ID |
Date |
Author |
Type |
Category |
Subject |
6706
|
Tue May 29 15:55:22 2012 |
steve | Update | SUS | ETMY oplev spot size reduced |
Quote: |
Quote: |
The typical sign of a dying gas laser is that it glows for a few minutes only. The power supplies are fine.
Two new JDS - Uniphase 1103P lasers ( NT64-104 ) arriving on Monday, May 21
|
Yesterday I swapped in new He/Ne laser with output power 3.5 mW The return spot on qpd is large ~6mm in diameter and 20,500 counts
The spot size reduction require similar layout as ETMX oplev.
|
The oplev path is relayed and the spot size on the qpd is reduced. I still have to clean up and replace "Miki Mouse" lens holder.
There was no IP-ANG coming out of the chamber at this time! |
6729
|
Thu May 31 11:02:14 2012 |
steve | Update | Locking | ETMX 1064 trans camera |
Quote: |
Quote: |
...will be helpful for acquiring lock after the vent. We should install a camera at ETMX.
|
Do that.
|
Jenne and Steve
Sony CCD in place needs alignment and ND filter |
6738
|
Fri Jun 1 08:01:46 2012 |
steve | Update | Computers | c1sus and c1iscex are down |
Quote: |
Something bad happened to c1sus and c1iscex ~20 min ago. They both have "0x2bad" 's. I restarted the daqd on the framebuilder, and then rebooted c1sus, and nothing changed. The SUS screens are all zeros (the gains seem to be set correctly, but all of the signals are 0's).
If it's not fixed when I get in tomorrow, I'll keep poking at it to make it better.
|
|
6739
|
Fri Jun 1 08:17:47 2012 |
steve | Update | IOO | PMC trends |
Quote: |
IOO Angle & IOO Position QPDs centered.
|
PMC trend of 400 and 1200 days
The Innolight 2W based PSL- IOO was implemented in the ~ summer of 2010 |
6741
|
Fri Jun 1 10:00:03 2012 |
steve | Omnistructure | General | 40m Wireless Network |
Quote: |
Mike Pedraza came by today to install a new wireless network router configured for the 40m lab network. It has a 'secret' SSID i.e. not meant for public use outside the lab. You can look up the password and network name on the rack. Pictures below show the location of the labels.

|
Mike P swapped in a new network router Linksys E1000 |
6744
|
Fri Jun 1 18:07:32 2012 |
steve | Update | SUS | Oplevs servo values |
Quote: |
For some reason the state of the oplevs is completely different for almost every suspension. They have different sets of filters in the bank, and different filters engaged. wtf? How did this happen? Is this correct? Do we expect that the state of the oplevs should be different on all the different suspensions? I wouldn't have thought so.
I discovered this because the PRM is unstable with the oplevs engaged. I don't think it was yesterday. Is something hidden changing the oplev settings?
|
As of February 23, 2012 when oplev PIT and YAW transfer functions were taken
OPLEV SERVO |
300^ 2:0 |
BR |
ELP |
RLP |
RES |
GAIN |
QPD counts |
OD mm |
|
|
|
|
|
|
|
|
|
|
|
ETMY pit |
300^ 2:0 |
BR |
35 |
80 |
0.5 |
-1.5 |
15,500 |
~1 |
|
ETMY yaw |
300^ 2:0 |
BR |
35 |
80 |
0.6 |
-1.0 |
|
|
|
ETMX pit |
300^ 2:0 |
BR |
35 |
80 |
0.5 |
0.5 |
1,500 |
~1.5 |
|
ETMX yaw |
300^ 2:0 |
BR |
35 |
80 |
0.6 |
1.0 |
|
|
|
ITMY pit |
300^ 2:0 |
BR |
|
80 |
|
2.0 |
15,000 |
~2.5 |
|
ITMY yaw |
300^ 2:0 |
BR |
|
80 |
|
-4.0 |
|
|
|
ITMX pit |
300^ 2:0 |
BR |
|
80 |
|
1.0 |
1,350 |
~1.5 |
|
ITMX yaw |
300^ 2:0 |
BR |
|
80 |
|
-2.0 |
|
|
|
BS pit |
300^ 2:0 |
BR |
50 |
|
|
0.5 |
3,500 |
~1 |
|
BS yaw |
300^ 2:0 |
|
50 |
|
3.3 |
-1.0 |
|
|
|
PRM pit |
300^ 2:0 |
BR |
|
|
3.3 |
1.0 |
4,000 |
~2 |
|
PRM yaw |
300^ 2:0 |
BR |
35 |
|
3.3, 4 |
-0.5 |
|
|
|
SRM pit |
300^ 2:0 |
BR |
40 |
|
|
-2.0 |
2,600 |
~2.5 |
|
SRM yaw |
300^ 2:0 |
BR |
40 |
|
|
2.0 |
|
|
|
|
6752
|
Tue Jun 5 09:32:12 2012 |
steve | Update | SUS | PRM oscillation |
What not to do:
The PRM oplev servo was left on and it was driving this oscillation overnight. |
6753
|
Tue Jun 5 09:44:14 2012 |
steve | Update | PSL | ref cavity ion pump must be pumped |
Quote: |
The ref cavity ion pump was running at 7.7kV instead of 5kV
This Digitel SPC-1 20 l/s ion pump should be running at 5kV
|
I noticed that the ion pump was turned off.
