    Reply  Fri Nov 22 16:32:08 2013, Steve, Update, VAC, RGA scan at day 108 RGAscanVacNormal108d.pngday108.pngpd76m110d.png


    
        
            Quote:
        
        
            

            
    Reply  Fri Dec 13 16:34:20 2013, Steve, Update, VAC, PS will be replaced next week hotPSvacRack.jpgfan1X8.jpg


    
        
            Quote:
        
        
            

           Instrument rack power supplies checked and labeled at present loads.
    Reply  Fri Dec 20 20:04:01 2013, Steve, Update, VAC, power supply replaced with a short vent 4hrPumpdown.pngpumpdownAfterHickup.pngPSpumpdown.png


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Fri Dec 20 23:00:41 2013, Koji, Update, VAC, power supply replaced with a short vent 
I'm leaving the 40m now. IFO is aligned. Everything look good.
- The main volume P1=5e-4, CC1=1.4e-5 is still pumped by TP1 and TP2
- RGA P4<0e-4, CC4 2.1e-7, is pumped by TP3
    Reply  Sat Dec 21 10:53:35 2013, Steve, Update, VAC, power supply replaced with a short vent-pumpdown completed 20hrsVacNormal.png
The recovery- pumpdown reached valve configuration  vacuum normal at 20 hours, cc1 7.7e-6 Torr
Lesson learned: turn all pumps off, close all valves before you reboot
! like you
    Reply  Thu Jan 2 10:50:24 2014, Steve, Update, VAC, vacuum monitor is still blank Help.pngvacation.png20131220lastRGAscan.png
 The date is correct on this monitor.
Last stored RGA scan data Dec 20, 2013
IFO pressure at CC1 5.8e-6 Torr
    Reply  Thu Jan 2 13:35:06 2014, Koji, Update, VAC, vacuum monitor is still blank 
We probably need to restart the machine, but I didn't want to touch c1vac1 and c1vac2. 
    Reply  Fri Jan 3 11:18:41 2014, Steve, Summary, VAC, power supply replaced with a short vent rebootVENT.png


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Mon Jan 13 16:50:55 2014, Steve, Update, VAC, Maglev controller needs service 


    
        
            Quote:
        
        
            

            The date is correct on this monitor.
    Reply  Tue Jan 21 17:26:59 2014, Jenne, Summary, VAC, Rebooted RGA computer and reset RGA settings 
[Jenne, Steve]
Steve noticed that the RGA was not logging data and that not all the correct connection lights were on, and he wasn't able to run the "RGAset.py"
script (in ...../scripts/RGA/) that sets up the proper parameters. 
    Reply  Wed Jan 22 15:24:11 2014, Steve, Summary, VAC, Rga scan after reboot Rgascan169dwarmingup.pngBlankMedmMustBeFixed.png


    
        
            Quote:
        
        
            

           [Jenne, Steve]
    Reply  Thu Jan 23 08:04:04 2014, Steve, Update, VAC, vacuum control screen is blank pd76m170d2dRgaOn.png
 
There is BLANK VacControl_BAK.adl 
screen only. 
    Reply  Thu Jan 23 13:23:10 2014, Steve, Update, VAC, 40m IFO is at atmosphere 


    
        
            Quote:
        
        
            

            
    Reply  Mon Jan 27 09:08:00 2014, Steve, Update, VAC, 4 days at atmosphere day4atm.pngvent76bgTp3d4.png
 
 
    Reply  Tue Jan 28 11:13:50 2014, Koji, Update, VAC, vacuum monitor is still blank 
[Steve Koji]
We pushed the reset button of c1vac1 and c1vac2 and the vacuum screen is back.
First, we pushed the reset button of c1vac1 and pushed the one on c1vac2.
    Reply  Tue Jan 28 16:26:40 2014, Steve, Update, VAC, vacuum computers are back without safety c1vac1_vac2areback.png


    
        
            Quote:
        
        
            

           [Steve Koji]
    Reply  Wed Feb 5 08:14:59 2014, Steve, Update, VAC, vacuum computers are back without safety 


    
        
            Quote:
        
        
            

            
    Reply  Wed Feb 5 19:36:50 2014, Steve, Update, VAC, pumpdown at 25 Torr pd77at3.5h.png


    
        
            Quote:
        
        
            

           [Steve, Manasa]
    Reply  Wed Feb 5 19:53:51 2014, Steve, Update, VAC, pumpdown stops for the day at 14 Torr stopHere.png
 
 
    Reply  Thu Feb 6 11:14:07 2014, Steve, Update, VAC, pumpdown completed pd77.png
 Pumpdown completed. IR shutter opened at P1 1 mTorr  The block is still in the beam path.
Remember to protect MCR pd before crack up the PSL power.
The ion pump gate valves were just closed by cc1 triggered interlock
    Reply  Mon Feb 10 09:45:53 2014, Steve, Update, VAC, vacuum normal is reached pd77m5d.png13daysAtm.png
 


    
        
            Quote:
        
        
            
    Reply  Tue Feb 11 10:44:15 2014, Steve, Update, VAC, RGA scan at day 6 pd77m6d.png
 
 
    Reply  Tue Feb 18 10:38:55 2014, Steve, Update, VAC, RGA scan at day 13 pd77m13d.pngRGAscan13d.png
 All normal.
 
