SVN under https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/RFsystem/RFsystemDocument/
It can also be found on the 40m wiki (http://lhocds.ligo-wa.caltech.edu:8000/40m/Upgrade_09/RF_System#preview), and DCC under the number T1000461.
    Reply  Fri Oct 22 18:22:27 2010, Alberto, Update, Electronics, Epic Takeover 


    
        
            Quote:
        
        
            
            As the suspension work winds down (we'll be completely done once the ETMs arrive, are suspended, and then are placed
    Reply  Tue Oct 26 07:02:05 2010, Alberto, Configuration, elog, ELOG 2.8.0 -> ELOG 2.7.5 


    
        
            Quote:
        
        
            
            ELOG reverted to 2.7.5 due to editing difficulties
    Reply  Thu Nov 11 07:26:03 2010, Alberto, Update, Electronics, REFL11 Photodiode Not Working 


    
        
            Quote:
        
        
            
            [Koji and Kevin]
Entry  Mon Mar 25 18:58:09 2013, Albert Yang, Update, optical tables, Optical Table Toolboxes 
For those of you who spend annoying amounts of time looking for tools, fear no more. Toolboxes for each optical table are coming!
They will probably have:
IR Viewer (a few optical tables will have IR viewers, these specific tables will be labeled in the diagram coming out later)
ELOG V3.1.3-