It was turned ON. It showed 0.00 microA at 5kV The current display is not sensitive enough. There must be some small outgassing or leak. It adds up if we stop pumping.
We want to keep the reference cavity in pristine condition. It required the ion pump running all times. |
6754
|
Tue Jun 5 14:17:14 2012 |
steve | Update | PEM | air cond maintenance |
Air conditioning maintenance is scheduled for tomorrow from 8 to 11am |
6764
|
Wed Jun 6 09:27:09 2012 |
steve | Update | SUS | PRM damping restored |
Quote: |
What not to do:
The PRM oplev servo was left on and it was driving this oscillation overnight.
|
Oplev servo turned off and sus damping restored. What is kicking up the PRM? |
6765
|
Wed Jun 6 14:17:56 2012 |
steve | Update | Computers | iMac ordered |
Rana, Steve,
- Part number: Z0M6
Configuration
- 2.7GHz Quad-Core Intel Core i5
- 16GB 1333MHz DDR3 SDRAM - 4x4GB
- 1TB Serial ATA Drive
- AMD Radeon HD 6770M 512MB GDDR5
- Apple Mouse
- Apple Keyboard with Numeric Keypad (English) & User's Guide
- Accessory Kit
|
6766
|
Wed Jun 6 14:36:58 2012 |
steve | Update | SUS | ETMY oplev work finished |
Quote: |
Quote: |
Quote: |
The typical sign of a dying gas laser is that it glows for a few minutes only. The power supplies are fine.
Two new JDS - Uniphase 1103P lasers ( NT64-104 ) arriving on Monday, May 21
|
Yesterday I swapped in new He/Ne laser with output power 3.5 mW The return spot on qpd is large ~6mm in diameter and 20,500 counts
The spot size reduction require similar layout as ETMX oplev.
|
The oplev path is relayed and the spot size on the qpd is reduced. I still have to clean up and replace "Miki Mouse" lens holder.
|
Late entry for Monday morning June 4, 2012
Cables were stress relieved. Cable entry - exit ports enlarged. Air gaps were minimized. |
6781
|
Thu Jun 7 08:12:20 2012 |
steve | Update | SUS | PRM is still oscillating |
Quote: |
Quote: |
What not to do:
The PRM oplev servo was left on and it was driving this oscillation overnight.
|
Oplev servo turned off and sus damping restored. What is kicking up the PRM?
|
The PRM oscillation stopped by turnig off oplev servo.
Do not turn Oplev Servo on when PRM is missaligned !