    Reply  Fri Mar 7 16:13:03 2014, Steve, Update, VAC, pumping speed is recovered pumpingSpeed.png


    
        
            Quote:
        
        
            

            
    Reply  Wed Mar 12 08:40:42 2014, Steve, Update, VAC, RGA scan at day 35 pd77m35d.png
 
 
    Reply  Mon Mar 24 10:41:46 2014, Steve, Update, VAC, RGA scan at day 50 pd77m50dRGA.png
 
 
Entry  Mon Mar 24 19:42:12 2014, Charles, Frogs, VAC, Power Failure 
 The 40m experienced a building-wide power failure for ~30 seconds at ~7:38 pm today.
Thought that might be important...
    Reply  Tue Mar 25 14:52:57 2014, steve, Update, VAC, vacuum is recovered 17hrsNoPumping.png
 Out gassing plus leak rate   0.15  mTorr / hour
 The pressure rose to 2.5 mTorr in 17 hours
 V1 was opened at 1:56pm
    Reply  Fri Mar 28 16:26:20 2014, steve, Update, VAC, RGA scan after power failure afterPowerFailure.png


    
        
            Quote:
        
        
            

            Out gassing plus leak rate   0.15  mTorr / hour
    Reply  Wed Apr 2 16:34:15 2014, Steve, Update, VAC, Maglev controller needs service 


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Thu Apr 3 17:05:52 2014, Steve, Update, VAC, Maglev controller swapped loanerControllerIn.png


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Thu Apr 10 16:09:29 2014, Steve, Update, VAC, RGA scan at 75% pumping speed 520HzpumpingSpeed.png


    
        
            Quote:
        
        
            

            
    Reply  Mon Apr 21 10:14:00 2014, Steve, Update, VAC, Maglev controller serviced ourControllerBack560Hz.png


    
        
            Quote:
        
        
            

            
    Reply  Tue Apr 29 16:42:29 2014, Steve, Update, VAC, TP2 drypump replaced dryforepumpreplaced.png


    
        
            Quote:
        
        
            

            
    Reply  Tue May 27 11:00:43 2014, Steve, Update, VAC, RGA scan at day 111 pd77d111RGA.png
 
 Rga scan at pump down 77, vacuum normal valve configuration, maglev rotation 560 Hz and day 111
Entry  Mon Jun 30 10:06:39 2014, Steve, Update, VAC, low on pneumatic pressure of vacuum valves runoutofN2.pnglowN2.pngN2d100.png
This morning valve condition: V1, VM1, V4 and V5 valves were closed. IFO pressure rose to 1.3 mTorr
It was caused by low N2 pressure.  Our vacuum valves are moved-controlled by 60-70 PSI of nitrogen.
When this supply drops below 50-60 PSI the interlock closes V1 valve. This is the minimum pressure required to move the large valves.
    Reply  Wed Jul 2 11:47:26 2014, Steve, Update, VAC, broken changeover regulator of N2 supply 


    
        
            Quote:
        
        
            

           This morning valve condition: V1, VM1, V4 and V5 valves were closed. IFO pressure rose to 1.3 mTorr
Entry  Mon Jul 21 10:51:06 2014, Steve, Update, VAC, N2 supply run out outofN2.png
Interlock closed valve V1, V4, V5 and VM1 when the nitrogen supply run out. The IFO pressure rose to P1 1 mTorr
In order to recover Vacuum Normal valve configuration I did the following:
Replaced both nitrogen cylinders. Confirmed pneumatic nitrogen pressure 70 PSI.   Opened valves V4 and V5
    Reply  Thu Aug 21 15:07:48 2014, Steve, Update, VAC, RGA scan at day 197 RGAscan@d197.png
 
 
    Reply  Mon Sep 22 15:20:32 2014, Steve, Update, VAC, RGA scan at day 229 RGA@229day.pngRGAscan229d.png
 
 
    Reply  Wed Sep 24 08:40:29 2014, Steve, Update, VAC, Vent has started vent77.pngbvent77.png
 
 Jam nuts checked. Oplev servos turned off. Particle count checked. Vertex crane functionality checked.
Entry  Wed Sep 24 13:28:48 2014, Steve, Update, VAC, vent is completed ventiscompleted.pngatAtm.png
 The vent is completed. ITMX was kicked up accidentally. Valve configuration: chamber open, RGA is pumped through VM2  Maglev
    Reply  Wed Sep 24 16:02:58 2014, Jenne, Update, VAC, vent is completed 
[Steve, EricQ, Jenne]
ITMY and BS heavy doors are off, light doors are on.  Q is aligning the IFO.
    Reply  Thu Sep 25 08:21:15 2014, Steve, Update, VAC, vent day 1 ventDay1.png


    
        
            Quote:
        
        
            

           [Steve, EricQ, Jenne]
    Reply  Mon Sep 29 09:11:25 2014, Steve, Update, VAC, vent day 5 RGA scan v77_bg-mag-d5.png
 
 
    Reply  Mon Sep 29 10:29:25 2014, Steve, Update, VAC, RGA is not running rgascanTimeStamp.png
 
 The RGA time stamp was correct last at 20140527
 
    Reply  Tue Sep 30 16:18:57 2014, Steve, Update, VAC, pump down #78 has started pd78hastarted.png
 
Q checked the earth quake stops of SRM and we put the ITMY & BS doors on. 
    Reply  Tue Sep 30 18:02:53 2014, Steve, Update, VAC, pump down #78 stops at 320 Torr 3h.png
 
We  stopped pumping just short of 3 hours at 320 Torr.  Pumping speed was 2.7 Torr / min with partially closed RV1 and butterfly valve/
RP1&3 roughing pump hose is disconnected. Butterfly valve removed. The vac envelope is closed. 
    Reply  Wed Oct 1 10:21:19 2014, Steve, Update, VAC, pump down #78 stops at 3.5 Torr pd78secondStop.png


    
        
            Quote:
        
        
            

            
    Reply  Wed Oct 1 16:26:53 2014, Steve, Update, VAC, pump down #78 completed pd78completedin25hrs.png
 
 Pump down reached "vacuum normal" state. IFO _P1 pressure 1e-4 torr in 8 hrs actual pumping time
 PSL shutter is opened.