|
6782
|
Thu Jun 7 09:52:05 2012 |
steve | Update | PEM | air cond maintenance |
Quote: |
Air conditioning maintenance is scheduled for tomorrow from 8 to 11am
|
Jeff checked and replaced filters as needed. Job completed this morning. |
6790
|
Fri Jun 8 15:24:08 2012 |
steve | Update | VAC | RGA scan at day 276 and pressure plots |
Quote: |
We tried not to open chambers above 10,000 particles of 0.5 micron cf/min
New items going in: 2 rasor beam traps, 5 badly oxidized old silver plated setscrew with spring loaded tips......to be replaced in the future, viton tips for eq screws....some are lose, gold plated allen wrench installed at ITMX bottom, reglued magnet on ITMX
Bad hardware things found: nylon ball "locking elements" on OSEM locking set screws with screwdriver slot, lose 1064 nm filter on OSEM pd
|
40m - pumpdown 71- maglev pumping speed - at day 276........all normal |
6791
|
Mon Jun 11 09:37:16 2012 |
steve | Update | IOO | PMC locked |
Quote: |
Quote: |
IOO Angle & IOO Position QPDs centered.
|
PMC trend of 400 and 1200 days
The Innolight 2W based PSL- IOO was implemented in the ~ summer of 2010
|
The PMC was locked and the MC followed intantly |
6804
|
Tue Jun 12 16:33:32 2012 |
steve | Update | SUS | PRM oplevs servo ON for confirmation |
Quote: |
Yuta claims he fixed the PRM oplev by centering it the other day, but no one has left it on and watched it for a long while, to make sure it's okay. We watched it now for ~2 min, and it was good, but we're leaving the oplevs off anyway for the night. Tomorrow we should restore PRM (it's currently restored), turn on the oplevs, and let it sit to make sure it doesn't go crazy.
|
PRM oplev servo was turned on with PITgain 0.5 and YAWgain -0.7
Note: gain settings were PIT 1.0 and YAW --0.5 on Jun 1, 2012 that I measured Feb 23, 2012 |
6805
|
Tue Jun 12 17:04:55 2012 |
steve | Update | SUS | PRM oplevs servo is still bad |
Quote: |
Quote: |
Yuta claims he fixed the PRM oplev by centering it the other day, but no one has left it on and watched it for a long while, to make sure it's okay. We watched it now for ~2 min, and it was good, but we're leaving the oplevs off anyway for the night. Tomorrow we should restore PRM (it's currently restored), turn on the oplevs, and let it sit to make sure it doesn't go crazy.
|
PRM oplev servo was turned on with PITgain 0.5 and YAWgain -0.7
Note: gain settings were PIT 1.0 and YAW --0.5 on Jun 1, 2012 that I measured Feb 23, 2012
|
It is still oscillating. Gains turned down to zero. |
6814
|
Wed Jun 13 11:19:05 2012 |
steve | Update | SUS | IDC receptacles clamped |
The MC_ IDC 64 pin cables from sat. amplifiers to junction-interface-board towards whitening - dewhitening at the back of rack 1 X 5 are finally clamped with
All other sus cables of the same kind have the correct short latch arm to lock them in for reliable contact. |
6844
|
Thu Jun 21 09:01:18 2012 |
steve | Update | STACIS | the resurrection of STACIS -surf |
There is a small wood cabinet under the south end flow bench, labeled STACIS.
Unit is complete with extension cards and cables. |
6845
|
Thu Jun 21 09:10:08 2012 |
steve | Update | PEM | flow bench must be running all times |
The south end flow bench HEPA filter should be run all times. You can turn it off for a measurement or two but remember we are storing clean optics there.
The zero count bench will reach room particle count ~ 10,000 in one minute. |
6848
|
Thu Jun 21 15:00:55 2012 |
steve | Update | SAFETY | SURFs 2012 safety training |
Masha, Eric, Yaakov, Liz and Sasha received 40m specific basic safety training. |
6860
|
Sat Jun 23 18:44:15 2012 |
steve | Update | General | power surge has no effect on the lab |
I was notified by CIT Utilities that there was a power surge or short power outage this after noon.
Lab conditions are normal: c1ioo is down. The south arm AC was off......I turned it back on. |
6864
|
Mon Jun 25 08:21:40 2012 |
steve | Update | General | AC power disturbance on Sat |
Quote: |
I was notified by CIT Utilities that there was a power surge or short power outage this after noon.
Lab conditions are normal: c1ioo is down. The south arm AC was off......I turned it back on.
|
CALIFORNIA INSTITUTE OF TECHNOLOGY
FACILITIES MANAGEMENT
UTILITY & SERVICE INTERRUPTION
**PLEASE POST**
Building: CAMPUS
Date: Saturday, June 23, 2012
Time: 3:46 P.M.
Interruption: Electrical Power Disturbance
Contact: Tom Brennan, x-625-395-4984
*The City of Pasadena Water & Power Department had a 34,000-volt line event on Saturday June 23 at 3:46 p.m. This caused a city wide disturbance on the power grid. The Campus did not lose electrical power. However, the disturbance may have affected sensitive electronic equipment.
(If there is a problem with this Interruption, please notify the Service Center X-4717 or the above Contact as soon as possible.
If no response is received we will proceed with the interruption.)
Jerry Thompson,
Interim Director of Campus Operations & Maintenance
|
6894
|
Fri Jun 29 11:02:00 2012 |
steve | Update | VAC | the vent is at 500 torr |
Steve, Yuta and Jamie
Jam nuts were checked and oplev servos were turned off. Sus summery is below with strain gauge values. Are the strain gauge values have any meaning when the PZT contorrels are off?????????????????? |
6895
|
Fri Jun 29 13:11:31 2012 |
steve | Update | VAC | 40m IFO at atm |
The 4 hrs vent plot at 3 torr/min rate.
Nitrogen was used from 1e-6 torr to 35 torr at intake pressure 14 PSI
The rest was filled with 5 cylinders of Instrument Grade Air at intake pressure 14 PSI
We can start opening chamber at 3 pm today
|
6898
|
Sat Jun 30 18:31:38 2012 |
steve | Update | IOO | input telescope beam clipping on Faraday |
We could set up a simple pick off after the Faraday and bring it out the north window of IOO chamber. No monitor needed, just take the cover off when you want to see it.
Most people have no idea how to get the MC through the F |
6906
|
Tue Jul 3 17:23:50 2012 |
steve | Update | VAC | pumpdown completed |
Vacuum Normal State is reached in 9 hours. CC1 = 2e-5 Torr
Aux dry pump #3 is still running. The RGA is not pumped yet. |
6927
|
Fri Jul 6 08:38:04 2012 |
steve | Update | Computers | time out |
Why do we have these timing blanks? |
6929
|
Fri Jul 6 09:27:40 2012 |
steve | Update | VAC | 4 days at atm |
I'm looking for some movement indicators of the vent-pump down events.
|
6930
|
Fri Jul 6 09:52:35 2012 |
steve | Update | VAC | pump down hick up |
I can not understand what really happened here with CC1 gauge or there was really a pressure glitch.
attachment 1, pump down day 3 with 4th of July fireworks in the lab
attachment 2, before and after vent in 9 days
|
6959
|
Wed Jul 11 11:18:21 2012 |
steve | Update | PEM | more seismic noise next week |
The fabricators of the big flume in the CES lab have begun testing the sediment feed system which is the noisiest component and plan to test off and on during the day for the next week.
Please let me know if you detect the noise or have any issues.
Brian Fuller
phone: 626-395-2465 |
6970
|
Thu Jul 12 16:27:04 2012 |
steve | Update | VAC | drypump changed |
TP2 dry_pump was changed at intake pressure 982 mTorr at 84,889 hrs This seal hold up for one year.
The rebuilt pump seal performing well at 28 mTorr |
7044
|
Fri Jul 27 14:28:36 2012 |
steve | Update | VAC | cold cathode gauges |
Our cold cathode 423 gauges are 10 years old. They get insulated by age and show no ionization current. We should replace them at the next vent. I'm buying 4 at $317ea
|
7047
|
Mon Jul 30 09:00:18 2012 |
steve | Update | PSL | PMC is still not fixed |
The PMC was locking right the way, but it's transmission would not go up. Finally I get it back up by moving the "sticky" DC Gain slider up and down a few times. |
7051
|
Mon Jul 30 15:49:16 2012 |
steve | Update | VAC | cc1 switched |
Quote: |
Our cold cathode 423 gauges are 10 years old. They get insulated by age and show no ionization current. We should replace them at the next vent. I'm buying 4 at $317ea
|
We have two CC1 gauges at the pump spool. One is in vertical position and the spare is in horizontal. Today I switched the cable from vertical to horizontal CC1
This one is reading higher pressure. It is an old dirty gauge. It may trigger the RGA protection when it's reading goes above 1e-5 torr
The real pressure is 2e-6 torr |
7056
|
Tue Jul 31 08:01:22 2012 |
steve | Update | VAC | cc1 switched |
Quote: |
Quote: |
Our cold cathode 423 gauges are 10 years old. They get insulated by age and show no ionization current. We should replace them at the next vent. I'm buying 4 at $317ea
|
We have two CC1 gauges at the pump spool. One is in vertical position and the spare is in horizontal. Today I switched the cable from vertical to horizontal CC1
This one is reading higher pressure. It is an old dirty gauge. It may trigger the RGA protection when it's reading goes above 1e-5 torr
The real pressure is 2e-6 torr
|
cc1h spikes closed VM1 last night. VM1 is opened. |
7071
|
Wed Aug 1 16:38:46 2012 |
steve | Update | SUS | spare SRMU 03 optic moved |
SOS optics prepared to be hanged are moved from the South Flow Bench to S15 Clean Cabinet.
SRMU 03 (1-25-2010) specification summery E080460-05-D, older vintage SRM 01 and PRM 02 (need more specification)
There was one NOT MARKED SOS with two broken magnets on its face. This is labeled ???
This was done to prepare clean space for TIP-TILT drive- test set up.
The existing cable from 1X5 can reach only to the south end: from whitening filter to satelite amp. This will be good for future test of suspensions.
We need to make new cable from 1 X 1 to the south end = 40m long |
7087
|
Mon Aug 6 07:59:33 2012 |
steve | Update | SUS | PRM oplevs servo is still bad |
Quote: |
Quote: |
Quote: |
Yuta claims he fixed the PRM oplev by centering it the other day, but no one has left it on and watched it for a long while, to make sure it's okay. We watched it now for ~2 min, and it was good, but we're leaving the oplevs off anyway for the night. Tomorrow we should restore PRM (it's currently restored), turn on the oplevs, and let it sit to make sure it doesn't go crazy.
|
PRM oplev servo was turned on with PITgain 0.5 and YAWgain -0.7
Note: gain settings were PIT 1.0 and YAW --0.5 on Jun 1, 2012 that I measured Feb 23, 2012
|
It is still oscillating. Gains turned down to zero.
|
Earthquake test our suspensions PRM damping restored. Oplev servo gains turned to zero. |
7088
|
Mon Aug 6 09:46:31 2012 |
steve | Update | IOO | poweroutage turns laser off |
. Power outage turned off the PSL Innolight laser on Sunday afternoon. It was turned back on and locked happily right on. The green lasers were not effected.
CALIFORNIA INSTITUTE OF TECHNOLOGY
FACILITIES MANAGEMENT
UTILITY & SERVICE INTERRUPTION
**PLEASE POST**
Building: CAMPUS WIDE
Date: SUNDAY, AUGUST 6, 2012
Time: 3:41 PM
Interruption: ELECTRICAL POWER DISTRIBUTION
Contact: MIKE ANCHONDO, X-4999, OR TOM BRENNAN, X-4984
* THIS PAST SUNDAY AFTERNOON ABOUT 3:40 PM, PASADENA WATER AND POWER
EXPERIENCED A FAULT ON THEIR POWER DISTRIBUTION SYSTEM. THIS CAUSED
A SEVERE VOLTAGE SAG WHICH AFFECTED THE CALTECH CAMPUS. THE FAULT WAS
NOT ON A CALTECH CIRCUIT.
(If there is a problem with this Interruption, please notify
the Service Center X-4717 or the above Contact as soon as possible.
If no response is received we will proceed with the interruption.)
Jerry Thompson,
Interim Director of Campus Operations & Maintenance
|
7089
|
Mon Aug 6 10:53:32 2012 |
steve | Update | VAC | status: vauum normal |
The power outage did not have any effect on the vacuum system. I had to open VM1 to the RGA because of flaky CC1 cold cathode gauge fluctuations.
We are running on the vertically positioned CC1 again.
Note: rga scans with closed VM1 are back ground scans. |
7091
|
Mon Aug 6 16:48:43 2012 |
steve | Update | SUS | SRM oplev is clipping |
The SRM oplev beam is clipping. |
7106
|
Tue Aug 7 16:11:23 2012 |
steve | Update | SUS | optical table box wall proposal |
Sanwiched wall as shown: 1" clear acrylic, 2 layers of 0.004" thick "window tint", 1 layer of 0.007" thermashield and 0.125" yellow acrylic
Visibility: 70 %, Transmission of 1064 nm 2-3 % at 0-50 degrees incident power density 0.7 W/mm2
Max power 100 mW
|
7154
|
Sun Aug 12 01:21:26 2012 |
steve | Update | SAFETY | exit door left unlocked |
Caltech security called me at 1am Sunday. Control room emergency exit door was found unlocked!
It is your responsibility to lock door if you unlocked it !
|
7160
|
Mon Aug 13 15:31:09 2012 |
steve | Update | General | larger optical tables at the ends |
I'm proposing larger optical tables at the ends to avoid the existing overcrowding. This would allow the initial pointing and optical level beams to set up correctly.
The existing table is 4 x 2 would be replaced by 4' x 3' We would lose only ~3" space toward exist door.
I'm working on the new ACRYLIC TABLE COVER for each end that will cost around $4k ea. The new cover should fit the larger table.
Let me know what you think. |
7194
|
Wed Aug 15 16:01:47 2012 |
steve | Update | General | larger optical tables at the ends ? |
The drawing of the 4' x 2' table cover can be seen at entry #6190 The new proposed wall #7106 The yellow acrylic would be ~ 0.25" thick and it will be the inside. It is not shown on the drawing.
Question remaining: should get a larger table 4' x 3' as outlined by red lines and make new cover to fit this
The oplev beam path needs larger incident angle to get in and out of the chamber: REMOVE BOTTLENECK for easy traffic
Moving the existing table closer to ETMY chamber - as Jamie suggested- would help but there is no room for this solution.
The larger table solve this issue and leave more room for initial pointing, arm transmitted and future experiments.
Other benefits: no tube to make between table and chamber. It is easier to make the the larger box air tight.
The new isolation box with feed through, cover, seals will cost $4-5K ea
|
7248
|
Wed Aug 22 11:41:20 2012 |
steve | Update | General | grout plate for optical table at the ends |
Reinforced concrete grout plate for existing carbon steel stands at the ends.
|
7458
|
Mon Oct 1 17:03:01 2012 |
steve | Update | SUS | ETMY oplev relayed |
Quote: |
Quote: |
Quote: |
The typical sign of a dying gas laser is that it glows for a few minutes only. The power supplies are fine.
Two new JDS - Uniphase 1103P lasers ( NT64-104 ) arriving on Monday, May 21
|
Yesterday I swapped in new He/Ne laser with output power 3.5 mW The return spot on qpd is large ~6mm in diameter and 20,500 counts
The spot size reduction require similar layout as ETMX oplev.
|
The oplev path is relayed and the spot size on the qpd is reduced. I still have to clean up and replace "Miki Mouse" lens holder.
There was no IP-ANG coming out of the chamber at this time!
|
I did relayed the oplev path with new f 500 mm lens |
7538
|
Fri Oct 12 16:59:26 2012 |
steve | Update | SUS | TT PITCH damping |
Quote: |
Quote: |
We can only decide the need of pitch damping when the coils are activated.
|
Could you tell us why? Are you thinking about induced current damping?
|
I was wrong The instability will be the same when the coils are actuated. |
7544
|
Mon Oct 15 08:08:33 2012 |
steve | Update | SUS | PRM damping restored |
Quote: |
Quote: |
Quote: |
Quote: |
Yuta claims he fixed the PRM oplev by centering it the other day, but no one has left it on and watched it for a long while, to make sure it's okay. We watched it now for ~2 min, and it was good, but we're leaving the oplevs off anyway for the night. Tomorrow we should restore PRM (it's currently restored), turn on the oplevs, and let it sit to make sure it doesn't go crazy.
|
PRM oplev servo was turned on with PITgain 0.5 and YAWgain -0.7
Note: gain settings were PIT 1.0 and YAW --0.5 on Jun 1, 2012 that I measured Feb 23, 2012
|
It is still oscillating. Gains turned down to zero.
|
Earthquake test our suspensions PRM damping restored. Oplev servo gains turned to zero.
|
The PRM damping restored. Oplev PIT gain 0.15 and YAW gain -0.3 turned to zero. |